Year |
Citation |
Score |
2020 |
Thoney KA, Sas I, Joines JA, King RE. Logistics of carpet recycling in the U.S.: designing the recycling network Journal of the Textile Institute. 1-11. DOI: 10.1080/00405000.2020.1723257 |
0.695 |
|
2019 |
McConnell BM, Hodgson TJ, Kay MG, King RE, Liu Y, Parlier GH, Thoney-Barletta K, Wilson JR. Assessing uncertainty and risk in an expeditionary military logistics network The Journal of Defense Modeling and Simulation. 154851291986059. DOI: 10.1177/1548512919860595 |
0.578 |
|
2019 |
Sas I, Joines JA, Thoney KA, King RE. Logistics of carpet recycling in the U.S.: designing the collection network Journal of the Textile Institute. 110: 328-337. DOI: 10.1080/00405000.2018.1480101 |
0.746 |
|
2019 |
Nagulpelli KS, King RE, Warsing D. Integrated traditional and additive manufacturing production profitability model Procedia Manufacturing. 34: 619-630. DOI: 10.1016/J.Promfg.2019.06.121 |
0.331 |
|
2019 |
Warsing DP, Wangwatcharakul W, King RE. Computing base-stock levels for a two-stage supply chain with uncertain supply Omega-International Journal of Management Science. 89: 92-109. DOI: 10.1016/J.Omega.2018.10.001 |
0.776 |
|
2017 |
Ahiska SS, Gocer F, King RE. Heuristic inventory policies for a hybrid manufacturing/remanufacturing system with product substitution Computers & Industrial Engineering. 114: 206-222. DOI: 10.1016/J.Cie.2017.10.014 |
0.467 |
|
2015 |
Ahiska SS, King RE. Inventory policy characterisation methodologies for a single-product recoverable manufacturing system European Journal of Industrial Engineering. 9: 222-243. DOI: 10.1504/Ejie.2015.068652 |
0.824 |
|
2015 |
Hanson BB, Hodgson TJ, Kay MG, King RE, Thoney-Barletta KA. On the economic lot scheduling problem: stock-out prevention and system feasibility International Journal of Production Research. DOI: 10.1080/00207543.2015.1005246 |
0.725 |
|
2014 |
Lobo BJ, Wilson JR, Thoney KA, Hodgson TJ, King RE. A practical method for evaluating worker allocations in large-scale dual resource constrained job shops Iie Transactions (Institute of Industrial Engineers). 46: 1209-1226. DOI: 10.1080/0740817X.2014.892231 |
0.802 |
|
2014 |
Bucci MJ, Woolard R, Joines J, Thoney K, King RE. Incorporating economies of scale into facility location problems in carpet recycling Journal of the Textile Institute. 105: 1300-1311. DOI: 10.1080/00405000.2014.890833 |
0.741 |
|
2013 |
Ahiska SS, Appaji SR, King RE, Warsing DP. A Markov decision process-based policy characterization approach for a stochastic inventory control problem with unreliable sourcing International Journal of Production Economics. 144: 485-496. DOI: 10.1016/J.Ijpe.2013.03.021 |
0.802 |
|
2013 |
Warsing DP, Wangwatcharakul W, King RE. Computing optimal base-stock levels for an inventory system with imperfect supply Computers and Operations Research. 40: 2786-2800. DOI: 10.1016/J.Cor.2013.04.001 |
0.79 |
|
2013 |
Lobo BJ, Hodgson TJ, King RE, Thoney KA, Wilson JR. Allocating job-shop manpower to minimize Lmax: Optimality criteria, search heuristics, and probabilistic quality metrics Computers and Operations Research. 40: 2569-2584. DOI: 10.1016/J.Cor.2013.02.008 |
0.807 |
|
2013 |
Lobo BJ, Hodgson TJ, King RE, Thoney KA, Wilson JR. An effective lower bound on Lmax in a worker-constrained job shop Computers and Operations Research. 40: 328-343. DOI: 10.1016/J.Cor.2012.07.003 |
0.806 |
|
2013 |
Ahiska SS, Kurtul E, King RE. Determining the value of product substitution for a stochastic manufacturing/remanufacturing system Iie Annual Conference and Expo 2013. 3924-3933. |
0.795 |
|
2012 |
Hartman L, Joines JA, Thoney KA, King RE. The effect speed and replenishment flexibility has on overall costs of sourcing apparel products Journal of the Textile Institute. 103: 604-621. DOI: 10.1080/00405000.2011.595106 |
0.729 |
|
2012 |
Vila-Parrish AR, Ivy JS, King RE, Abel SR. Patient-based pharmaceutical inventory management: a two-stage inventory and production model for perishable products with Markovian demand Health Systems. 1: 69-83. DOI: 10.1057/Hs.2012.2 |
0.393 |
|
2011 |
Davis LB, King RE, Hodgson TJ, Wei W. Information sharing in capacity constrained supply chains under lost sales International Journal of Production Research. 49: 7469-7491. DOI: 10.1080/00207543.2010.535037 |
0.598 |
|
2011 |
Wang Y, King RE, Ahiska SS, Warsing DP. Optimal ordering policy with multiple unreliable suppliers 61st Annual Iie Conference and Expo Proceedings. |
0.782 |
|
2010 |
Sebnem Ahiska S, King RE. Inventory optimization in a one product recoverable manufacturing system International Journal of Production Economics. 124: 11-19. DOI: 10.1016/J.Ijpe.2009.09.002 |
0.43 |
|
2010 |
Ahiska SS, King RE. Life cycle inventory policy characterizations for a single-product recoverable system International Journal of Production Economics. 124: 51-61. DOI: 10.1016/J.Ijpe.2009.08.033 |
0.795 |
|
2009 |
Davis LB, Hodgson TJ, King RE, Wei W. Technical note: A computationally efficient algorithm for undiscounted Markov Decision processes with restricted observations Naval Research Logistics. 56: 86-92. DOI: 10.1002/Nav.20329 |
0.683 |
|
2007 |
Taner MR, Hodgson TJ, King RE, Schultz SR. Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure Computers and Industrial Engineering. 52: 57-70. DOI: 10.1016/J.Cie.2006.10.008 |
0.793 |
|
2006 |
Stanfield PM, King RE, Hodgson TJ. Determining sequence and ready times in a remanufacturing system Iie Transactions (Institute of Industrial Engineers). 38: 565-575. DOI: 10.1080/07408170500371830 |
0.7 |
|
2004 |
Stanfield PM, Wilson JR, King RE. Flexible modelling of correlated operation times with application in product-reuse facilities International Journal of Production Research. 42: 2179-2196. DOI: 10.1080/0020754042000203903 |
0.357 |
|
2004 |
Schultz SR, Hodgson TJ, King RE, Thoney KA. Minimizing Lmax for large-scale, job-shop scheduling problems International Journal of Production Research. 42: 4893-4907. DOI: 10.1080/00207540410001721754 |
0.814 |
|
2004 |
Schultz SR, Hodgson TJ, King RE, Taner MR. Minimizing Lmax for the single machine scheduling problem with family set-ups International Journal of Production Research. 42: 4315-4330. DOI: 10.1080/00207540410001716561 |
0.816 |
|
2004 |
Wilson AD, King RE, Wilson JR. Case study on statistically estimating minimum makespan for flow line scheduling problems European Journal of Operational Research. 155: 439-454. DOI: 10.1016/S0377-2217(02)00910-4 |
0.424 |
|
2004 |
Wilson AD, King RE, Hodgson TJ. Scheduling non-similar groups on a flow line: Multiple group setups Robotics and Computer-Integrated Manufacturing. 20: 505-515. DOI: 10.1016/J.Rcim.2004.07.002 |
0.644 |
|
2003 |
Taner MR, Hodgson TJ, King RE, Thoney KA. Satisfying due-dates in a job shop with sequence-dependent family set-ups International Journal of Production Research. 41: 4153-4169. DOI: 10.1080/0020754031000149167 |
0.802 |
|
2003 |
Zozom A, Hodgson TJ, King RE, Weintraub AJ, Cormier D. Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates International Journal of Production Research. 41: 31-45. DOI: 10.1080/00207540210162992 |
0.698 |
|
2002 |
Mattila H, King R, Ojala N. Retail performance measures for seasonal fashion Journal of Fashion Marketing and Management. 6: 340-351. DOI: 10.1108/13612020210448637 |
0.358 |
|
2002 |
Thoney KA, Hodgson TJ, King RE, Taner MR, Wilson AD. Satisfying due-dates in large multi-factory supply chains Iie Transactions. 34: 803-811. DOI: 10.1080/07408170208928913 |
0.805 |
|
2002 |
King RE, Moon WK, Nuttle HLW, Thoney KA. Case Study Analysis of Inventory Stocking Policies to Support Replenishment: A Supply-chain Perspective Journal of the Textile Institute. 93: 25-35. DOI: 10.1080/00405000208658356 |
0.742 |
|
2002 |
King RE, Brain LAC, Thoney KA. Control of yarn inventory for a cotton spinning plant: Part 1: Uncorrelated demand Journal of Textile and Apparel, Technology and Management. 2. |
0.665 |
|
2000 |
Joines JA, Kay MG, King RE, Culbreth CT. A hybrid genetic algorithm for manufacturing cell design Journal of the Chinese Institute of Industrial Engineers. 17: 549-564. DOI: 10.1080/10170669.2000.10432875 |
0.402 |
|
2000 |
Nuttle HLW, King RE, Fang SC, Wilson JR, Hunter NA. Simulation modeling of the textile supply chain. Part II: Results and research directions Journal of the Textile Institute. 91: 51-64. DOI: 10.1080/00405000008659527 |
0.341 |
|
2000 |
Nuttle HLW, King RE, Hunter NA, Wilson JR, Fang SC. Simulation Modeling of the Textile Supply Chain. Part I: The Textile-plant Models Journal of the Textile Institute. 91: 35-50. DOI: 10.1080/00405000008659526 |
0.327 |
|
2000 |
Hodgson TJ, King RE, Thoney K, Stanislaw N, Weintraub AJ, Zozom A. On satisfying due-dates in large job shops: Idle time insertion Iie Transactions (Institute of Industrial Engineers). 32: 177-180. DOI: 10.1023/A:1007618532627 |
0.815 |
|
1999 |
Weintraub A, Cormier D, Hodgson T, King R, Wilson J, Zozom A. Scheduling with alternatives: a link between process planning and scheduling Iie Transactions (Institute of Industrial Engineers). 31: 1093-1102. DOI: 10.1080/07408179908969910 |
0.717 |
|
1997 |
Hodgson TJ, King RE, Stanfield PM. Ready-time scheduling with stochastic service times Operations Research. 45: 779-783. DOI: 10.1287/Opre.45.5.779 |
0.687 |
|
1997 |
Hodgson TJ, Ge G, King RE, Said H. Dynamic lot size/sequencing policies in a multi-product, single-machine system Iie Transactions (Institute of Industrial Engineers). 29: 127-137. DOI: 10.1080/07408179708966320 |
0.667 |
|
1997 |
Stanfield PM, King RE, Hodgson TJ. Multi-objective stochastic scheduling of job ready times Annals of Operations Research. 70: 221-239. DOI: 10.1023/A:1018974221508 |
0.689 |
|
1996 |
Joines JA, Thomas Culbreth C, King RE. Manufacturing cell design: An integer programming model employing genetic algorithms Iie Transactions (Institute of Industrial Engineers). 28: 69-85. DOI: 10.1080/07408179608966253 |
0.399 |
|
1996 |
Hunter NA, King RE, Nuttle HLW. Evaluation of Traditional and Quick-response Retailing Procedures by Using a Stochastic Simulation Model Journal of the Textile Institute. 87: 42-55. DOI: 10.1080/00405009608659101 |
0.306 |
|
1996 |
King RE, Hunter NA. Demand re-estimation and inventory replenishment of basic apparel in a specialty retail Chain Journal of the Textile Institute. 87: 31-41. DOI: 10.1080/00405009608659100 |
0.348 |
|
1996 |
Stanfield PM, King RE, Joines JA. Scheduling arrivals to a production system in a fuzzy environment European Journal of Operational Research. 93: 75-87. DOI: 10.1016/0377-2217(95)00117-4 |
0.46 |
|
1993 |
Hunter NA, King RE, Nuttle HLW, Wilson JR. North Carolina Apparel Pipeline Modelling Project International Journal of Clothing Science and Technology. 5: 19-24. DOI: 10.1108/Eb003016 |
0.319 |
|
1993 |
King RE, Hodgson TJ, Chafee FW. Robot Task Scheduling in a Flexible Manufacturing Cell Iie Transactions (Institute of Industrial Engineers). 25: 80-87. DOI: 10.1080/07408179308964280 |
0.686 |
|
1992 |
Deleersnyder JL, Hodgson TJ, King RE, O’Grady PJ, Saw A A. Integrating Kanban Type Pull Systems and MRP type Push Systems: Insights from a Markovian Model Iie Transactions (Institute of Industrial Engineers). 24: 43-56. DOI: 10.1080/07408179208964223 |
0.601 |
|
1992 |
Hunter NA, King RE, Nuttle HLW. An apparel-supply system for QR retailing Journal of the Textile Institute. 83: 462-471. DOI: 10.1080/00405009208631220 |
0.341 |
|
1991 |
Nuttle HLW, King RE, Hunter NA. A stochastic model of the apparel-retailing process for seasonal apparel Journal of the Textile Institute. 82: 247-259. DOI: 10.1080/00405009508658762 |
0.337 |
|
1988 |
Ding FY, Hodgson TJ, King RE. A methodology for computation reduction for specially structured large scale Markov decision problems European Journal of Operational Research. 34: 105-112. DOI: 10.1016/0377-2217(88)90461-4 |
0.687 |
|
1987 |
Hodgson TJ, King RE, McClave JT, Sullivan JH, Zegel WC. Analysis and Modeling of a Proposed Mining and Beneficiation Process. Industrial & Engineering Chemistry Research. 26: 2223-2228. DOI: 10.1021/Ie00071A009 |
0.578 |
|
Show low-probability matches. |