Year |
Citation |
Score |
2017 |
Li K, Zhang X, Leung JY, Cheng B. Integrated production and delivery withmultiple factories and multiple customers International Journal of Systems Science: Operations & Logistics. 4: 219-228. DOI: 10.1080/23302674.2016.1157221 |
0.383 |
|
2017 |
Chen R, Liang C, Gu D, Leung JY. A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution International Journal of Production Research. 55: 6207-6234. DOI: 10.1080/00207543.2017.1326641 |
0.358 |
|
2015 |
Wu Q, Leung JY, Yuan X, Huang X, Li H, Huang Z, Li Y. Biological risk, source and pollution history of organochlorine pesticides (OCPs) in the sediment in Nansha mangrove, South China. Marine Pollution Bulletin. 96: 57-64. PMID 26021291 DOI: 10.1016/j.marpolbul.2015.05.047 |
0.345 |
|
2015 |
Wu Q, Leung JY, Geng X, Chen S, Huang X, Li H, Huang Z, Zhu L, Chen J, Lu Y. Heavy metal contamination of soil and water in the vicinity of an abandoned e-waste recycling site: implications for dissemination of heavy metals. The Science of the Total Environment. 506: 217-25. PMID 25460954 DOI: 10.1016/j.scitotenv.2014.10.121 |
0.324 |
|
2012 |
Lee K, Choi B, Leung JY, Pinedo ML, Briskorn D. Minimizing the total weighted delivery time in container transportation scheduling Naval Research Logistics. 59: 266-277. DOI: 10.1002/Nav.21480 |
0.375 |
|
2011 |
Briskorn D, Leung J, Pinedo M. Robust scheduling on a single machine using time buffers Iie Transactions. 43: 383-398. DOI: 10.1080/0740817X.2010.505123 |
0.444 |
|
2008 |
Krasik V, Leung J, Pinedo M, Zhang J. Scheduling multiple products on parallel machines with setup costs Naval Research Logistics. 55: 654-669. DOI: 10.1002/Nav.20309 |
0.408 |
|
2006 |
Lee C, Leung JY, Yu G. Two Machine Scheduling under Disruptions with Transportation Considerations Journal of Scheduling. 9: 35-48. DOI: 10.1007/S10951-006-5592-7 |
0.443 |
|
2006 |
Leung JY, Li H, Pinedo M. Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel Naval Research Logistics. 53: 243-260. DOI: 10.1002/Nav.20138 |
0.513 |
|
2005 |
Leung JY, Zhao H. Minimizing mean flowtime and makespan on master--slave systems Journal of Parallel and Distributed Computing. 65: 843-856. DOI: 10.1016/J.Jpdc.2005.03.004 |
0.41 |
|
2005 |
Leung JY, Li H, Pinedo M. Order Scheduling in an Environment with Dedicated Resources in Parallel Journal of Scheduling. 8: 355-386. DOI: 10.1007/S10951-005-2860-X |
0.524 |
|
1991 |
Du J, Leung JY, Young GH. Scheduling chain-structured tasks to minimize makespan and mean flow time Information & Computation. 92: 219-236. DOI: 10.1016/0890-5401(91)90009-Q |
0.386 |
|
1989 |
Du J, Leung JY. Scheduling tree-structured tasks on two processors to minimize schedule length Siam Journal On Discrete Mathematics. 2: 176-196. DOI: 10.1137/0402016 |
0.33 |
|
1984 |
Leung JY, Vornberger O, Witthoff JD. On some variants of the bandwidth minimization problem Siam Journal On Computing. 13: 650-667. DOI: 10.1137/0213040 |
0.355 |
|
1984 |
Lee DT, Leung JY. On the 2-Dimensional Channel Assignment Problem Ieee Transactions On Computers. 33: 2-6. DOI: 10.1109/Tc.1984.5009310 |
0.326 |
|
1978 |
Coffman EG, Leung JY, Ting DW. Bin packing: Maximizing the number of pieces packed Acta Informatica. 9: 263-271. DOI: 10.1007/Bf00288885 |
0.375 |
|
Show low-probability matches. |