Year |
Citation |
Score |
2019 |
Chen TT, Wang Y. An incremental learning and integer-nonlinear programming approach to mining users' unknown preferences for ubiquitous hotel recommendation Journal of Ambient Intelligence and Humanized Computing. 10: 2771-2780. DOI: 10.1007/S12652-018-0986-X |
0.375 |
|
2018 |
Wang Y, Chen TT. A Direct-solution Fuzzy Collaborative Intelligence Approach for Yield Forecasting in Semiconductor Manufacturing Procedia Manufacturing. 17: 110-117. DOI: 10.1016/J.Promfg.2018.10.021 |
0.336 |
|
2018 |
Wang Y, Kim D, Katayama H, Hsueh W. Optimization of machining economics and energy consumption in face milling operations The International Journal of Advanced Manufacturing Technology. 99: 2093-2100. DOI: 10.1007/S00170-018-1848-6 |
0.341 |
|
2017 |
Chen T, Wang Y. A nonlinearly normalized back propagation network and cloud computing approach for determining cycle time allowance during wafer fabrication Robotics and Computer-Integrated Manufacturing. 45: 144-156. DOI: 10.1016/J.Rcim.2015.11.005 |
0.308 |
|
2017 |
Chen T, Wang Y, Lin Z. Predictive distant operation and virtual control of computer numerical control machines Journal of Intelligent Manufacturing. 28: 1061-1077. DOI: 10.1007/S10845-014-1029-X |
0.319 |
|
2015 |
Wang YC, Wang MJ, Lin SC. Selection of cutting conditions for power constrained parallel machine scheduling Robotics and Computer-Integrated Manufacturing. DOI: 10.1016/J.Rcim.2015.10.010 |
0.357 |
|
2014 |
Chen T, Wang Y. An Agent-Based Fuzzy Collaborative Intelligence Approach for Precise and Accurate Semiconductor Yield Forecasting Ieee Transactions On Fuzzy Systems. 22: 201-211. DOI: 10.1109/Tfuzz.2013.2250290 |
0.414 |
|
2013 |
Chen T, Lin C, Wang Y. A Fuzzy Collaborative Forecasting Approach for WIP Level Estimation in a Wafer Fabrication Factory Applied Mathematics & Information Sciences. 7: 1465-1470. DOI: 10.12785/Amis/070427 |
0.347 |
|
2013 |
Chen T, Wang Y. A Fuzzy Rule for Improving the Performance of Multiobjective Job Dispatching in a Wafer Fabrication Factory Journal of Applied Mathematics. 2013: 1-18. DOI: 10.1155/2013/986172 |
0.386 |
|
2013 |
Chen T, Wang Y. Enhancing the Long-Term Yield Competitiveness of a Semiconductor Manufacturing Factory Using a Multiobjective Fuzzy Nonlinear Programming Approach Mathematical Problems in Engineering. 2013: 1-11. DOI: 10.1155/2013/784237 |
0.314 |
|
2013 |
Chen T, Wang Y. An Iterative Procedure for Optimizing the Performance of the Fuzzy-Neural Job Cycle Time Estimation Approach in a Wafer Fabrication Factory Mathematical Problems in Engineering. 2013: 1-15. DOI: 10.1155/2013/740478 |
0.369 |
|
2013 |
Wang Y, Chen T, Lin C. A slack-diversifying nonlinear fluctuation smoothing rule for job dispatching in a wafer fabrication factory Robotics and Computer-Integrated Manufacturing. 29: 41-47. DOI: 10.1016/J.Rcim.2012.04.011 |
0.32 |
|
2011 |
Wang YC, Chiu YC, Hung YP. Optimization of multi-task turning operations under minimal tool waste consideration Robotics and Computer-Integrated Manufacturing. 27: 674-680. DOI: 10.1016/J.Rcim.2010.12.003 |
0.34 |
|
2011 |
Chen T, Wang Y. A hybrid fuzzy and neural approach for forecasting the book-to-bill ratio in the semiconductor manufacturing industry. The International Journal of Advanced Manufacturing Technology. 52: 377-389. DOI: 10.1007/S00170-010-2712-5 |
0.343 |
|
2010 |
Chen T, Wang Y. Incorporating the FCM-BPN approach with nonlinear programming for internal due date assignment in a wafer fabrication plant Robotics and Computer-Integrated Manufacturing. 26: 83-91. DOI: 10.1016/J.Rcim.2009.04.001 |
0.33 |
|
2009 |
Chen T, Wang Y. A fuzzy set approach for evaluating and enhancing the mid-term competitiveness of a semiconductor factory Fuzzy Sets and Systems. 160: 569-585. DOI: 10.1016/J.Fss.2008.06.006 |
0.368 |
|
2009 |
Chen T, Wu H, Wang Y. Fuzzy-neural approaches with example post-classification for estimating job cycle time in a wafer fab Applied Soft Computing. 9: 1225-1231. DOI: 10.1016/J.Asoc.2009.03.006 |
0.343 |
|
2007 |
Wang Y. A note on 'optimization of multi-pass turning operations using ant colony system' International Journal of Machine Tools & Manufacture. 47: 2057-2059. DOI: 10.1016/J.Ijmachtools.2007.03.001 |
0.326 |
|
2005 |
Wang YC, Usher JM. Application of reinforcement learning for agent-based production scheduling Engineering Applications of Artificial Intelligence. 18: 73-82. DOI: 10.1016/J.Engappai.2004.08.018 |
0.624 |
|
2004 |
Wang YC, Usher JM. Learning policies for single machine job dispatching Robotics and Computer-Integrated Manufacturing. 20: 553-562. DOI: 10.1016/J.Rcim.2004.07.003 |
0.623 |
|
2004 |
Wang YC, Usher JM. A reinforcement learning approach for developing routing policies in multi-agent production scheduling Iie Annual Conference and Exhibition 2004. 1805-1810. DOI: 10.1007/S00170-006-0465-Y |
0.612 |
|
Show low-probability matches. |