Year |
Citation |
Score |
2020 |
Liu J, Zeng M, Ge Y, Wu C, Wang X. Improved Cuckoo Search algorithm for numerical function optimization Journal of Industrial and Management Optimization. 16: 103-115. DOI: 10.3934/Jimo.2018142 |
0.302 |
|
2020 |
Zhu J, Wu P, Chen M, Kim MJ, Wang X, Fang T. Automatically Processing IFC Clipping Representation for BIM and GIS Integration at the Process Level Applied Sciences. 10: 2009. DOI: 10.3390/App10062009 |
0.34 |
|
2020 |
Yang C, Shi Y, Li L, Wang X. Efficient Mode Transition Control for Parallel Hybrid Electric Vehicle With Adaptive Dual-Loop Control Framework Ieee Transactions On Vehicular Technology. 69: 1519-1532. DOI: 10.1109/Tvt.2019.2962509 |
0.307 |
|
2020 |
Zhu J, Tan Y, Wang X, Wu P. BIM/GIS integration for web GIS-based bridge management Annals of Gis: Geographic Information Sciences. 1-11. DOI: 10.1080/19475683.2020.1743355 |
0.307 |
|
2020 |
Wang X, Yew AWW, Ong SK, Nee AYC. Enhancing smart shop floor management with ubiquitous augmented reality International Journal of Production Research. 58: 2352-2367. DOI: 10.1080/00207543.2019.1629667 |
0.329 |
|
2020 |
Lee C, Chong H, Li Q, Wang X. Joint Contract–Function Effects on BIM-Enabled EPC Project Performance Journal of Construction Engineering and Management. 146: 04020008. DOI: 10.1061/(Asce)Co.1943-7862.0001766 |
0.301 |
|
2020 |
Cheng S, Li L, Chen X, Fang S, Wang X, Wu X, Li W. Longitudinal autonomous driving based on game theory for intelligent hybrid electric vehicles with connectivity Applied Energy. 268: 115030. DOI: 10.1016/J.Apenergy.2020.115030 |
0.313 |
|
2020 |
Qu X, Yu Y, Zhou M, Lin C, Wang X. Jointly dampening traffic oscillations and improving energy consumption with electric, connected and automated vehicles: A reinforcement learning based approach Applied Energy. 257: 114030. DOI: 10.1016/J.Apenergy.2019.114030 |
0.305 |
|
2020 |
Ong SK, Wang X, Nee AYC. 3D bare-hand interactions enabling ubiquitous interactions with smart objects Advances in Manufacturing. 8: 133-143. DOI: 10.1007/S40436-020-00295-1 |
0.31 |
|
2019 |
Peng H, Wang W, Xiang C, Li L, Wang X. Torque Coordinated Control of Four In-Wheel Motor Independent-Drive Vehicles With Consideration of the Safety and Economy Ieee Transactions On Vehicular Technology. 68: 9604-9618. DOI: 10.1109/Tvt.2019.2935617 |
0.318 |
|
2019 |
Huang C, Wang X, Li L, Chen X. Multistructure Radial Basis Function Neural-Networks-Based Extended Model Predictive Control: Application to Clutch Control Ieee-Asme Transactions On Mechatronics. 24: 2519-2530. DOI: 10.1109/Tmech.2019.2949001 |
0.314 |
|
2019 |
Zhao X, Liu C, Li L, Zhang Z, Cheng S, Wang X. Cooperative Control of Clutch and Hydraulic Control Unit Ieee Transactions On Industrial Electronics. 66: 7209-7218. DOI: 10.1109/Tie.2018.2874615 |
0.305 |
|
2019 |
Shi J, Li L, Wang X, Liu C. Robust output feedback controller with high-gain observer for automatic clutch Mechanical Systems and Signal Processing. 132: 806-822. DOI: 10.1016/J.Ymssp.2019.05.043 |
0.303 |
|
2019 |
Hammad AW, Akbarnezhad A, Wu P, Wang X, Haddad A. Building information modelling-based framework to contrast conventional and modular construction methods through selected sustainability factors Journal of Cleaner Production. 228: 1264-1281. DOI: 10.1016/J.Jclepro.2019.04.150 |
0.35 |
|
2019 |
Hu X, Chong H, Wang X. Sustainability perceptions of off-site manufacturing stakeholders in Australia Journal of Cleaner Production. 227: 346-354. DOI: 10.1016/J.Jclepro.2019.03.258 |
0.324 |
|
2019 |
Guo H, Wang X, Li L. State-of-charge-constraint-based energy management strategy of plug-in hybrid electric vehicle with bus route Energy Conversion and Management. 199: 111972. DOI: 10.1016/J.Enconman.2019.111972 |
0.313 |
|
2019 |
Zhu J, Wang X, Chen M, Wu P, Kim MJ. Integration of BIM and GIS: IFC geometry transformation to shapefile using enhanced open-source approach Automation in Construction. 106: 102859. DOI: 10.1016/J.Autcon.2019.102859 |
0.336 |
|
2019 |
Zhu J, Wang X, Wang P, Wu Z, Kim MJ. Integration of BIM and GIS: Geometry from IFC to shapefile using open-source technology Automation in Construction. 102: 105-119. DOI: 10.1016/J.Autcon.2019.02.014 |
0.326 |
|
2018 |
Wang J, Chi H, Shou W, Chong H, Wang X. A Coordinated Approach for Supply-Chain Tracking in the Liquefied Natural Gas Industry Sustainability. 10: 4822. DOI: 10.3390/Su10124822 |
0.326 |
|
2018 |
Wu P, Song Y, Hu X, Wang X. A Preliminary Investigation of the Transition from Green Building to Green Community: Insights from LEED ND Sustainability. 10: 1802. DOI: 10.3390/Su10061802 |
0.329 |
|
2018 |
Liang R, Wu C, Sheng Z, Wang X. Multi-Criterion Two-Sided Matching of Public–Private Partnership Infrastructure Projects: Criteria and Methods Sustainability. 10: 1178. DOI: 10.3390/Su10041178 |
0.308 |
|
2018 |
Mirarchi C, Pavan A, Marco FD, Wang X, Song Y. Supporting Facility Management Processes through End-Users’ Integration and Coordinated BIM-GIS Technologies Isprs International Journal of Geo-Information. 7: 191. DOI: 10.3390/Ijgi7050191 |
0.357 |
|
2018 |
Zhu J, Wright G, Wang J, Wang X. A Critical Review of the Integration of Geographic Information System and Building Information Modelling at the Data Level Isprs International Journal of Geo-Information. 7: 66. DOI: 10.3390/Ijgi7020066 |
0.31 |
|
2018 |
Liang R, Sheng Z, Wang X. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects Complexity. 2018: 1-14. DOI: 10.1155/2018/8705134 |
0.325 |
|
2018 |
Liu B, Li L, Wang X, Cheng S. Hybrid Electric Vehicle Downshifting Strategy Based on Stochastic Dynamic Programming During Regenerative Braking Process Ieee Transactions On Vehicular Technology. 67: 4716-4727. DOI: 10.1109/Tvt.2018.2815518 |
0.316 |
|
2018 |
Lee CY, Chong H, Wang X. Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model Journal of Construction Engineering and Management. 144: 06018002. DOI: 10.1061/(Asce)Co.1943-7862.0001521 |
0.339 |
|
2018 |
Moon S, Xu S, Hou L, Wu C, Wang X, Tam VWY. RFID-aided tracking system to improve work efficiency of scaffold supplier: stock management in Australasian supply chain Journal of Construction Engineering and Management-Asce. 144: 4017115. DOI: 10.1061/(Asce)Co.1943-7862.0001432 |
0.351 |
|
2018 |
Huang B, Wang X, Kua H, Geng Y, Bleischwitz R, Ren J. Construction and demolition waste management in China through the 3R principle Resources, Conservation and Recycling. 129: 36-44. DOI: 10.1016/J.Resconrec.2017.09.029 |
0.329 |
|
2018 |
Wang Y, Wang X, Sun Y, You S. Model predictive control strategy for energy optimization of series-parallel hybrid electric vehicle Journal of Cleaner Production. 199: 348-358. DOI: 10.1016/J.Jclepro.2018.07.191 |
0.314 |
|
2018 |
Tan Y, Song Y, Zhu J, Long Q, Wang X, Cheng JCP. Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS Automation in Construction. 94: 328-339. DOI: 10.1016/J.Autcon.2018.07.012 |
0.327 |
|
2018 |
Porter S, Tan T, Wang X, Pareek V. LODOS - Going from BIM to CFD via CAD and model abstraction Automation in Construction. 94: 85-92. DOI: 10.1016/J.Autcon.2018.06.001 |
0.339 |
|
2018 |
Lu H, Wang H, Xie Y, Wang X. Study on construction material allocation policies: A simulation optimization method Automation in Construction. 90: 201-212. DOI: 10.1016/J.Autcon.2018.02.012 |
0.336 |
|
2018 |
Cheng JCP, Tan Y, Song Y, Mei Z, Gan VJL, Wang X. Developing an evacuation evaluation model for offshore oil and gas platforms using BIM and agent-based model Automation in Construction. 89: 214-224. DOI: 10.1016/J.Autcon.2018.02.011 |
0.324 |
|
2018 |
Li X, Yi W, Chi H, Wang X, Chan APC. A critical review of virtual and augmented reality (VR/AR) applications in construction safety Automation in Construction. 86: 150-162. DOI: 10.1016/J.Autcon.2017.11.003 |
0.305 |
|
2018 |
Lee C, Chong H, Wang X. Streamlining Digital Modeling and Building Information Modelling (BIM) Uses for the Oil and Gas Projects Archives of Computational Methods in Engineering. 25: 349-396. DOI: 10.1007/S11831-016-9201-4 |
0.321 |
|
2017 |
LOPEZ R, CHONG H, MOON S, WANG X. CASE STUDY ON SUBCONTRACTING ARRANGEMENTS IN THE SCAFFOLDING SUPPLY CHAIN OF A LIQUEFIED NATURAL GAS INFRASTRUCTURE PROJECT Journal of Civil Engineering and Management. 23: 1136-1147. DOI: 10.3846/13923730.2017.1388277 |
0.336 |
|
2017 |
Wang T, Zhang Q, Chong H, Wang X. Integrated Supplier Selection Framework in a Resilient Construction Supply Chain: An Approach via Analytic Hierarchy Process (AHP) and Grey Relational Analysis (GRA) Sustainability. 9: 289. DOI: 10.3390/Su9020289 |
0.329 |
|
2017 |
Wu P, Song Y, Wang J, Wang X, Zhao X, He Q. Regional Variations of Credits Obtained by LEED 2009 Certified Green Buildings—A Country Level Analysis Sustainability. 10: 20. DOI: 10.3390/Su10010020 |
0.309 |
|
2017 |
Song Y, Wang X, Tan Y, Wu P, Sutrisna M, Cheng JCP, Hampson K. Trends and Opportunities of BIM-GIS Integration in the Architecture, Engineering and Construction Industry: A Review from a Spatio-Temporal Statistical Perspective Isprs International Journal of Geo-Information. 6: 397. DOI: 10.3390/Ijgi6120397 |
0.35 |
|
2017 |
Liu X, Wang X, Wright G, Cheng JCP, Li X, Liu R. A State-of-the-Art Review on the Integration of Building Information Modeling (BIM) and Geographic Information System (GIS) Isprs International Journal of Geo-Information. 6: 53. DOI: 10.3390/Ijgi6020053 |
0.343 |
|
2017 |
Moon S, Han S, Zekavat PR, Bernold LE, Wang X. Process-waste reduction in the construction supply chain using proactive information network Concurrent Engineering. 25: 123-135. DOI: 10.1177/1063293X16667451 |
0.302 |
|
2017 |
Teng Y, Li X, Wu P, Wang X. Using cooperative game theory to determine profit distribution in IPD projects International Journal of Construction Management. 19: 32-45. DOI: 10.1080/15623599.2017.1358075 |
0.313 |
|
2017 |
Hou L, Zhao C, Wu C, Moon S, Wang X. Discrete Firefly Algorithm for Scaffolding Construction Scheduling Journal of Computing in Civil Engineering. 31: 1-15. DOI: 10.1061/(Asce)Cp.1943-5487.0000639 |
0.339 |
|
2017 |
Li L, Wang X, Song J. Fuel consumption optimization for smart hybrid electric vehicle during a car-following process Mechanical Systems and Signal Processing. 87: 17-29. DOI: 10.1016/J.Ymssp.2016.03.002 |
0.321 |
|
2017 |
Teng Y, Mao C, Liu G, Wang X. Analysis of stakeholder relationships in the industry chain of industrialized building in China Journal of Cleaner Production. 152: 387-398. DOI: 10.1016/J.Jclepro.2017.03.094 |
0.338 |
|
2017 |
Chong H, Lee C, Wang X. A mixed review of the adoption of Building Information Modelling (BIM) for sustainability Journal of Cleaner Production. 142: 4114-4126. DOI: 10.1016/J.Jclepro.2016.09.222 |
0.345 |
|
2017 |
Mancini M, Wang X, Skitmore M, Issa R. Editorial for IJPM special issue on advances in building information modeling (BIM) for construction projects International Journal of Project Management. 35: 656-657. DOI: 10.1016/J.Ijproman.2016.12.008 |
0.355 |
|
2017 |
Li X, Wu P, Shen GQ, Wang X, Teng Y. Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach Automation in Construction. 84: 195-206. DOI: 10.1016/J.Autcon.2017.09.011 |
0.344 |
|
2017 |
Hou L, Chi H, Tarng W, Chai J, Panuwatwanich K, Wang X. A framework of innovative learning for skill development in complex operational tasks Automation in Construction. 83: 29-40. DOI: 10.1016/J.Autcon.2017.07.001 |
0.307 |
|
2017 |
Tan Y, Song Y, Liu X, Wang X, Cheng JCP. A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platforms Automation in Construction. 79: 19-30. DOI: 10.1016/J.Autcon.2017.02.008 |
0.353 |
|
2017 |
Zhao C, Wu C, Chai J, Wang X, Yang X, Lee J, Kim MJ. Decomposition-based multi-objective firefly algorithm for RFID network planning with uncertainty Applied Soft Computing. 55: 549-564. DOI: 10.1016/J.Asoc.2017.02.009 |
0.325 |
|
2017 |
Tao S, Wu C, Sheng Z, Wang X. Stochastic Project Scheduling with Hierarchical Alternatives Applied Mathematical Modelling. 58: 181-202. DOI: 10.1016/J.Apm.2017.09.015 |
0.31 |
|
2017 |
Chai J, Wu C, Zhao C, Chi H, Wang X, Ling BW, Teo KL. Reference tag supported RFID tracking using robust support vector regression and Kalman filter Advanced Engineering Informatics. 32: 1-10. DOI: 10.1016/J.Aei.2016.11.002 |
0.303 |
|
2017 |
Yang Y, Zhu Z, Wang X, Chen Z, Ma Z. Optimal launching-intention-aware control strategy for automated clutch engagement International Journal of Automotive Technology. 18: 417-428. DOI: 10.1007/S12239-017-0042-4 |
0.322 |
|
2016 |
Chai J, Chi H, Wang X, Wu C, Jung KH, Lee JM. Automatic as-built modeling for concurrent progress tracking of plant construction based on laser scanning Concurrent Engineering. 24: 369-380. DOI: 10.1177/1063293X16670449 |
0.323 |
|
2016 |
Li L, Zhu Z, Chen Y, He K, Li X, Wang X. Engagement Control of Automated Clutch for Vehicle Launching Considering the Instantaneous Changes of Driver's Intention Journal of Dynamic Systems, Measurement, and Control. 139. DOI: 10.1115/1.4034841 |
0.308 |
|
2016 |
Wang J, Shou W, Wang X, Wu P. Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction Construction Management and Economics. 1-16. DOI: 10.1080/01446193.2016.1227460 |
0.374 |
|
2016 |
Li L, Li X, Wang X, Liu Y, Song J, Ran X. Transient switching control strategy from regenerative braking to anti-lock braking with a semi-brake-by-wire system Vehicle System Dynamics. 54: 231-257. DOI: 10.1080/00423114.2015.1129059 |
0.301 |
|
2016 |
Chong HY, Lopez R, Wang J, Wang X, Zhao Z. Comparative Analysis on the Adoption and Use of BIM in Road Infrastructure Projects Journal of Management in Engineering. 32. DOI: 10.1061/(Asce)Me.1943-5479.0000460 |
0.32 |
|
2016 |
Moon S, Forlani J, Wang X, Tam V. Productivity Study of the Scaffolding Operations in Liquefied Natural Gas Plant Construction: Ichthys Project in Darwin, Northern Territory, Australia Journal of Professional Issues in Engineering Education and Practice. 142. DOI: 10.1061/(Asce)Ei.1943-5541.0000287 |
0.308 |
|
2016 |
Lopez R, Chong HY, Wang X, Graham J. Technical Review: Analysis and Appraisal of Four-Dimensional Building Information Modeling Usability in Construction and Engineering Projects Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0001094 |
0.329 |
|
2016 |
Ren D, Qu F, Lv K, Zhang Z, Xu H, Wang X. A gradient descent boosting spectrum modeling method based on back interval partial least squares Neurocomputing. 171: 1038-1046. DOI: 10.1016/J.Neucom.2015.07.109 |
0.308 |
|
2016 |
Mao C, Xie F, Hou L, Wu P, Wang J, Wang X. Cost analysis for sustainable off-site construction based on a multiple-case study in China Habitat International. 57: 215-222. DOI: 10.1016/J.Habitatint.2016.08.002 |
0.336 |
|
2016 |
Li F, Wu C, Wang X, Tian Q, Teo KL. Sparsity-enhanced optimization for ejector performance prediction Energy. 113: 25-34. DOI: 10.1016/J.Energy.2016.07.041 |
0.305 |
|
2016 |
Wu P, Wang J, Wang X. A critical review of the use of 3-D printing in the construction industry Automation in Construction. 68: 21-31. DOI: 10.1016/J.Autcon.2016.04.005 |
0.327 |
|
2016 |
Wang J, Wang X, Shou W, Chong HY, Guo J. Building information modeling-based integration of MEP layout designs and constructability Automation in Construction. 61: 134-146. DOI: 10.1016/J.Autcon.2015.10.003 |
0.342 |
|
2016 |
Li L, Li X, Wang X, Song J, He K, Li C. Analysis of downshift's improvement to energy efficiency of an electric vehicle during regenerative braking Applied Energy. 176: 125-137. DOI: 10.1016/J.Apenergy.2016.05.042 |
0.322 |
|
2016 |
Wang X, Ong SK, Nee AYC. A comprehensive survey of augmented reality assembly research Advances in Manufacturing. 4: 1-22. DOI: 10.1007/S40436-015-0131-4 |
0.313 |
|
2016 |
Li J, Wu Z, Wu C, Long Q, Wang X. An Inexact Dual Fast Gradient-Projection Method for Separable Convex Optimization with Linear Coupled Constraints Journal of Optimization Theory and Applications. 168: 153-171. DOI: 10.1007/S10957-015-0757-1 |
0.301 |
|
2016 |
Chong HY, Wang X. The outlook of building information modeling for sustainable development Clean Technologies and Environmental Policy. 1-11. DOI: 10.1007/S10098-016-1170-7 |
0.351 |
|
2015 |
Kim MJ, Wang X, Han S, Wang Y. Implementing an augmented reality-enabled wayfinding system through studying user experience and requirements in complex environments Visualization in Engineering. 3. DOI: 10.1186/S40327-015-0026-2 |
0.304 |
|
2015 |
Tavakoli Taba S, Rahnamayie Zekavat P, Alipour Esgandani G, Wang X, Bernold L. A multidimensional analytical approach for identifying and locating large utility pipes in underground infrastructure International Journal of Distributed Sensor Networks. 2015. DOI: 10.1155/2015/601859 |
0.311 |
|
2015 |
Wang X, Chong HY. Setting new trends of integrated Building Information Modelling (BIM) for construction industry Construction Innovation. 15: 2-6. DOI: 10.1108/Ci-10-2014-0049 |
0.353 |
|
2015 |
Wang X, Ong SK, Nee AYC. Real-virtual interaction in AR assembly simulation based on component contact handling strategy Assembly Automation. 35: 376-394. DOI: 10.1108/Aa-02-2015-012 |
0.336 |
|
2015 |
Hou L, Wang X, Truijens M. Using Augmented Reality to Facilitate Piping Assembly: An Experiment-Based Evaluation Journal of Computing in Civil Engineering. 29: 5014007. DOI: 10.1061/(Asce)Cp.1943-5487.0000344 |
0.324 |
|
2015 |
Wang J, Zhang X, Shou W, Wang X, Xu B, Kim MJ, Wu P. A BIM-based approach for automated tower crane layout planning Automation in Construction. 59: 168-178. DOI: 10.1016/J.Autcon.2015.05.006 |
0.366 |
|
2015 |
Zhou Y, Ding L, Wang X, Truijens M, Luo H. Applicability of 4D modeling for resource allocation in mega liquefied natural gas plant construction Automation in Construction. 50: 50-63. DOI: 10.1016/J.Autcon.2014.10.016 |
0.342 |
|
2015 |
Chi HL, Wang X, Jiao Y. BIM-Enabled Structural Design: Impacts and Future Developments in Structural Modelling, Analysis and Optimisation Processes Archives of Computational Methods in Engineering. 22: 135-151. DOI: 10.1007/S11831-014-9127-7 |
0.311 |
|
2015 |
Shou W, Wang J, Wang X, Chong HY. A Comparative Review of Building Information Modelling Implementation in Building and Infrastructure Industries Archives of Computational Methods in Engineering. 22: 291-308. DOI: 10.1007/S11831-014-9125-9 |
0.356 |
|
2015 |
Chi HL, Wang J, Wang X, Truijens M, Yung P. A Conceptual Framework of Quality-Assured Fabrication, Delivery and Installation Processes for Liquefied Natural Gas (LNG) Plant Construction Journal of Intelligent and Robotic Systems: Theory and Applications. 79: 433-448. DOI: 10.1007/S10846-014-0123-9 |
0.361 |
|
2014 |
Kang S, Ding L, Wang X. Editorial on Robotics in Building and Infrastructure International Journal of Advanced Robotic Systems. 11: 134. DOI: 10.5772/58747 |
0.325 |
|
2014 |
Li J, Hou L, Wang X, Wang J, Guo J, Zhang S, Jiao Y. A project-based quantification of BIM benefits International Journal of Advanced Robotic Systems. 11. DOI: 10.5772/58448 |
0.366 |
|
2014 |
Li J, Wang Y, Wang X, Luo H, Kang SC, Wang J, Guo J, Jiao Y. Benefits of building information modelling in the project lifecycle: Construction projects in asia International Journal of Advanced Robotic Systems. 11. DOI: 10.5772/58447 |
0.368 |
|
2014 |
Yung P, Wang X. A 6D CAD model for the automatic assessment of building sustainability International Journal of Advanced Robotic Systems. 11. DOI: 10.5772/58446 |
0.319 |
|
2014 |
Sohn HW, Hong WK, Lee D, Lim C, Wang X, Kim S. Optimum Tower Crane Selection and Supporting Design Management International Journal of Advanced Robotic Systems. 11: 133. DOI: 10.5772/58438 |
0.326 |
|
2014 |
Wang J, Wang X, Shou W, Xu B. Integrating BIM and augmented reality for interactive architectural visualisation Construction Innovation. 14: 453-476. DOI: 10.1108/Ci-03-2014-0019 |
0.329 |
|
2014 |
Wang J, Wang X, Shou W, Guo J, Hou L. Development of BIM model fitness review system for modelling quality control Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference On Computing in Civil and Building Engineering. 577-584. DOI: 10.1061/9780784413616.072 |
0.326 |
|
2014 |
Shou W, Wang X, Wang J, Hou L, Truijens M. Integration of BIM and lean concepts to improve maintenance efficiency: A case study Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference On Computing in Civil and Building Engineering. 373-380. DOI: 10.1061/9780784413616.047 |
0.338 |
|
2014 |
Lee JH, Lee H, Kim MJ, Wang X, Love PE. Context-aware inference in ubiquitous residential environments Computers in Industry. 65: 148-157. DOI: 10.1016/J.Compind.2013.08.005 |
0.302 |
|
2014 |
Wang X, Yung P, Luo H, Truijens M. An innovative method for project control in LNG project through 5D CAD: A case study Automation in Construction. 45: 126-135. DOI: 10.1016/J.Autcon.2014.05.011 |
0.317 |
|
2014 |
Wang X, Truijens M, Hou L, Wang Y, Zhou Y. Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry Automation in Construction. 40: 96-105. DOI: 10.1016/J.Autcon.2013.12.003 |
0.356 |
|
2014 |
Wang J, Sun W, Shou W, Wang X, Wu C, Chong HY, Liu Y, Sun C. Integrating BIM and LiDAR for Real-Time Construction Quality Control Journal of Intelligent and Robotic Systems: Theory and Applications. 79: 417-432. DOI: 10.1007/S10846-014-0116-8 |
0.33 |
|
2013 |
Wang X, Dunston PS. Tangible mixed reality for remote design review: a study understanding user perception and acceptance Visualization in Engineering. 1. DOI: 10.1186/2213-7459-1-8 |
0.301 |
|
2013 |
Wang Y, Wang X, Wang J, Yung P, Jun G. Engagement of facilities management in design stage through BIM: Framework and a case study Advances in Civil Engineering. 2013. DOI: 10.1155/2013/189105 |
0.322 |
|
2013 |
Zhou J, Love PED, Wang X, Teo KL, Irani Z. A review of methods and algorithms for optimizing construction scheduling Journal of the Operational Research Society. 64: 1091-1105. DOI: 10.1057/Jors.2012.174 |
0.302 |
|
2013 |
Wang X, Love PED, Kim MJ, Park C, Sing C, Hou L. A conceptual framework for integrating building information modeling with augmented reality Automation in Construction. 34: 37-44. DOI: 10.1016/J.Autcon.2012.10.012 |
0.355 |
|
2012 |
Pyun YJ, Park Y, Reeves DS, Wang X, Ning P. Interval-based flow watermarking for tracing interactive traffic Computer Networks. 56: 1646-1665. DOI: 10.1016/J.Comnet.2012.01.017 |
0.617 |
|
2011 |
Wang X, Reeves DS. Robust correlation of encrypted attack traffic through stepping stones by flow watermarking Ieee Transactions On Dependable and Secure Computing. 8: 434-449. DOI: 10.1109/Tdsc.2010.35 |
0.504 |
|
2011 |
Rezazadeh IM, Wang X, Firoozabadi M, Golpayegani MRH. Using affective human-machine interface to increase the operation performance in virtual construction crane training system: A novel approach Automation in Construction. 20: 289-298. DOI: 10.1016/J.Autcon.2010.10.005 |
0.302 |
|
2011 |
Singh V, Gu N, Wang X. A theoretical framework of a BIM-based multi-disciplinary collaboration platform Automation in Construction. 20: 134-144. DOI: 10.1016/J.Autcon.2010.09.011 |
0.383 |
|
2009 |
Dong A, Maher ML, Kim MJ, Gu N, Wang X. Construction defect management using a telematic digital workbench Automation in Construction. 18: 814-824. DOI: 10.1016/J.Autcon.2009.03.005 |
0.325 |
|
2008 |
Wang X, Chen R. An empirical study on augmented virtuality space for tele-inspection inspection of built environments Tsinghua Science & Technology. 13: 286-291. DOI: 10.1016/S1007-0214(08)70163-9 |
0.332 |
|
2008 |
Wang X, Dunston PS. User perspectives on mixed reality tabletop visualization for face-to-face collaborative design review Automation in Construction. 17: 399-412. DOI: 10.1016/J.Autcon.2007.07.002 |
0.303 |
|
2007 |
Wang X. Using Augmented Reality to Plan Virtual Construction Worksite International Journal of Advanced Robotic Systems. 4: 42. DOI: 10.5772/5677 |
0.325 |
|
2005 |
Dunston PS, Wang X. Mixed Reality-based visualization interfaces for architecture, engineering, and construction industry Journal of Construction Engineering and Management. 131: 1301-1309. DOI: 10.1061/(Asce)0733-9364(2005)131:12(1301) |
0.339 |
|
Show low-probability matches. |