Eul B. Lee, Ph.D. - Publications

Affiliations: 
2000 University of California, Berkeley, Berkeley, CA, United States 
Area:
Civil Engineering

49 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Lee EB, Alleman D, Thamas D, Kim C. Integrating Ca4Prs V.3 Road Widening Schedule Module Into Us Highway Early Constructability Process: California Sr-91 Corridor Improvement Program Case Study Transport. 35: 1-19. DOI: 10.3846/Transport.2019.11650  0.32
2020 Alleman D, Lee E. Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects Engineering, Construction and Architectural Management. DOI: 10.1108/Ecam-04-2019-0188  0.38
2020 Ahn J, Ji S, Ahn SJ, Park M, Lee H, Kwon N, Lee E, Kim Y. Performance evaluation of normalization-based CBR models for improving construction cost estimation Automation in Construction. 119: 103329. DOI: 10.1016/J.Autcon.2020.103329  0.384
2019 Yi D, Lee EB, Ahn J. Onshore Oil and Gas Design Schedule Management Process Through Time-Impact Simulations Analyses Sustainability. 11: 1613. DOI: 10.3390/Su11061613  0.406
2019 Kim M, Lee E, Choi H. A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects Sustainability. 11: 1256. DOI: 10.3390/Su11051256  0.401
2019 Kim M, Lee E. A Forecast Model for the Level of Engineering Maturity Impact on Contractor’s Procurement and Construction Costs for Offshore EPC Megaprojects Energies. 12: 2295. DOI: 10.3390/En12122295  0.416
2019 Son B, Lee EB. Using Text Mining to Estimate Schedule Delay Risk of 13 Offshore Oil and Gas EPC Case Studies During the Bidding Process Energies. 12: 1-25. DOI: 10.3390/En12101956  0.437
2019 Kim D, Lee EB, Jung I, Alleman D. The Efficacy of the Tolling Model’s Ability to Improve Project Profitability on International Steel Plants Energies. 12: 1221. DOI: 10.3390/En12071221  0.416
2019 Le C, Le T, Jeong HD, Lee EB. Geographic Information System–Based Framework for Estimating and Visualizing Unit Prices of Highway Work Items Journal of Construction Engineering and Management-Asce. 145: 4019044. DOI: 10.1061/(Asce)Co.1943-7862.0001672  0.386
2019 Lee CJ, Won J, Lee EB. Method for Predicting Raw Material Prices for Product Production over Long Periods Journal of Construction Engineering and Management-Asce. 145: 5018017. DOI: 10.1061/(Asce)Co.1943-7862.0001586  0.37
2018 Lee C, Lee C, Lee EB. A Method For Analyzing The Effect Of Implementing An Enterprise System Based On The Complexity Of Activities Journal of Civil Engineering and Management. 24: 526-536. DOI: 10.3846/Jcem.2018.6130  0.365
2018 Lee C, Lee C, Lee E. Analysis of the causes and level of maintenance for enterprise systems in construction companies Journal of Civil Engineering and Management. 24: 499-507. DOI: 10.3846/Jcem.2018.5635  0.368
2018 Minsung K, Jung I, Alleman D, Lee EB. Risk Assessment and Mitigation Model for Overseas Steel-Plant Project Investment with Analytic Hierarchy Process—Fuzzy Inference System Sustainability. 10: 4780. DOI: 10.3390/Su10124780  0.353
2018 Lee EB, Kim M, Choi HS. Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractors' Schedule-Cost Performance for Offshore Oil and Gas EPC Projects Sustainability. 10: 2469. DOI: 10.3390/Su10072469  0.387
2018 Jo S, Lee E, Pyo K. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM): A Case-Study on Oil and Gas Projects, the Piping Process Sustainability. 10: 1817. DOI: 10.3390/Su10061817  0.435
2018 Yoo J, Lee E, Choi J. Balancing Project Financing and Mezzanine Project Financing with Option Value to Mitigate Sponsor’s Risks for Overseas Investment Projects Sustainability. 10: 1498. DOI: 10.3390/Su10051498  0.429
2018 Kim Y, Lee E. A Probabilistic Alternative Approach to Optimal Project Profitability Based on the Value-at-Risk Sustainability. 10: 747. DOI: 10.3390/Su10030747  0.342
2018 Lee E, Alleman D. Ensuring Efficient Incentive and Disincentive Values for Highway Construction Projects: A Systematic Approach Balancing Road User, Agency and Contractor Acceleration Costs and Savings Sustainability. 10: 701. DOI: 10.3390/Su10030701  0.409
2018 Lee E, Thomas DK, Alleman D. Incorporating Road User Costs into Integrated Life-Cycle Cost Analyses for Infrastructure Sustainability: A Case Study on Sr-91 Corridor Improvement Project (Ca) Sustainability. 10: 179. DOI: 10.3390/Su10010179  0.45
2018 Lee H, Lee EB, Alleman D. Schedule Modeling to Estimate Typical Construction Durations and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants Energies. 11: 2850. DOI: 10.3390/En11102850  0.339
2018 Ji S, Ahn J, Lee EB, Kim Y. Learning method for knowledge retention in CBR cost models Automation in Construction. 96: 65-74. DOI: 10.1016/J.Autcon.2018.08.019  0.349
2018 Kim Y, Lee E. Optimal Investment Timing with Investment Propensity Using Fuzzy Real Options Valuation International Journal of Fuzzy Systems. 20: 1888-1900. DOI: 10.1007/S40815-018-0493-4  0.353
2017 Kim Y, Shin K, Ahn J, Lee E. Probabilistic Cash Flow-Based Optimal Investment Timing Using Two-Color Rainbow Options Valuation for Economic Sustainability Appraisement Sustainability. 9: 1781. DOI: 10.3390/Su9101781  0.45
2017 Lee C, Lee E. Prediction method of real discount rate to improve accuracy of life-cycle cost analysis Energy and Buildings. 135: 225-232. DOI: 10.1016/J.Enbuild.2016.11.020  0.342
2015 Kim C, Lee E, Harvey JT, Fong A, Lott R. Automated Sequence Selection and Cost Calculation for Maintenance and Rehabilitation in Highway Life-Cycle Cost Analysis (LCCA) International Journal of Transportation Science and Technology. 4: 61-75. DOI: 10.1260/2046-0430.4.1.61  0.453
2013 Jackson EJ, Sanquist T, Campbell J, Lee EB, Van Dongen HPA. Fatigue in highway construction workers Transportation Research Record. 11-18. DOI: 10.3141/2347-02  0.333
2012 Wang T, Lee IS, Kendall A, Harvey J, Lee EB, Kim C. Life cycle energy consumption and GHG emission from pavement rehabilitation with different rolling resistance Journal of Cleaner Production. 33: 86-96. DOI: 10.1016/J.Jclepro.2012.05.001  0.361
2011 Lee E, Kim C, Ghafari N, Brink G. Value Analysis Using Performance Attributes Matrix for Highway Rehabilitation Projects: California Interstate 80 Sacramento Case Transportation Research Record. 2228: 34-43. DOI: 10.3141/2228-05  0.462
2011 Lee EB, Kim C, Harvey J. Selection of pavement for highway rehabilitation based on life-cycle cost analysis Transportation Research Record. 23-32. DOI: 10.3141/2227-03  0.477
2009 Choi K, Lee EB, Ibbs CW, Kim YW. Multifaceted public outreach and cost-benefit analysis for its effectiveness validation Construction Management and Economics. 27: 771-782. DOI: 10.1080/01446190903096591  0.692
2008 Lee EB, Choi K, Lim S. Streamlined strategies for faster, less traffic-disruptive highway rehabilitation in urban networks Transportation Research Record. 38-45. DOI: 10.3141/2081-04  0.53
2007 Lee EB, Thomas DK. State-of-practice technologies on accelerated urban highway rehabilitation: I-15 California experience Journal of Construction Engineering and Management. 133: 105-113. DOI: 10.1061/(Asce)0733-9364(2007)133:2(105)  0.493
2007 Lee EB, Lee H, Ibbs CW. Productivity aspects of urban freeway rehabilitation with accelerated construction Journal of Construction Engineering and Management. 133: 798-806. DOI: 10.1061/(Asce)0733-9364(2007)133:10(798)  0.692
2007 Lee EB, Thomas DK. Accelerated reconstruction of I-15 devore corridor Public Roads. 70.  0.403
2006 Lee E, Choi K. Part 1: Pavement Rehabilitation: Fast-Track Construction for Concrete Pavement Rehabilitation: California Urban Highway Network Transportation Research Record. 1949: 3-10. DOI: 10.3141/1949-01  0.504
2006 Lee EB, Kim C. Automated work zone information system on Urban freeway rehabilitation: California implementation Transportation Research Record. 77-85. DOI: 10.3141/1948-09  0.45
2006 Lee EB, Choi K. Fast-track construction for concrete pavement rehabilitation: California urban highway network Transportation Research Record. 3-10. DOI: 10.1177/0361198106194900101  0.541
2006 Lee E, Kim C, Harvey JT. Implementation of Automated Travel-Time Information and Public Reaction on Urban Highway Rehabilitation Journal of Transportation Engineering-Asce. 132: 808-816. DOI: 10.1061/(Asce)0733-947X(2006)132:10(808)  0.458
2006 Lee EB, Lee H, Harvey JT. Fast-track urban freeway rehabilitation with 55-H weekend closures: I-710 long beach case study Journal of Construction Engineering and Management. 132: 465-472. DOI: 10.1061/(Asce)0733-9364(2006)132:5(465)  0.522
2005 Lee EB, Harvey JT, Samadian MM. Knowledge-based scheduling analysis software for highway rehabilitation and reconstruction projects Transportation Research Record. 15-24. DOI: 10.3141/1907-03  0.539
2005 Lee EB, Lee H, Akbarian M. Accelerated pavement rehabilitation and reconstruction with Long-Life asphalt concrete on high-traffic Urban highways Transportation Research Record. 56-64. DOI: 10.3141/1905-07  0.517
2005 Lee EB, Ibbs CW, Thomas D. Minimizing total cost for urban freeway reconstruction with integrated construction/traffic analysis Journal of Infrastructure Systems. 11: 250-257. DOI: 10.1061/(Asce)1076-0342(2005)11:4(250)  0.71
2005 Lee EB, Thomas D, Bloomberg L. Planning urban highway reconstruction with traffic demand affected by construction schedule Journal of Transportation Engineering. 131: 752-761. DOI: 10.1061/(Asce)0733-947X(2005)131:10(752)  0.519
2005 Lee EB, Ibbs CW. Computer simulation model: Construction analysis for pavement rehabilitation strategies Journal of Construction Engineering and Management. 131: 449-458. DOI: 10.1061/(Asce)0733-9364(2005)131:4(449)  0.721
2005 Lee E, Harvey JT, Thomas D. Integrated Design/Construction/Operations Analysis for Fast-track Urban Freeway Reconstruction Journal of Construction Engineering and Management-Asce. 131: 1283-1291. DOI: 10.1061/(Asce)0733-9364(2005)131:12(1283)  0.514
2002 Lee EB, Harvey JT, Ibbs CW, St. Martin J. Construction productivity analysis for asphalt concrete pavement rehabilitation in urban corridors Transportation Research Record. 285-294. DOI: 10.3141/1813-34  0.682
2002 Lee EB, Roesler J, Harvey JT, Ibbs CW. Case study of urban concrete pavement reconstruction on interstate 10 Journal of Construction Engineering and Management. 128: 49-56. DOI: 10.1061/(Asce)0733-9364(2002)128:1(49)  0.697
2001 Timm DH, Voller VR, Lee E, Harvey J. Calcool: A multi-layer Asphalt Pavement Cooling Tool for Temperature Prediction During Construction International Journal of Pavement Engineering. 2: 169-185. DOI: 10.1080/10298430108901725  0.368
2000 Lee EB, Ibbs CW, Harvey JT, Roesler JR. Construction productivity and constraints for concrete pavement rehabilitation in urban corridors Transportation Research Record. 13-24. DOI: 10.3141/1712-02  0.68
Show low-probability matches.