Kai Huang - Publications

Affiliations: 
Georgia Institute of Technology, Atlanta, GA 

13 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Taghavi M, Huang K. A Lagrangian relaxation approach for stochastic network capacity expansion with budget constraints Annals of Operations Research. 284: 605-621. DOI: 10.1007/S10479-018-2862-7  0.324
2018 Wang B, Huang K, Li T. Permutation flowshop scheduling with time lag constraints and makespan criterion Computers & Industrial Engineering. 120: 1-14. DOI: 10.1016/J.Cie.2018.04.021  0.319
2017 Zhao M, Huang K, Zeng B. A polyhedral study on chance constrained program with random right-hand side Mathematical Programming. 166: 19-64. DOI: 10.1007/S10107-016-1103-6  0.309
2016 Taghavi M, Huang K. A multi‐stage stochastic programming approach for network capacity expansion with multiple sources of capacity Naval Research Logistics. 63: 600-614. DOI: 10.1002/Nav.21726  0.309
2015 Huang K, Jiang Y, Yuan Y, Zhao L. Modeling multiple humanitarian objectives in emergency response to large-scale disasters Transportation Research Part E: Logistics and Transportation Review. 75: 1-17. DOI: 10.1016/J.Tre.2014.11.007  0.313
2015 Huang K, Kok ATd. Optimal FCFS allocation rules for periodic‐review assemble‐to‐order systems Naval Research Logistics. 62: 158-169. DOI: 10.1002/Nav.21620  0.305
2014 Taghavi M, Huang K. Stochastic capacity expansion with multiple sources of capacity Operations Research Letters. 42: 263-267. DOI: 10.1016/J.Orl.2014.04.005  0.326
2014 Jiang Y, Fu X, Huang K, Zhao L. A decomposable self-adaptive projection-based prediction-correction algorithm for convex time space network flow problem Applied Mathematics and Computation. 231: 422-434. DOI: 10.1016/J.Amc.2014.01.033  0.302
2013 Yu X, Zhang Y, Huang K. Minimizing the Makespan for Scheduling Problems with General Deterioration Effects Mathematical Problems in Engineering. 2013: 1-8. DOI: 10.1155/2013/218981  0.311
2010 Huang K, Ahmed S. A stochastic programming approach for planning horizons of infinite horizon capacity planning problems European Journal of Operational Research. 200: 74-84. DOI: 10.1016/J.Ejor.2008.12.009  0.465
2009 Huang K, Ahmed S. The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty Operations Research. 57: 893-904. DOI: 10.1287/Opre.1080.0623  0.471
2008 Huang K, Ahmed S. On a Multi-stage Stochastic Programming Model for Inventory Planning Infor. 46: 155-163. DOI: 10.3138/Infor.46.3.155  0.458
2008 Huang K, KüçüKyavuz S. On stochastic lot-sizing problems with random lead times Operations Research Letters. 36: 303-308. DOI: 10.1016/J.Orl.2007.10.009  0.326
Show low-probability matches.