Year |
Citation |
Score |
2021 |
Arashpour M, Ngo T, Li H. Scene understanding in construction and buildings using image processing methods: A comprehensive review and a case study Journal of Building Engineering. 33: 101672. DOI: 10.1016/J.Jobe.2020.101672 |
0.349 |
|
2020 |
Irfan M, Zhao ZY, Li H, Rehman A. The influence of consumers' intention factors on willingness to pay for renewable energy: a structural equation modeling approach. Environmental Science and Pollution Research International. PMID 32279259 DOI: 10.1007/S11356-020-08592-9 |
0.3 |
|
2020 |
Wang G, Liu H, Li H, Luo X, Liu J. A Building Project-Based Industrialized Construction Maturity Model Involving Organizational Enablers: A Multi-Case Study in China Sustainability. 12: 4029. DOI: 10.3390/Su12104029 |
0.352 |
|
2020 |
Chen Z, Agapiou A, Li H. A benefits prioritization analysis on adopting BIM systems against major challenges in megaproject delivery Frontiers in Built Environment. 6: 26. DOI: 10.3389/Fbuil.2020.00026 |
0.319 |
|
2020 |
Zhong B, Li H, Luo H, Zhou J, Fang W, Xing X. Ontology-Based Semantic Modeling of Knowledge in Construction: Classification and Identification of Hazards Implied in Images Journal of Construction Engineering and Management-Asce. 146: 4020013. DOI: 10.1061/(Asce)Co.1943-7862.0001767 |
0.318 |
|
2020 |
Cao Y, Zhang X, Zhang X, Li H. The incremental construction land differentiated management framework: the perspective of land quota trading in China Land Use Policy. 96: 104675. DOI: 10.1016/J.Landusepol.2020.104675 |
0.309 |
|
2020 |
Wang Z, Li H, Yang X. Vision-based robotic system for on-site construction and demolition waste sorting and recycling Journal of Building Engineering. 101769. DOI: 10.1016/J.Jobe.2020.101769 |
0.323 |
|
2020 |
Liu D, Li H, Wang H, Qi C, Rose T. Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling Expert Systems With Applications. 148: 113230. DOI: 10.1016/J.Eswa.2020.113230 |
0.338 |
|
2020 |
Teizer J, Neve H, Li H, Wandahl S, König J, Ochner B, König M, Lerche J. Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring Automation in Construction. 116: 103245. DOI: 10.1016/J.Autcon.2020.103245 |
0.328 |
|
2020 |
Mo Y, Zhao D, Du J, Syal M, Aziz A, Li H. Automated staff assignment for building maintenance using natural language processing Automation in Construction. 113: 103150. DOI: 10.1016/J.Autcon.2020.103150 |
0.33 |
|
2020 |
Asadzadeh A, Arashpour M, Li H, Ngo T, Bab-Hadiashar A, Rashidi A. Sensor-based safety management Automation in Construction. 113: 103128. DOI: 10.1016/J.Autcon.2020.103128 |
0.305 |
|
2020 |
Shirowzhan S, Sepasgozar SME, Edwards DJ, Li H, Wang C. BIM compatibility and its differentiation with interoperability challenges as an innovation factor Automation in Construction. 112: 103086. DOI: 10.1016/J.Autcon.2020.103086 |
0.345 |
|
2020 |
Fang W, Ding L, Love PED, Luo H, Li H, Peña-Mora F, Zhong B, Zhou C. Computer vision applications in construction safety assurance Automation in Construction. 110: 103013. DOI: 10.1016/J.Autcon.2019.103013 |
0.308 |
|
2020 |
Xu Z, Zhang L, Li H, Lin Y, Yin S. Combining IFC and 3D tiles to create 3D visualization for building information modeling Automation in Construction. 109: 102995. DOI: 10.1016/J.Autcon.2019.102995 |
0.305 |
|
2020 |
Zhong B, Xing X, Luo H, Zhou Q, Li H, Rose TM, Fang W. Deep learning-based extraction of construction procedural constraints from construction regulations Advanced Engineering Informatics. 43: 101003. DOI: 10.1016/J.Aei.2019.101003 |
0.306 |
|
2019 |
Sepasgozar SME, Li H, Shirowzhan S, Tam VWY. Methods for monitoring construction off-road vehicle emissions: a critical review for identifying deficiencies and directions. Environmental Science and Pollution Research International. PMID 31012071 DOI: 10.1007/S11356-019-05003-6 |
0.309 |
|
2019 |
Liu D, Wang H, Li H, Wang J, Khallaf M. Hierarchical task network approach for time and budget constrained construction project planning Technological and Economic Development of Economy. 25: 472-495. DOI: 10.3846/Tede.2019.9384 |
0.342 |
|
2019 |
Zhong B, Hei Y, Li H, Rose T, Luo H. Patent cooperative patterns and development trends of Chinese construction enterprises: A network analysis Journal of Civil Engineering and Management. 25: 228-240. DOI: 10.3846/Jcem.2019.8137 |
0.322 |
|
2019 |
Deraman R, Wang C, Yap JBH, Li H, Mohd-Rahim FA. Developing Internet Online Procurement Frameworks for Construction Firms Future Internet. 11: 136. DOI: 10.3390/Fi11060136 |
0.308 |
|
2019 |
Tang Y, Wang G, Li H, Cao D, Li X. Comparing Project-Based Collaborative Networks for BIM Implementation in Public and Private Sectors: A Longitudinal Study in Hong Kong Advances in Civil Engineering. 2019: 1-14. DOI: 10.1155/2019/6213694 |
0.334 |
|
2019 |
Zeng W, Wang H, Li H, Zhou H, Wu P, Le Y. Incentive Mechanisms for Supplier Development in Mega Construction Projects Ieee Transactions On Engineering Management. 66: 252-265. DOI: 10.1109/Tem.2018.2808169 |
0.34 |
|
2019 |
Antwi-Afari MF, Li H, Wong JK, Oladinrin OT, Ge JX, Seo J, Wong AYL. Sensing and warning-based technology applications to improve occupational health and safety in the construction industry Engineering, Construction and Architectural Management. 26: 1534-1552. DOI: 10.1108/Ecam-05-2018-0188 |
0.306 |
|
2019 |
Li X, Li H, Cao D, Tang Y, Luo X, Wang G. Modeling Dynamics of Project-Based Collaborative Networks for BIM Implementation in the Construction Industry: Empirical Study in Hong Kong Journal of Construction Engineering and Management-Asce. 145: 5019013. DOI: 10.1061/(Asce)Co.1943-7862.0001726 |
0.352 |
|
2019 |
Liu Z, Wang H, Li H. Erratum for “Model of Equipment Sharing between Contractors on Construction Projects” by Zhi Liu, Hongwei Wang, and Heng Li Journal of Construction Engineering and Management-Asce. 145: 8219002. DOI: 10.1061/(Asce)Co.1943-7862.0001699 |
0.305 |
|
2019 |
Zhang H, Yan X, Li H, Jin R, Fu H. Real-Time Alarming, Monitoring, and Locating for Non-Hard-Hat Use in Construction Journal of Construction Engineering and Management-Asce. 145: 4019006. DOI: 10.1061/(Asce)Co.1943-7862.0001629 |
0.3 |
|
2019 |
Wang F, Li H, Dong C, Ding L. Knowledge representation using non-parametric Bayesian networks for tunneling risk analysis Reliability Engineering & System Safety. 191: 106529. DOI: 10.1016/J.Ress.2019.106529 |
0.321 |
|
2019 |
Oraee M, Hosseini MR, Edwards DJ, Li H, Papadonikolaki E, Cao D. Collaboration barriers in BIM-based construction networks: A conceptual model International Journal of Project Management. 37: 839-854. DOI: 10.1016/J.Ijproman.2019.05.004 |
0.351 |
|
2019 |
Wu Z, Li H, Feng Y, Luo X, Chen Q. Developing a green building evaluation standard for interior decoration: A case study of China Building and Environment. 152: 50-58. DOI: 10.1016/J.Buildenv.2019.02.010 |
0.325 |
|
2019 |
Zhong B, Wu H, Ding L, Love PED, Li H, Luo H, Jiao L. Mapping computer vision research in construction: Developments, knowledge gaps and implications for research Automation in Construction. 107: 102919. DOI: 10.1016/J.Autcon.2019.102919 |
0.343 |
|
2019 |
Kim M, Wang Q, Li H. Non-contact sensing based geometric quality assessment of buildings and civil structures: A review Automation in Construction. 100: 163-179. DOI: 10.1016/J.Autcon.2019.01.002 |
0.339 |
|
2019 |
Wang D, Li H, Chen J. Detecting and measuring construction workers' vigilance through hybrid kinematic-EEG signals Automation in Construction. 100: 11-23. DOI: 10.1016/J.Autcon.2018.12.018 |
0.333 |
|
2018 |
Xu Z, Huang T, Li B, Li H, Li Q. Developing an IFC-Based Database for Construction Quality Evaluation Advances in Civil Engineering. 2018: 1-22. DOI: 10.1155/2018/3946051 |
0.329 |
|
2018 |
Tang Y, Wang G, Li H, Cao D. Dynamics of Collaborative Networks between Contractors and Subcontractors in the Construction Industry: Evidence from National Quality Award Projects in China Journal of Construction Engineering and Management-Asce. 144: 5018009. DOI: 10.1061/(Asce)Co.1943-7862.0001555 |
0.318 |
|
2018 |
Liu Z, Wang H, Li H. Model of Equipment Sharing between Contractors on Construction Projects Journal of Construction Engineering and Management-Asce. 144: 4018039. DOI: 10.1061/(Asce)Co.1943-7862.0001485 |
0.321 |
|
2018 |
Dong S, Li H, Yin Q. Building information modeling in combination with real time location systems and sensors for safety performance enhancement Safety Science. 102: 226-237. DOI: 10.1016/J.Ssci.2017.10.011 |
0.308 |
|
2018 |
Kong L, Li H, Luo H, Ding L, Zhang X. Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction Journal of Cleaner Production. 193: 684-701. DOI: 10.1016/J.Jclepro.2018.05.037 |
0.32 |
|
2018 |
Shen L, Ren Y, Xiong N, Li H, Chen Y. Why small towns can not share the benefits of urbanization in China Journal of Cleaner Production. 174: 728-738. DOI: 10.1016/J.Jclepro.2017.10.150 |
0.307 |
|
2018 |
Shen L, Chen Y, Li H, Wei X, Ren Y. Development orientations for attracting investments – A perspective of less-developed townships in China Cities. 76: 84-95. DOI: 10.1016/J.Cities.2018.01.011 |
0.308 |
|
2018 |
Xu Z, Li S, Li H, Li Q. Modeling and problem solving of building defects using point clouds and enhanced case-based reasoning Automation in Construction. 96: 40-54. DOI: 10.1016/J.Autcon.2018.09.003 |
0.327 |
|
2018 |
Umer W, Li H, Lu W, Szeto GPY, Wong AYL. Development of a tool to monitor static balance of construction workers for proactive fall safety management Automation in Construction. 94: 438-448. DOI: 10.1016/J.Autcon.2018.07.024 |
0.344 |
|
2018 |
Li Y, Hu Y, Xia B, Skitmore M, Li H. Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects Automation in Construction. 95: 118-128. DOI: 10.1016/J.Autcon.2018.07.021 |
0.313 |
|
2018 |
Fang Q, Li H, Luo X, Ding L, Luo H, Li C. Computer vision aided inspection on falling prevention measures for steeplejacks in an aerial environment Automation in Construction. 93: 148-164. DOI: 10.1016/J.Autcon.2018.05.022 |
0.308 |
|
2018 |
Dong C, Wang F, Li H, Ding L, Luo H. Knowledge dynamics-integrated map as a blueprint for system development: Applications to safety risk management in Wuhan metro project Automation in Construction. 93: 112-122. DOI: 10.1016/J.Autcon.2018.05.014 |
0.316 |
|
2018 |
Antwi-Afari MF, Li H, Pärn EA, Edwards DJ. Critical success factors for implementing building information modelling (BIM): A longitudinal review Automation in Construction. 91: 100-110. DOI: 10.1016/J.Autcon.2018.03.010 |
0.346 |
|
2018 |
Fang Q, Li H, Luo X, Ding L, Luo H, Rose TM, An W. Detecting non-hardhat-use by a deep learning method from far-field surveillance videos Automation in Construction. 85: 1-9. DOI: 10.1016/J.Autcon.2017.09.018 |
0.305 |
|
2018 |
Kong L, Li H, Yu Y, Luo H, Skitmore M, Antwi-Afari MF. Quantifying the physical intensity of construction workers, a mechanical energy approach Advanced Engineering Informatics. 38: 404-419. DOI: 10.1016/J.Aei.2018.08.005 |
0.306 |
|
2018 |
Fang Q, Li H, Luo X, Ding L, Rose TM, An W, Yu Y. A deep learning-based method for detecting non-certified work on construction sites Advanced Engineering Informatics. 35: 56-68. DOI: 10.1016/J.Aei.2018.01.001 |
0.303 |
|
2017 |
Cao D, Li H, Wang G, Luo X, Yang X, Tan D. Dynamics of Project-Based Collaborative Networks for BIM Implementation: Analysis Based on Stochastic Actor-Oriented Models Journal of Management in Engineering. 33: 4016055. DOI: 10.1061/(Asce)Me.1943-5479.0000503 |
0.325 |
|
2017 |
Luo X, Li H, Dai F, Cao D, Yang X, Guo H. Hierarchical Bayesian Model of Worker Response to Proximity Warnings of Construction Safety Hazards: Toward Constant Review of Safety Risk Control Measures Journal of Construction Engineering and Management-Asce. 143: 4017006. DOI: 10.1061/(Asce)Co.1943-7862.0001277 |
0.307 |
|
2017 |
Cao D, Li H, Wang G, Huang T. Identifying and contextualising the motivations for BIM implementation in construction projects: An empirical study in China International Journal of Project Management. 35: 658-669. DOI: 10.1016/J.Ijproman.2016.02.002 |
0.344 |
|
2017 |
Yu Y, Guo H, Ding Q, Li H, Skitmore M. An experimental study of real-time identification of construction workers' unsafe behaviors Automation in Construction. 82: 193-206. DOI: 10.1016/J.Autcon.2017.05.002 |
0.33 |
|
2017 |
Li H, Yang X, Skitmore M, Wang F, Forsythe P. Automated classification of construction site hazard zones by crowd-sourced integrated density maps Automation in Construction. 81: 328-339. DOI: 10.1016/J.Autcon.2017.04.007 |
0.329 |
|
2017 |
Kong L, Li H, Luo H, Ding L, Luo X, Skitmore M. Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates Automation in Construction. 81: 34-43. DOI: 10.1016/J.Autcon.2017.03.016 |
0.305 |
|
2017 |
Li H, Li X, Luo X, Siebert J. Investigation of the causality patterns of non-helmet use behavior of construction workers Automation in Construction. 80: 95-103. DOI: 10.1016/J.Autcon.2017.02.006 |
0.322 |
|
2017 |
Yang X, Luo X, Li H, Luo X, Guo H. Location-based measurement and visualization for interdependence network on construction sites Advanced Engineering Informatics. 34: 36-45. DOI: 10.1016/J.Aei.2017.09.003 |
0.348 |
|
2016 |
Lu H, Wang H, Xie Y, Li H. Construction Material Safety-Stock Determination Under Nonstationary Stochastic Demand and Random Supply Yield Ieee Transactions On Engineering Management. DOI: 10.1109/Tem.2016.2536146 |
0.325 |
|
2016 |
Cao D, Li H, Wang G, Zhang W. Linking the Motivations and Practices of Design Organizations to Implement Building Information Modeling in Construction Projects: Empirical Study in China Journal of Management in Engineering. 32: 4016013. DOI: 10.1061/(Asce)Me.1943-5479.0000453 |
0.34 |
|
2016 |
Luo X, Li H, Huang T, Rose T. A field experiment of workers' responses to proximity warnings of static safety hazards on construction sites Safety Science. 84: 216-224. DOI: 10.1016/J.Ssci.2015.12.026 |
0.31 |
|
2016 |
Li H, Yang X, Wang F, Rose T, Chan G, Dong S. Stochastic state sequence model to predict construction site safety states through Real-Time Location Systems Safety Science. 84: 78-87. DOI: 10.1016/J.Ssci.2015.11.025 |
0.311 |
|
2016 |
Li H, Chan G, Wong JKW, Skitmore M. Real-time locating systems applications in construction Automation in Construction. 63: 37-47. DOI: 10.1016/J.Autcon.2015.12.001 |
0.303 |
|
2015 |
Liu W, Guo H, Li H, Li Y. Retraction Notice: Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-Span Steel-Box Arch Bridge Project International Journal of Advanced Robotic Systems. 12: 96. DOI: 10.5772/61239 |
0.341 |
|
2015 |
Li H, Chan G, Skitmore M, Huang T. A 4D automatic simulation tool for construction resource planning: A case study Engineering, Construction and Architectural Management. 22: 536-550. DOI: 10.1108/Ecam-07-2014-0093 |
0.332 |
|
2015 |
Fan H, Xue F, Li H. Project-based as-needed information retrieval from unstructured AEC documents Journal of Management in Engineering. 31. DOI: 10.1061/(Asce)Me.1943-5479.0000341 |
0.336 |
|
2015 |
Li H, Lu M, Hsu SC, Gray M, Huang T. Proactive behavior-based safety management for construction safety improvement Safety Science. 75: 107-117. DOI: 10.1016/J.Ssci.2015.01.013 |
0.324 |
|
2015 |
Li H, Chan G, Huang T, Skitmore M, Tao TYE, Luo E, Chung J, Chan XS, Li YF. Chirp-spread-spectrum-based real time location system for construction safety management: A case study Automation in Construction. 55: 58-65. DOI: 10.1016/J.Autcon.2015.03.024 |
0.361 |
|
2015 |
Zhang H, Yang F, Li Y, Li H. Predicting profitability of listed construction companies based on principal component analysis and support vector machine—Evidence from China Automation in Construction. 53: 22-28. DOI: 10.1016/J.Autcon.2015.03.001 |
0.305 |
|
2015 |
Cao D, Wang G, Li H, Skitmore M, Huang T, Zhang W. Practices and effectiveness of building information modelling in construction projects in China Automation in Construction. 49: 113-122. DOI: 10.1016/J.Autcon.2014.10.014 |
0.351 |
|
2015 |
Li H, Lu M, Chan G, Skitmore M. Proactive training system for safe and efficient precast installation Automation in Construction. 49: 163-174. DOI: 10.1016/J.Autcon.2014.10.010 |
0.302 |
|
2014 |
Wong JKW, Li H, Chan G, Wang H, Huang T, Luo E, Li V. Virtual prototyping for construction site Co2 emissions and hazard detection International Journal of Advanced Robotic Systems. 11. DOI: 10.5772/58439 |
0.331 |
|
2014 |
Chen Z, Abdullah AB, Anumba CJ, Li H. ANP Experiment for Demolition Plan Evaluation Journal of Construction Engineering and Management-Asce. 140: 6013005. DOI: 10.1061/(Asce)Co.1943-7862.0000791 |
0.308 |
|
2013 |
Gulliford C, Bartnik A, Bazarov I, Cultrera L, Dobbins J, Dunham B, Gonzalez F, Karkare S, Lee H, Li H, Li Y, Liu X, Maxson J, Nguyen C, Smolenski K, et al. Demonstration of low emittance in the Cornell energy recovery linac injector prototype Physical Review Special Topics - Accelerators and Beams. 16. DOI: 10.1103/Physrevstab.16.073401 |
0.539 |
|
2013 |
Li H, Chan G, Skitmore M. Integrating real time positioning systems to improve blind lifting and loading crane operations Construction Management and Economics. 31: 596-605. DOI: 10.1080/01446193.2012.756144 |
0.313 |
|
2013 |
Jin Z, Deng F, Li H, Skitmore M. Practical Framework for Measuring Performance of International Construction Firms Journal of Construction Engineering and Management-Asce. 139: 1154-1167. DOI: 10.1061/(Asce)Co.1943-7862.0000718 |
0.322 |
|
2013 |
Lu W, Peng Y, Shen Q, Li H. Generic Model for Measuring Benefits of BIM as a Learning Tool in Construction Tasks Journal of Construction Engineering and Management-Asce. 139: 195-203. DOI: 10.1061/(Asce)Co.1943-7862.0000585 |
0.305 |
|
2013 |
Fan H, Li H. Retrieving similar cases for alternative dispute resolution in construction accidents using text mining techniques Automation in Construction. 34: 85-91. DOI: 10.1016/J.Autcon.2012.10.014 |
0.315 |
|
2013 |
Guo HL, Li H, Li V. VP-based safety management in large-scale construction projects: A conceptual framework Automation in Construction. 34: 16-24. DOI: 10.1016/J.Autcon.2012.10.013 |
0.336 |
|
2013 |
Cheng F, Li H, Wang Y-, Skitmore M, Forsythe P. Modeling resource management in the building design process by information constraint Petri nets Automation in Construction. 29: 92-99. DOI: 10.1016/J.Autcon.2012.08.005 |
0.323 |
|
2012 |
Scott D, Cheong M, Li H. Web-based Construction Information Management System Australasian Journal of Construction Economics and Building. 3: 43-52. DOI: 10.5130/Ajceb.V3I1.2910 |
0.334 |
|
2012 |
Li H, Chan NKY, Skitmore M. The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes Construction Innovation: Information, Process, Management. 12: 429-446. DOI: 10.1108/14714171211272207 |
0.331 |
|
2012 |
Chun CK, Li H, Skitmore M. The use of virtual prototyping for hazard identification in the early design stage Construction Innovation. 12: 29-42. DOI: 10.1108/14714171211197481 |
0.353 |
|
2012 |
Li H, Guo H, Li Y, Skitmore M. From IKEA model to the lean construction concept : a solution to implementation The International Journal of Construction Management. 12: 47-63. DOI: 10.1080/15623599.2012.10773200 |
0.349 |
|
2012 |
Li H, Chan NKY, Huang T, Skitmore M, Yang J. Virtual prototyping for planning bridge construction Automation in Construction. 27: 1-10. DOI: 10.1016/J.Autcon.2012.04.009 |
0.347 |
|
2012 |
Li H, Chan G, Skitmore M. Visualizing safety assessment by integrating the use of game technology Automation in Construction. 22: 498-505. DOI: 10.1016/J.Autcon.2011.11.009 |
0.323 |
|
2012 |
Xue X, Shen Q, Fan H, Li H, Fan S. IT supported collaborative work in A/E/C projects: A ten-year review Automation in Construction. 21: 1-9. DOI: 10.1016/J.Autcon.2011.05.016 |
0.334 |
|
2011 |
Diao X, Li H, Zeng S, Tam VWY, Guo H. A pareto multi-objective optimization approach for solving time-cost-quality tradeoff problems Technological and Economic Development of Economy. 17: 22-41. DOI: 10.3846/13928619.2011.553988 |
0.303 |
|
2011 |
Li H, Bazarov IV, Dunham BM, Wise FW. Three-dimensional laser pulse intensity diagnostic for photoinjectors Physical Review Special Topics - Accelerators and Beams. 14. DOI: 10.1103/Physrevstab.14.112802 |
0.555 |
|
2011 |
Li H, Guo H, Skitmore M, Huang T, Chan KYN, Chan G. Rethinking prefabricated construction management using the VP‐based IKEA model in Hong Kong Construction Management and Economics. 29: 233-245. DOI: 10.1080/01446193.2010.545994 |
0.351 |
|
2011 |
Ding LY, Wu XG, Li H, Luo HB, Zhou Y. Study on safety control for Wuhan metro construction in complex environments International Journal of Project Management. 29: 797-807. DOI: 10.1016/J.Ijproman.2011.04.006 |
0.313 |
|
2011 |
Chen Z, Li H, Ren H, Xu Q, Hong J. A total environmental risk assessment model for international hub airports International Journal of Project Management. 29: 856-866. DOI: 10.1016/J.Ijproman.2011.03.004 |
0.314 |
|
2011 |
Lu W, Huang GQ, Li H. Scenarios for applying RFID technology in construction project management Automation in Construction. 20: 101-106. DOI: 10.1016/J.Autcon.2010.09.007 |
0.341 |
|
2010 |
Guo H, Li H, Skitmore M. Life-cycle management of construction projects based on virtual prototyping technology Journal of Management in Engineering. 26: 41-47. DOI: 10.1061/(Asce)0742-597X(2010)26:1(41) |
0.351 |
|
2010 |
Wong JKW, Li H. Construction, application and validation of selection evaluation model (SEM) for intelligent HVAC control system Automation in Construction. 19: 261-269. DOI: 10.1016/J.Autcon.2009.10.002 |
0.33 |
|
2009 |
Wong JKW, Li H. Development of intelligence analytic models for integrated building management systems (IBMS) in intelligent buildings Intelligent Buildings International. 1: 5-22. DOI: 10.3763/Inbi.2009.0011 |
0.338 |
|
2009 |
Huang T, Li H, Guo H, Chan N, Kong S, Chan G, Skitmore M. Construction virtual prototyping: a survey of use Construction Innovation: Information, Process, Management. 9: 420-433. DOI: 10.1108/14714170910995958 |
0.356 |
|
2009 |
Baldwin A, Li H, Huang T, Kong CW, Guo HL, Chan N, Wong J. Supporting pre‐tender construction planning with virtual prototyping Engineering, Construction and Architectural Management. 16: 150-161. DOI: 10.1108/09699980910938028 |
0.369 |
|
2009 |
Yao X, Li H. Pentagon Tri-Wheel Model (PTW): A New Project Management Model Based on Complexity Theory The International Journal of Construction Management. 9: 43-60. DOI: 10.1080/15623599.2009.10773121 |
0.332 |
|
2009 |
Li H, Lu W, Huang T. Rethinking project management and exploring virtual design and construction as a potential solution Construction Management and Economics. 27: 363-371. DOI: 10.1080/01446190902838217 |
0.35 |
|
2009 |
Li H, Chan N, Huang T, Guo H, Lu W, Skitmore M. Optimizing construction planning schedules by virtual prototyping enabled resource analysis Automation in Construction. 18: 912-918. DOI: 10.1016/J.Autcon.2009.04.002 |
0.348 |
|
2008 |
Li H, Guo H, Skibniewski MJ, Skitmore M. Using the IKEA model and virtual prototyping technology to improve construction process management Construction Management and Economics. 26: 991-1000. DOI: 10.1080/01446190802290477 |
0.35 |
|
2008 |
Zhang H, Li H, Lu M. Modeling Time-Constraints in Construction Operations through Simulation Journal of Construction Engineering and Management-Asce. 134: 545-554. DOI: 10.1061/(Asce)0733-9364(2008)134:7(545) |
0.307 |
|
2008 |
Chen Z, Li H, Ross A, Khalfan MMA, Kong SCW. Knowledge-driven ANP approach to vendors evaluation for sustainable construction Journal of Construction Engineering and Management-Asce. 134: 928-941. DOI: 10.1061/(Asce)0733-9364(2008)134:12(928) |
0.354 |
|
2008 |
Li H, Huang T, Kong CW, Guo HL, Baldwin A, Chan N, Wong J. Integrating design and construction through virtual prototyping Automation in Construction. 17: 915-922. DOI: 10.1016/J.Autcon.2008.02.016 |
0.356 |
|
2008 |
Wong J, Li H, Lai J. Evaluating the system intelligence of the intelligent building systems: Part 2: Construction and validation of analytical models Automation in Construction. 17: 303-321. DOI: 10.1016/J.Autcon.2007.06.003 |
0.325 |
|
2008 |
Wong J, Li H, Lai J. Evaluating the system intelligence of the intelligent building systems: Part 1: Development of key intelligent indicators and conceptual analytical framework Automation in Construction. 17: 284-302. DOI: 10.1016/J.Autcon.2007.06.002 |
0.333 |
|
2007 |
Zhou S, Ouzounov D, Li H, Bazarov I, Dunham B, Sinclair C, Wise FW. Efficient temporal shaping of ultrashort pulses with birefringent crystals. Applied Optics. 46: 8488-92. PMID 18071380 DOI: 10.1364/Ao.46.008488 |
0.546 |
|
2007 |
Cheng EWL, Li H, Fox P. Job performance dimensions for improving final project outcomes Journal of Construction Engineering and Management-Asce. 133: 592-599. DOI: 10.1061/(Asce)0733-9364(2007)133:8(592) |
0.319 |
|
2007 |
Guo H, Li H, Shen Q, Wang Y, Li Y. Real estate confidence index based on Web GIS and SPSS WebAPP International Journal of Project Management. 25: 171-177. DOI: 10.1016/J.Ijproman.2006.09.015 |
0.323 |
|
2007 |
Cheng EW, Li H, Yu L. A GIS approach to shopping mall location selection Building and Environment. 42: 884-892. DOI: 10.1016/J.Buildenv.2005.10.010 |
0.316 |
|
2007 |
Cheng EWL, Li H. Application of ANP in process models: An example of strategic partnering Building and Environment. 42: 278-287. DOI: 10.1016/J.Buildenv.2005.07.031 |
0.306 |
|
2007 |
Huang T, Kong CW, Guo HL, Baldwin A, Li H. A virtual prototyping system for simulating construction processes Automation in Construction. 16: 576-585. DOI: 10.1016/J.Autcon.2006.09.007 |
0.344 |
|
2006 |
Xiang D, Li H. Adopting Leveraged Buyout (LBO) Mechanism for Improving the Competitiveness of the State-Owned Construction Enterprises The International Journal of Construction Management. 6: 63-74. DOI: 10.1080/15623599.2006.10773088 |
0.302 |
|
2006 |
Wong JKW, Wong PNK, Li H. The adjustment of leadership styles in intercultural workplace – some evidences from the multinational construction companies in Hong Kong Hkie Transactions. 13: 31-40. DOI: 10.1080/1023697X.2006.10668038 |
0.308 |
|
2006 |
Zhang H, Li H, Tam CM. Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects Construction Management and Economics. 24: 159-169. DOI: 10.1080/01446190500184311 |
0.317 |
|
2006 |
Cheng EWL, Li H. Job Performance Evaluation for Construction Companies: An Analytic Network Process Approach Journal of Construction Engineering and Management-Asce. 132: 827-835. DOI: 10.1061/(Asce)0733-9364(2006)132:8(827) |
0.31 |
|
2006 |
Chen Z, Clements-Croome D, Hong J, Li H, Xu Q. A multicriteria lifespan energy efficiency approach to intelligent building assessment Energy and Buildings. 38: 393-409. DOI: 10.1016/J.Enbuild.2005.08.001 |
0.321 |
|
2005 |
Li H, Yu L, Cheng EWL. A GIS‐based site selection system for real estate projects Construction Innovation. 5: 231-241. DOI: 10.1108/14714170510815276 |
0.315 |
|
2005 |
Cheng EW, Li H, Yu L. The analytic network process (ANP) approach to location selection: a shopping mall illustration Construction Innovation. 5: 83-97. DOI: 10.1108/14714170510815195 |
0.305 |
|
2005 |
Chen Z, Li H, Kong SCW, Xu Q. A knowledge‐driven management approach to environmental‐conscious construction Construction Innovation: Information, Process, Management. 5: 27-39. DOI: 10.1108/14714170510815159 |
0.342 |
|
2005 |
Li H, Shen QP, Love PED. Cost modelling of office buildings in Hong Kong: an exploratory study Facilities. 23: 438-452. DOI: 10.1108/02632770510602379 |
0.313 |
|
2005 |
Cheng EWL, Li H. Analytic network process applied to project selection Journal of Construction Engineering and Management-Asce. 131: 459-466. DOI: 10.1061/(Asce)0733-9364(2005)131:4(459) |
0.342 |
|
2005 |
Chen Z, Li H, Wong CTC. EnvironalPlanning : Analytic Network Process Model for Environmentally Conscious Construction Planning Journal of Construction Engineering and Management-Asce. 131: 92-101. DOI: 10.1061/(Asce)0733-9364(2005)131:1(92) |
0.326 |
|
2005 |
Li H, Chen Z, Yong L, Kong SCW. Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency Automation in Construction. 14: 323-331. DOI: 10.1016/J.Autcon.2004.08.007 |
0.31 |
|
2005 |
Cao Y, Li H, Liang Y. Using engineering drawing interpretation for automatic detection of version information in CADD engineering drawing Automation in Construction. 14: 361-367. DOI: 10.1016/J.Autcon.2004.08.004 |
0.31 |
|
2005 |
Brandon P, Li H, Shen Q. Construction IT and the 'tipping point' Automation in Construction. 14: 281-286. DOI: 10.1016/J.Autcon.2004.08.002 |
0.318 |
|
2004 |
Shen Q, Li H, Chung J, Hui PY. A framework for identification and representation of client requirements in the briefing process Construction Management and Economics. 22: 213-221. DOI: 10.1080/0144619042000201411 |
0.344 |
|
2004 |
Chen Z, Li H, Shen Q, Xu W. An empirical model for decision-making on ISO 14000 acceptance in the Shanghai construction industry Construction Management and Economics. 22: 55-73. DOI: 10.1080/0144619042000186068 |
0.343 |
|
2004 |
Cheng EWL, Li H. Development of a Practical Model of Partnering for Construction Projects Journal of Construction Engineering and Management-Asce. 130: 790-798. DOI: 10.1061/(Asce)0733-9364(2004)130:6(790) |
0.316 |
|
2004 |
Liu G, Shen Q, Li H, Shen L. Factors constraining the development of professional project management in China's construction industry International Journal of Project Management. 22: 203-211. DOI: 10.1016/S0263-7863(03)00068-1 |
0.344 |
|
2004 |
Fang D, Xie F, Huang X, Li H. Factor analysis-based studies on construction workplace safety management in China International Journal of Project Management. 22: 43-49. DOI: 10.1016/S0263-7863(02)00115-1 |
0.31 |
|
2004 |
Cheng EWL, Li H. Exploring quantitative methods for project location selection Building and Environment. 39: 1467-1476. DOI: 10.1016/J.Buildenv.2004.03.015 |
0.339 |
|
2004 |
Cheng EWL, Li H, Love PED, Irani Z. Strategic alliances: a model for establishing long-term commitment to inter-organizational relations in construction Building and Environment. 39: 459-468. DOI: 10.1016/J.Buildenv.2003.09.014 |
0.334 |
|
2004 |
Chen Z, Li H, Hong J. An integrative methodology for environmental management in construction Automation in Construction. 13: 621-628. DOI: 10.1016/J.Autcon.2004.04.006 |
0.354 |
|
2004 |
Shen Q, Chung JKH, Li H, Shen L. A Group Support System for improving value management studies in construction Automation in Construction. 13: 209-224. DOI: 10.1016/J.Autcon.2003.07.001 |
0.328 |
|
2003 |
Li H, Chen Z, Wong CTC. Barcode technology for an incentive reward program to reduce construction wastes Computer-Aided Civil and Infrastructure Engineering. 18: 313-324. DOI: 10.1111/1467-8667.00320 |
0.318 |
|
2003 |
Shen Q, Li H, Shen L, Drew D, Chung J. Benchmarking the use of information technology by the quantity surveying profession Benchmarking: An International Journal. 10: 581-596. DOI: 10.1108/14635770310505193 |
0.326 |
|
2003 |
Li H, Kong CW, Pang YC, Shi WZ, Yu L. Internet-Based Geographical Information Systems System for E-Commerce Application in Construction Material Procurement Journal of Construction Engineering and Management. 129: 689-697. DOI: 10.1061/(Asce)0733-9364(2003)129:6(689) |
0.305 |
|
2003 |
Ogunlana SO, Li H, Sukhera FA. System Dynamics Approach to Exploring Performance Enhancement in a Construction Organization Journal of Construction Engineering and Management-Asce. 129: 528-536. DOI: 10.1061/(Asce)0733-9364(2003)129:5(528) |
0.311 |
|
2003 |
Lu M, Li H. Resource-Activity Critical-Path Method For Construction Planning Journal of Construction Engineering and Management-Asce. 129: 412-420. DOI: 10.1061/(Asce)0733-9364(2003)129:4(412) |
0.338 |
|
2003 |
Li H, Ma Z, Shen Q, Kong S. Virtual experiment of innovative construction operations Automation in Construction. 12: 561-575. DOI: 10.1016/S0926-5805(03)00019-0 |
0.33 |
|
2002 |
Cheng EWL, Li H, Love PED, Irani Z. A generic conceptual framework for a Total Information Networking System in construction International Journal of Services Technology and Management. 3: 125-138. DOI: 10.1504/Ijstm.2002.001621 |
0.334 |
|
2002 |
Love PED, Holt GD, Li H. Triangulation in construction management research Engineering, Construction and Architectural Management. 9: 294-303. DOI: 10.1108/Eb021224 |
0.307 |
|
2002 |
Love PED, Irani Z, Cheng E, Li H. A model for supporting inter-organizational relations in the supply chain Engineering, Construction and Architectural Management. 9: 2-15. DOI: 10.1108/Eb021202 |
0.325 |
|
2002 |
Li H, Chen Z, Wong CTC, Love PED. A quantitative approach to construction pollution control based on resource levelling Construction Innovation: Information, Process, Management. 2: 71-81. DOI: 10.1108/14714170210814694 |
0.319 |
|
2002 |
Li H, Tang S, Love PED. VHBuild.com: a Web‐based system for managing knowledge in projects Internet Research. 12: 371-379. DOI: 10.1108/10662240210447128 |
0.316 |
|
2002 |
Chen Z, Li H, Wong CTC, Love PED. Integrating construction pollution control with construction schedule: an experimental approach Environmental Management and Health. 13: 142-151. DOI: 10.1108/09566160210424572 |
0.327 |
|
2002 |
Josephson P, Larsson B, Li H. Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry Journal of Management in Engineering. 18: 76-83. DOI: 10.1061/(Asce)0742-597X(2002)18:2(76) |
0.335 |
|
2002 |
Shen LY, Li H, Li QM. Alternative Concession Model for Build Operate Transfer Contract Projects Journal of Construction Engineering and Management-Asce. 128: 326-330. DOI: 10.1061/(Asce)0733-9364(2002)128:4(326) |
0.339 |
|
2002 |
Cao Y, Wang S, Li H. Automatic recognition of tables in construction tender documents Automation in Construction. 11: 573-584. DOI: 10.1016/S0926-5805(01)00067-X |
0.313 |
|
2002 |
Chen Z, Li H, Wong CT. An application of bar-code system for reducing construction wastes Automation in Construction. 11: 521-533. DOI: 10.1016/S0926-5805(01)00063-2 |
0.329 |
|
2002 |
Love PE, Holt GD, Shen LY, Li H, Irani Z. Using systems dynamics to better understand change and rework in construction project management systems International Journal of Project Management. 20: 425-436. DOI: 10.1016/S0263-7863(01)00039-4 |
0.32 |
|
2001 |
Shen Q, Li H, Deng Z. Intelligent multimedia for expertise‐intensive training in construction Logistics Information Management. 14: 386-393. DOI: 10.1108/Eum0000000006250 |
0.307 |
|
2001 |
Cheng EWL, Li H. Development of a conceptual model of construction partnering Engineering, Construction and Architectural Management. 8: 292-303. DOI: 10.1108/Eb021190 |
0.338 |
|
2001 |
Love PED, Irani Z, Li H, Cheng EWL, Tse RYC. An empirical analysis of the barriers to implementing e‐commerce in small‐medium sized construction contractors in the state of Victoria, Australia Construction Innovation: Information, Process, Management. 1: 31-41. DOI: 10.1108/14714170110814497 |
0.31 |
|
2001 |
Cheng EWL, Li H, Love PED, Irani Z. An e‐business model to support supply chain activities in construction Logistics Information Management. 14: 68-78. DOI: 10.1108/09576050110363239 |
0.305 |
|
2001 |
Cheng EWL, Li H, Drew DS, Yeung N. Infrastructure of Partnering for Construction Projects Journal of Management in Engineering. 17: 229-237. DOI: 10.1061/(Asce)0742-597X(2001)17:4(229) |
0.327 |
|
2001 |
Deng ZM, Li H, Tam CM, Shen QP, Love PED. An application of the Internet-based project management system Automation in Construction. 10: 239-246. DOI: 10.1016/S0926-5805(99)00037-0 |
0.332 |
|
2001 |
Li H, Cheng EWL, Love PED, Irani Z. Co-operative benchmarking: a tool for partnering excellence in construction International Journal of Project Management. 19: 171-179. DOI: 10.1016/S0263-7863(99)00033-2 |
0.32 |
|
2000 |
Li H, Love PED, Drew DS. Effects of overtime work and additional resources on project cost and quality Engineering, Construction and Architectural Management. 7: 211-220. DOI: 10.1108/Eb021146 |
0.331 |
|
2000 |
Li H, Cheng EWL, Love PED. Partnering research in construction Engineering, Construction and Architectural Management. 7: 76-92. DOI: 10.1108/Eb021134 |
0.34 |
|
2000 |
Love PED, Li H. Quantifying the causes and costs of rework in construction Construction Management and Economics. 18: 479-490. DOI: 10.1080/01446190050024897 |
0.309 |
|
2000 |
Cheng EWL, Li H, Love PED. Establishment of Critical Success Factors for Construction Partnering Journal of Management in Engineering. 16: 84-92. DOI: 10.1061/(Asce)0742-597X(2000)16:2(84) |
0.324 |
|
2000 |
Chen Z, Li H, Wong CTC. Environmental management of urban construction projects in China Journal of Construction Engineering and Management-Asce. 126: 320-324. DOI: 10.1061/(Asce)0733-9364(2000)126:4(320) |
0.342 |
|
1999 |
Love PED, Smith J, Li H. The propagation of rework benchmark metrics for construction International Journal of Quality & Reliability Management. 16: 638-658. DOI: 10.1108/02656719910249829 |
0.35 |
|
1999 |
Faniran OO, Love PED, Li H. Optimal allocation of construction planning resources Journal of Construction Engineering and Management-Asce. 125: 311-319. DOI: 10.1061/(Asce)0733-9364(1999)125:5(311) |
0.316 |
|
1999 |
Li H, Scott D, Love PED. Narrowing the expectation gap of construction information technologies between academic preparation and industrial needs Computer Applications in Engineering Education. 7: 244-251. DOI: 10.1002/(Sici)1099-0542(1999)7:4<244::Aid-Cae6>3.0.Co;2-X |
0.304 |
|
1998 |
Love PED, Li H. From BPR to CPR ‐ conceptualising re‐engineering in construction Business Process Management Journal. 4: 291-305. DOI: 10.1108/14637159810238192 |
0.35 |
|
1998 |
Li H. Petri net as a formalism to assist process improvement in the construction industry Automation in Construction. 7: 349-356. DOI: 10.1016/S0926-5805(98)00051-X |
0.333 |
|
1998 |
Love PED, Gunasekaran A, Li H. Concurrent engineering : a strategy for procuring construction projects International Journal of Project Management. 16: 375-383. DOI: 10.1016/S0263-7863(97)00066-5 |
0.347 |
|
1997 |
Li H. Determinants of knowledge-based expert system success in construction engineering : Analysis and identification of five factors that largely determine the success or failure of a KBES project for construction problem-solving tasks Building Research and Information. 25: 101-106. DOI: 10.1080/096132197370480 |
0.308 |
|
1996 |
Li H. Towards quantitatively measuring the performance of construction IT systems: Identifies need to establish a quantitative method to measure performance of construction IT systems and indentifies measurement indicators Building Research and Information. 24: 379-382. DOI: 10.1080/09613219608727560 |
0.303 |
|
1995 |
Li H. A new connectionist approach to implementing knowledge-based construction performance management systems — conceptual design: Explores how connectionist models can be adapted to model important aspects of construction diagnostic processes Building Research &Amp; Information. 23: 156-161. DOI: 10.1080/09613219508727449 |
0.304 |
|
Show low-probability matches. |