Year |
Citation |
Score |
2011 |
Lee TS, Moon DS, Koo JK, Bernold LE, Lee DW. Viability analysis of innovative surface stripe removal system Ksce Journal of Civil Engineering. 15: 15-21. DOI: 10.1007/S12205-011-0967-5 |
0.319 |
|
2010 |
Bernold LE, Lee TS. Experimental research in construction Journal of Construction Engineering and Management. 136: 26-35. DOI: 10.1061/(Asce)Co.1943-7862.0000085 |
0.336 |
|
2010 |
Bernold LE, Lee TS, Koo JK, Moon DS. Automated eco-friendly road stripe removal system Automation in Construction. 19: 694-701. DOI: 10.1016/J.Autcon.2010.02.013 |
0.346 |
|
2010 |
Bernold LE, AbouRizk SM. Managing Performance in Construction Managing Performance in Construction. DOI: 10.1002/9780470638996 |
0.556 |
|
2008 |
Lee J, Bernold LE. Ubiquitous agent-based communication in construction Journal of Computing in Civil Engineering. 22: 31-39. DOI: 10.1061/(Asce)0887-3801(2008)22:1(31) |
0.736 |
|
2008 |
Kim KT, Bernold LE. A comparison of two innovative technologies for safe pipe installation - "Pipeman" and the Stewart-Gough platform-based pipe manipulator Automation in Construction. 17: 322-332. DOI: 10.1016/J.Autcon.2007.04.004 |
0.462 |
|
2008 |
Benaroya H, Bernold L. Engineering of lunar bases Acta Astronautica. 62: 277-299. DOI: 10.1016/J.Actaastro.2007.05.001 |
0.347 |
|
2007 |
Bernold LE. Preparedness of engineering freshman to inquiry-based learning Journal of Professional Issues in Engineering Education and Practice. 133: 99-106. DOI: 10.1061/(Asce)1052-3928(2007)133:2(99) |
0.369 |
|
2007 |
Bernold LE. Teaching evaluations for construction engineering and management: Opportunity to move us forward Journal of Construction Engineering and Management. 133: 146-156. DOI: 10.1061/(Asce)0733-9364(2007)133:2(146) |
0.36 |
|
2007 |
Bernold LE. Quantitative assessment of backhoe operator skill Journal of Construction Engineering and Management. 133: 889-899. DOI: 10.1061/(Asce)0733-9364(2007)133:11(889) |
0.346 |
|
2007 |
Williams T, Bernold L, Lu H. Adoption patterns of advanced information technologies in the construction industries of the United States and Korea Journal of Construction Engineering and Management. 133: 780-790. DOI: 10.1061/(Asce)0733-9364(2007)133:10(780) |
0.393 |
|
2007 |
Lester J, Bernold LE. Innovative process to characterize buried utilities using Ground Penetrating Radar Automation in Construction. 16: 546-555. DOI: 10.1016/J.Autcon.2006.09.004 |
0.363 |
|
2007 |
Bernold LE. Control schemes for tele-robotic pipe installation Automation in Construction. 16: 518-524. DOI: 10.1016/J.Autcon.2006.09.002 |
0.403 |
|
2007 |
Bernold LE, Spurlin JE, Anson CM. Understanding our students: A longitudinal-study of success and failure in engineering with implications for increased retention Journal of Engineering Education. 96: 263-274. DOI: 10.1002/J.2168-9830.2007.Tb00935.X |
0.314 |
|
2006 |
Bernold LE. Ubiquitous communication to link islands of information in construction Earth and Space 2006 - Proceedings of the 10th Biennial International Conference On Engineering, Construction, and Operations in Challenging Environments. 2006: 115. DOI: 10.1061/40830(188)115 |
0.363 |
|
2006 |
Kolera BT, Bernold LE. Intelligent utility locating tool for excavators Journal of Construction Engineering and Management. 132: 919-927. DOI: 10.1061/(Asce)0733-9364(2006)132:9(919) |
0.408 |
|
2006 |
Nuntasunti S, Bernold LE. Experimental assessment of wireless construction technologies Journal of Construction Engineering and Management. 132: 1009-1018. DOI: 10.1061/(Asce)0733-9364(2006)132:9(1009) |
0.709 |
|
2005 |
Harper DG, Bernold LE. Success of supplier alliances for capital projects Journal of Construction Engineering and Management. 131: 979-985. DOI: 10.1061/(Asce)0733-9364(2005)131:9(979) |
0.331 |
|
2005 |
Bernold LE. Automatic as-built generation with utility trenchers Journal of Construction Engineering and Management. 131: 740-747. DOI: 10.1061/(Asce)0733-9364(2005)131:6(740) |
0.408 |
|
2005 |
Bernold LE. Paradigm shift in construction education is vital for the future of our profession Journal of Construction Engineering and Management. 131: 533-539. DOI: 10.1061/(Asce)0733-9364(2005)131:5(533) |
0.352 |
|
2003 |
Benaroya H, Bernold L, Chua KM. Engineering, Design and Construction of Lunar Bases Perspectives in Civil Engineering: Commemorating the 150th Anniversary of the American Society of Civil Engineers. 229-241. DOI: 10.1061/(Asce)0893-1321(2002)15:2(33) |
0.425 |
|
2003 |
Bernold LE. Economic model to optimize underground utility protection Journal of Construction Engineering and Management. 129: 645-652. DOI: 10.1061/(Asce)0733-9364(2003)129:6(645) |
0.308 |
|
2003 |
Lee J, Lorenc SJ, Bernold LE. Comparative performance evaluation of tele-operated pipe laying Journal of Construction Engineering and Management. 129: 32-40. DOI: 10.1061/(Asce)0733-9364(2003)129:1(32) |
0.387 |
|
2003 |
Nuntasunti S, Bernold LE. Wireless Site-Network for Construction: A Win-Win Strategy for GCs Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress. 167-174. |
0.704 |
|
2003 |
Bernold LE, Li B. Technology for the Tele-Robotic Laying of Large and Small Pipes Proceedings of the Asce International Conference On Pipeline Engineering and Construction: New Pipeline Technologies, Security, and Safety. 1: 400-407. |
0.311 |
|
2002 |
Bernold LE. Spatial integration in construction Journal of Construction Engineering and Management. 128: 400-408. DOI: 10.1061/(Asce)0733-9364(2002)128:5(400) |
0.39 |
|
2001 |
Bai Y, Bernold LE. Quality control parameters for robotic bridge painting Journal of Construction Engineering and Management. 127: 142-148. DOI: 10.1061/(Asce)0733-9364(2001)127:2(142) |
0.327 |
|
2000 |
Lorenc SJ, Yeager M, Bernold LE. Field test results of the remotely controlled Drilled Shaft Inspection System (DSIS) Proceedings of the 4th International Conference and Exposition On Robotics For Challenging Situations and Environments - Robotics 2000. 299: 120-125. DOI: 10.1061/40476(299)15 |
0.423 |
|
2000 |
Dunston PS, Bernold LE. Adaptive control for safe and quality rebar fabrication Journal of Construction Engineering and Management. 126: 122-129. DOI: 10.1061/(Asce)0733-9364(2000)126:2(122) |
0.399 |
|
2000 |
Lorenc SJ, Handlon BE, Bernold LE. Development of a robotic bridge maintenance system Automation in Construction. 9: 251-258. DOI: 10.1016/S0926-5805(99)00040-0 |
0.347 |
|
2000 |
Bernold LE, Bingham WL, Mcdonald PH, Attia TM. Impact of holistic and learning-oriented teaching on academic success Journal of Engineering Education. 89: 191-199+247-248+251. DOI: 10.1002/J.2168-9830.2000.Tb00513.X |
0.686 |
|
1999 |
Beichner R, Bernold L, Burniston E, Dail P, Felder R, Gastineau J, Gjertsen M, Risley J. Case study of the physics component of an integrated curriculum American Journal of Physics. 67: S16-24. DOI: 10.1119/1.19075 |
0.351 |
|
1999 |
Lee J, Lorenc SJ, Bernold LE. Saving lives and money with robotic trenching and pipe installation Journal of Aerospace Engineering. 12: 43-49. DOI: 10.1061/(Asce)0893-1321(1999)12:2(43) |
0.442 |
|
1998 |
Lee J, Lorenc SJ, Bernold LE. Teleoperated pipe manipulation Robotics 1998. 188-194. DOI: 10.1061/40337(205)28 |
0.315 |
|
1998 |
Carver C, Bernold LE, Lorenc SJ. Averting excavation disaster Journal of Management in Engineering. 14: 29-30. DOI: 10.1061/(Asce)0742-597X(1998)14:1(29) |
0.375 |
|
1998 |
Moon S, Bernold LE. Graphic-based human-machine interface for construction manipulator control Journal of Construction Engineering and Management. 124: 305-314. DOI: 10.1061/(Asce)0733-9364(1998)124:4(305) |
0.384 |
|
1998 |
Lorenc SJ, Bernold LE. Excavator-mounted ordnance locating system using electromagnetic sensing technology Automation in Construction. 7: 243-258. DOI: 10.1016/S0926-5805(97)00069-1 |
0.355 |
|
1997 |
Rihani RA, Bernold LE. Telerobotics for infrastructure maintenance: Safe raised pavement-marker application Transportation Research Record. 48-52. DOI: 10.3141/1585-07 |
0.739 |
|
1997 |
Bernold LE, Lorenc SJ, Luces E. On-line assistance for crane operators Journal of Computing in Civil Engineering. 11: 248-259. DOI: 10.1061/(Asce)0887-3801(1997)11:4(248) |
0.368 |
|
1997 |
Moon S, Bernold LE. Vision-based interactive path planning for robotic bridge paint removal Journal of Computing in Civil Engineering. 11: 113-120. DOI: 10.1061/(Asce)0887-3801(1997)11:2(113) |
0.407 |
|
1997 |
Huang X, Bernold LE. CAD-integrated excavation and pipe laying Journal of Construction Engineering and Management. 123: 318-323. DOI: 10.1061/(Asce)0733-9364(1997)123:3(318) |
0.405 |
|
1997 |
Bernold LE, Lorenc SJ, Luces E. Intelligent technology for truck crane accident prevention Journal of Construction Engineering and Management. 123: 276-284. DOI: 10.1061/(Asce)0733-9364(1997)123:3(276) |
0.348 |
|
1996 |
Huang X, Bernd D, Bernold LE. Innovative technology development for safe excavation Journal of Construction Engineering and Management. 122: 91-96. DOI: 10.1061/(Asce)0733-9364(1996)122:1(91) |
0.387 |
|
1996 |
Rihani RA, Bernold LE. Methods of control for robotic brick masonry Automation in Construction. 4: 281-292. DOI: 10.1016/0926-5805(95)00009-7 |
0.744 |
|
1995 |
Boles WW, Bernold LE, Scott WD. Lunar shelter student contest: Exciting education for civil engineers Journal of Professional Issues in Engineering Education and Practice. 121: 225-230. DOI: 10.1061/(Asce)1052-3928(1995)121:4(225) |
0.333 |
|
1995 |
Salim M, Bernold LE. Design-integrated process planner for rebar placement Journal of Computing in Civil Engineering. 9: 157-167. DOI: 10.1061/(Asce)0887-3801(1995)9:2(157) |
0.401 |
|
1994 |
Rihani RA, Bernold LE. Computer Integration for Robotic Masonry Computer-Aided Civil and Infrastructure Engineering. 9: 61-67. DOI: 10.1111/J.1467-8667.1994.Tb00362.X |
0.749 |
|
1994 |
Dunston PS, Bernold LE. Adaptive Control for Robotic Rebar Bending Computer-Aided Civil and Infrastructure Engineering. 9: 53-60. DOI: 10.1111/J.1467-8667.1994.Tb00361.X |
0.437 |
|
1994 |
Bernold LE. Cable-based lunar transportation system Journal of Aerospace Engineering. 7: 1-16. DOI: 10.1061/(Asce)0893-1321(1994)7:1(1) |
0.337 |
|
1994 |
Salim MD, Bernold LE. Effects of design-integrated process planning on productivity in rebar placement Journal of Construction Engineering and Management. 120: 720-738. DOI: 10.1061/(Asce)0733-9364(1994)120:4(720) |
0.361 |
|
1994 |
Gavilan RM, Bernold LE. Source evaluation of solid waste in building construction Journal of Construction Engineering and Management. 120: 536-552. DOI: 10.1061/(Asce)0733-9364(1994)120:3(536) |
0.353 |
|
1993 |
Altobelli F, Taylor HF, Bernold LE. Prototype robotic masonry system Journal of Aerospace Engineering. 6: 19-33. DOI: 10.1061/(Asce)0893-1321(1993)6:1(19) |
0.445 |
|
1993 |
Bernold LE. Speech-based data-entry systems for construction Journal of Computing in Civil Engineering. 7: 404-419. DOI: 10.1061/(Asce)0887-3801(1993)7:4(404) |
0.415 |
|
1993 |
McCahill DF, Bernold LE. Resource-oriented modeling and simulation in construction Journal of Construction Engineering and Management. 119: 590-606. DOI: 10.1061/(Asce)0733-9364(1993)119:3(590) |
0.339 |
|
1993 |
Bernold LE, Salim M. Placement-oriented design and delivery of concrete reinforcement Journal of Construction Engineering and Management. 119: 323-335. DOI: 10.1061/(Asce)0733-9364(1993)119:2(323) |
0.398 |
|
1992 |
Chang P, Bernold L. Multi-objective process optimization for construction Canadian Journal of Civil Engineering. 19: 129-136. DOI: 10.1139/L92-013 |
0.319 |
|
1992 |
Bernold LE, Altobelli FR, Taylor H. Computer-controlled brick masonry Journal of Computing in Civil Engineering. 6: 147-160. DOI: 10.1061/(Asce)0887-3801(1992)6:2(147) |
0.458 |
|
1991 |
Bernold LE. Experimental studies on mechanics of lunar excavation Journal of Aerospace Engineering. 4: 9-22. DOI: 10.1061/(Asce)0893-1321(1991)4:1(9) |
0.323 |
|
1991 |
Bernold LE, Treseler JF. Vendor analysis for best buy in construction Journal of Construction Engineering and Management. 117: 645-658. DOI: 10.1061/(Asce)0733-9364(1991)117:4(645) |
0.371 |
|
1991 |
Miller ML, Bernold LE. Sensor-integrated nailing for building construction Journal of Construction Engineering and Management. 117: 213-225. DOI: 10.1061/(Asce)0733-9364(1991)117:2(213) |
0.405 |
|
1990 |
Bernold LE, Abraham DM, Reinhart DB. FMS approach to construction automation Journal of Aerospace Engineering. 3: 108-121. DOI: 10.1061/(Asce)0893-1321(1990)3:2(108) |
0.631 |
|
1990 |
Bernold LE, Reinhart DB. Process planning for automated stone cutting Journal of Computing in Civil Engineering. 4: 255-268. DOI: 10.1061/(ASCE)0887-3801(1990)4:3(255) |
0.304 |
|
1989 |
Bernold LE, Abraham DM, Livingston EE. Emulation for control system analysis in automated construction Journal of Computing in Civil Engineering. 3: 320-332. DOI: 10.1061/(Asce)0887-3801(1989)3:4(320) |
0.646 |
|
1987 |
Bernold LE. Automation and robotics in construction: a challenge and a chance for an industry in transition International Journal of Project Management. 5: 155-160. DOI: 10.1016/0263-7863(87)90020-2 |
0.31 |
|
Show low-probability matches. |