Year |
Citation |
Score |
2019 |
Andary EG, Abi Shdid C, Chowdhury A, Ahmad I. Integrated project delivery implementation framework for water and wastewater treatment plant projects Engineering, Construction and Architectural Management. 27: 609-633. DOI: 10.1108/Ecam-02-2019-0075 |
0.377 |
|
2019 |
Ahmad I, Azhar N, Chowdhury A. Enhancement of IPD Characteristics as Impelled by Information and Communication Technology Journal of Management in Engineering. 35: 04018055. DOI: 10.1061/(Asce)Me.1943-5479.0000670 |
0.61 |
|
2015 |
Azhar N, Kang Y, Ahmad I. Critical look into the relationship between information and communication technology and integrated project delivery in public sector construction Journal of Management in Engineering. 31. DOI: 10.1061/(Asce)Me.1943-5479.0000334 |
0.657 |
|
2014 |
Azhar S, Ahmad I. Introduction to the special issue on information and communication technology (ICT) in AEC organizations: Assessment of impact on work practices, project delivery, and organizational behavior Journal of Management in Engineering. 31. DOI: 10.1061/(Asce)Me.1943-5479.0000345 |
0.631 |
|
2011 |
Azhar S, Carlton WA, Olsen D, Ahmad I. Building information modeling for sustainable design and LEED® rating analysis Automation in Construction. 20: 217-224. DOI: 10.1016/J.Autcon.2010.09.019 |
0.563 |
|
2010 |
Zhu Y, Zhang R, Ahmad I. Applying Concept Similarity to the Evaluation of Common Understanding in Multidisciplinary Learning Journal of Computing in Civil Engineering. 24: 335-344. DOI: 10.1061/(Asce)Cp.1943-5487.0000035 |
0.309 |
|
2010 |
Azhar S, Ahmad I, Sein MK. Action Research as a Proactive Research Method for Construction Engineering and Management Journal of Construction Engineering and Management-Asce. 136: 87-98. DOI: 10.1061/(Asce)Co.1943-7862.0000081 |
0.568 |
|
2010 |
Perkinson CL, Bayraktar ME, Ahmad I. The use of computing technology in highway construction as a total jobsite management tool Automation in Construction. 19: 884-897. DOI: 10.1016/J.Autcon.2010.06.002 |
0.519 |
|
2009 |
Zhu Y, Ahmad I, Wang L. Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects Journal of Construction Engineering and Management-Asce. 135: 601-608. DOI: 10.1061/(Asce)Co.1943-7862.0000020 |
0.313 |
|
2007 |
Zhu Y, Mao W, Ahmad I. Capturing Implicit Structures in Unstructured Content of Construction Documents Journal of Computing in Civil Engineering. 21: 220-227. DOI: 10.1061/(Asce)0887-3801(2007)21:3(220) |
0.424 |
|
2007 |
Mao W, Zhu Y, Ahmad I. Applying metadata models to unstructured content of construction documents: A view-based approach Automation in Construction. 16: 242-252. DOI: 10.1016/J.Autcon.2006.05.005 |
0.441 |
|
2004 |
Ahmad I, Azhar S. Temperature variation in high slump drilled shaft concrete and its effect on slump loss Cement and Concrete Research. 34: 207-217. DOI: 10.1016/S0008-8846(03)00257-6 |
0.474 |
|
2004 |
Ahmad I, Azhar S, Lukauskis P. Development of a decision support system using data warehousing to assist builders/developers in site selection Automation in Construction. 13: 525-542. DOI: 10.1016/J.Autcon.2004.03.001 |
0.556 |
|
2003 |
Ahmad I, Azhar S, Ahmed SM. Construction of a bridge in a developing country: A Bangladesh case study Leadership and Management in Engineering. 3: 177-182. DOI: 10.1061/(Asce)1532-6748(2003)3:4(177) |
0.537 |
|
1999 |
Ahmad I. Managing, Processing and Communicating Information: What A/E/C Organizations Should Know Journal of Management in Engineering. 15: 33-36. DOI: 10.1061/(Asce)0742-597X(1999)15:4(33) |
0.411 |
|
1989 |
Minkarah I, Ahmad I. Expert Systems As Construction Management Tools Journal of Management in Engineering. 5: 155-163. DOI: 10.1061/(Asce)9742-597X(1989)5:2(155) |
0.393 |
|
Show low-probability matches. |