Year |
Citation |
Score |
2017 |
Lin CM, Su JC, Chang YJ, Liu CK, Lu HH, Jong YJ. Is carotid sonography a useful tool for predicting functional capabilities in ischemic stroke patients following carotid artery stenting? Medicine. 96: e6363. PMID 28328821 DOI: 10.1097/MD.0000000000006363 |
0.459 |
|
2011 |
Su JCP, Chang Y, Ho JC. Framework of overlapping product development activities to maximize profit Journal of the Chinese Institute of Industrial Engineers. 28: 616-627. DOI: 10.1080/10170669.2011.651166 |
0.321 |
|
2010 |
Su JCP, Chang Y, Ferguson M, Ho JC. The impact of delayed differentiation in make-to-order environments International Journal of Production Research. 48: 5809-5829. DOI: 10.1080/00207540903241970 |
0.356 |
|
2009 |
Manikas A, Chang Y. A scatter search approach to sequence-dependent setup times job shop scheduling International Journal of Production Research. 47: 5217-5236. DOI: 10.1080/00207540701805646 |
0.682 |
|
2009 |
Manikas A, Chang Y, Ferguson M. BlueLinx can benefit from innovative inventory management methods for commodity forward buys Omega-International Journal of Management Science. 37: 545-554. DOI: 10.1016/J.Omega.2007.10.003 |
0.66 |
|
2009 |
Manikas A, Chang Y. Multi-criteria sequence-dependent job shop scheduling using genetic algorithms Computers & Industrial Engineering. 56: 179-185. DOI: 10.1016/J.Cie.2008.05.002 |
0.679 |
|
2007 |
Ho JC, Solis AO, Chang Y. An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems Computers & Operations Research. 34: 2562-2575. DOI: 10.1016/J.Cor.2005.09.020 |
0.34 |
|
2006 |
Ho JC, Chang Y, Solis AO. Two modifications of the least cost per period heuristic for dynamic lot-sizing Journal of the Operational Research Society. 57: 1005-1013. DOI: 10.1057/Palgrave.Jors.2602076 |
0.353 |
|
2005 |
Su JCP, Chang Y, Ferguson M. Evaluation of postponement structures to accommodate mass customization Journal of Operations Management. 23: 305-318. DOI: 10.1016/J.Jom.2004.10.016 |
0.334 |
|
2004 |
Su JCP, Chang Y, Ho JC. Evaluation of Component Commonality Strategies in Supply Chain Environment Asia-Pacific Management Review. 9: 801-821. DOI: 10.6126/Apmr.2004.9.5.03 |
0.307 |
|
2003 |
Ho JC, Chang YL. A new MRP/GT lot sizing heuristic: A simulation study Production Planning and Control. 14: 215-224. DOI: 10.1080/0953728031000085261 |
0.34 |
|
2001 |
Ho JC, Chang YL. An integrated MRP and JIT framework Computers and Industrial Engineering. 41: 173-185. DOI: 10.1016/S0360-8352(01)00052-3 |
0.352 |
|
1997 |
Hatoum KW, Chang Y. Trade-off between quoted lead time and price Production Planning & Control. 8: 158-172. DOI: 10.1080/095372897235424 |
0.35 |
|
1996 |
Chang Y, Sueyoshi T, Sullivan RS. Ranking Dispatching Rules by Data Envelopment Analysis in a Job Shop Environment Iie Transactions. 28: 631-642. DOI: 10.1080/15458830.1996.11770708 |
0.35 |
|
1995 |
Ho JC, Chang YL. Minimizing the number of tardy jobs for m parallel machines European Journal of Operational Research. 84: 343-355. DOI: 10.1016/0377-2217(93)E0280-B |
0.38 |
|
1994 |
Chang YL. Time window capacity analysis for synchronous production Production Planning and Control. 5: 66-81. DOI: 10.1080/09537289408919473 |
0.372 |
|
1991 |
Ho JC, Chang YL. A new heuristic for the n-job, M-machine flow-shop problem European Journal of Operational Research. 52: 194-202. DOI: 10.1016/0377-2217(91)90080-F |
0.361 |
|
1991 |
Ho JC, Chang Y. Heuristics for minimizing mean tardiness form parallel machines Naval Research Logistics. 38: 367-381. DOI: 10.1002/1520-6750(199106)38:3<367::Aid-Nav3220380307>3.0.Co;2-I |
0.353 |
|
1990 |
Moeeni F, Chang Y. An Approximate Solution to Deterministic Kanban Systems Decision Sciences. 21: 596-607. DOI: 10.1111/J.1540-5915.1990.Tb00337.X |
0.372 |
|
1990 |
Chang Y, Sullivan RS. Schedule generation in a dynamic job shop International Journal of Production Research. 28: 65-74. DOI: 10.1080/00207549008942684 |
0.348 |
|
1990 |
Vakharia AJ, Chang Y. A simulated annealing approach to scheduling a manufacturing cell Naval Research Logistics. 37: 559-577. DOI: 10.1002/1520-6750(199008)37:4<559::Aid-Nav3220370409>3.0.Co;2-8 |
0.386 |
|
1989 |
Chang Y, Matsuo H, Sullivan RS. A bottleneck-based beam search for job scheduling in a flexible manufacturing system International Journal of Production Research. 27: 1949-1961. DOI: 10.1080/00207548908942666 |
0.362 |
|
1987 |
Bagchi U, Sullivan RS, Chang Y. Minimizing Mean Squared Deviation of Completion Times About a Common Due Date Management Science. 33: 894-906. DOI: 10.1287/Mnsc.33.7.894 |
0.37 |
|
Show low-probability matches. |