Ruonan Zhang, Ph.D. - Publications

Affiliations: 
2011 Simon Fraser University, Burnaby, British Columbia, Canada 
Area:
Mathematics

19 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2017 Ćustić A, Zhang R, Punnen AP. The quadratic minimum spanning tree problem and its variations Discrete Optimization. 27: 73-87. DOI: 10.1016/J.Disopt.2017.09.003  0.662
2015 Zhang R. On configurations where the Loomis-Whitney inequality is nearly sharp and applications to the furstenberg set problem Mathematika. 61: 145-161. DOI: 10.1112/S0025579314000357  0.386
2013 Zhang R. A simulated annealing-based heuristic algorithm for job shop scheduling to minimize lateness: Regular paper International Journal of Advanced Robotic Systems. 10. DOI: 10.5772/55956  0.382
2013 Öncan T, Zhang R, Punnen AP. The minimum cost perfect matching problem with conflict pair constraints Computers and Operations Research. 40: 920-930. DOI: 10.1016/J.Cor.2012.10.022  0.642
2013 Zhang R, Punnen AP. Quadratic bottleneck knapsack problems Journal of Heuristics. 19: 573-589. DOI: 10.1007/S10732-011-9175-1  0.663
2012 Punnen AP, Zhang R. Analysis of an approximate greedy algorithm for the maximum edge clique partitioning problem Discrete Optimization. 9: 205-208. DOI: 10.1016/J.Disopt.2012.05.002  0.664
2011 Zhang R. A differential evolution algorithm for job shop scheduling problems involving due date determination decisions International Journal of Digital Content Technology and Its Applications. 5: 388-396. DOI: 10.4156/jdcta.vol5.issue7.48  0.329
2011 Zhang R. A hybrid heuristic based on constraint propagation for the job shop scheduling problem International Journal of Digital Content Technology and Its Applications. 5: 412-418. DOI: 10.4156/jdcta.vol5.issue10.49  0.414
2011 Zhang R. A simulated annealing algorithm integrated with probabilistic constraint propagation for job shop scheduling Journal of Convergence Information Technology. 6: 324-331. DOI: 10.4156/jcit.vol6.issue10.41  0.364
2011 Zhang R. Artificial bee colony algorithm for solving a bi-objective job shop scheduling problem Advances in Information Sciences and Service Sciences. 3: 319-326. DOI: 10.4156/aiss.vol3.issue8.39  0.403
2011 Zhang R. A genetic local search algorithm based on insertion neighborhood for the job shop scheduling problem Advances in Information Sciences and Service Sciences. 3: 117-125. DOI: 10.4156/aiss.vol3.issue5.15  0.309
2011 Zhang R. A Genetic algorithm for solving the job shop scheduling problem with identical (Exchangeable) jobs Advances in Information Sciences and Service Sciences. 3. DOI: 10.4156/AISS.vol3.issue11.5  0.345
2011 Zhang R. An artificial bee colony algorithm based on problem data properties for scheduling job shops Procedia Engineering. 23: 131-136. DOI: 10.1016/j.proeng.2011.11.2478  0.371
2011 Zhang R, Kabadi SN, Punnen AP. The minimum spanning tree problem with conflict constraints and its variations Discrete Optimization. 8: 191-205. DOI: 10.1016/J.Disopt.2010.08.001  0.689
2011 Punnen AP, Zhang R. Quadratic bottleneck problems Naval Research Logistics. 58: 153-164. DOI: 10.1002/Nav.20446  0.686
2009 Punnen AP, Zhang R. Bottleneck flows in unit capacity networks Information Processing Letters. 109: 334-338. DOI: 10.1016/J.Ipl.2008.11.011  0.608
2003 Zhang R. Multistage bilevel programming problems Optimization. 52: 605-616. DOI: 10.1080/02331930310001611420  0.338
2002 Zhang R. Scheduling for maximum capacity in SDMA/TDMA networks Icassp, Ieee International Conference On Acoustics, Speech and Signal Processing - Proceedings. 3.  0.357
2001 Zhang R. Optimal space-time packet scheduling for reservation ALOHA networks Ieee Vehicular Technology Conference. 4: 2188-2191.  0.333
Show low-probability matches.