Year |
Citation |
Score |
2016 |
Ioannou PG, Yang IT. Repetitive Scheduling Method: Requirements, Modeling, and Implementation Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0001107 |
0.679 |
|
2014 |
Likhitruangsilp V, Ioannou PG, Leeladejkul S. Mapping work process and information exchange of construction entities for BIM implementation: Case study of an academic institute Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference On Computing in Civil and Building Engineering. 2224-2231. DOI: 10.1061/9780784413616.276 |
0.777 |
|
2012 |
Likhitruangsilp V, Putthividhya W, Ioannou PG. Conceptual framework of the Green Building Information Management System Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 658-667. DOI: 10.1061/9780784412329.067 |
0.758 |
|
2012 |
Likhitruangsilp V, Ioannou PG. Analysis of risk-response measures for tunneling projects Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 258-267. DOI: 10.1061/9780784412329.027 |
0.743 |
|
2010 |
Ioannou PG, Awwad RE. Below-average bidding method Journal of Construction Engineering and Management. 136: 936-946. DOI: 10.1061/(Asce)Co.1943-7862.0000202 |
0.747 |
|
2009 |
Awwad RE, Ioannou PG. Study of less than average bid method Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress. 249-258. DOI: 10.1061/41020(339)26 |
0.738 |
|
2009 |
Likhitruangsilp V, Ioannou PG. Risk allocation in standard forms of general conditions for tunneling contracts Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress. 1250-1259. DOI: 10.1061/41020(339)127 |
0.743 |
|
2008 |
Srisuwanrat C, Ioannou PG, Tsimhoni O. Simulation and optimization for construction repetitive projects using promodel and simrunner Proceedings - Winter Simulation Conference. 2402-2412. DOI: 10.1109/WSC.2008.4736348 |
0.797 |
|
2007 |
Khoury HM, Kamat VR, Ioannou PG. Evaluation of general-purpose construction simulation and visualization tools for modeling and animating airside airport operations Simulation. 83: 663-679. DOI: 10.1177/0037549707086038 |
0.572 |
|
2007 |
Srisuwanrat C, Ioannou PG. Optimal scheduling of probabilistic repetitive projects using completed unit and genetic algorithms Proceedings - Winter Simulation Conference. 2151-2158. DOI: 10.1109/WSC.2007.4419849 |
0.797 |
|
2007 |
Ioannou PG, Srisuwanrat C. Optimal work breaks in deterministic and probabilistic repetitive projects Proceedings - Winter Simulation Conference. 2141-2150. DOI: 10.1109/WSC.2007.4419848 |
0.811 |
|
2007 |
Srisuwanrat C, Ioannou PG. The investigation of lead-time buffering under uncertainty using simulation and cost optimization Lean Construction: a New Paradigm For Managing Capital Projects - 15th Iglc Conference. 580-589. |
0.767 |
|
2007 |
Ioannou PG, Srisuwanrat C. Probabilistic scheduling for repetitive projects Lean Construction: a New Paradigm For Managing Capital Projects - 15th Iglc Conference. 498-507. |
0.801 |
|
2006 |
Khoury HM, Kamat VR, Ioannou PG. Simulation and visualization of air-side operations at Detroit Metropolitan Airport Proceedings - Winter Simulation Conference. 2029-2038. DOI: 10.1109/WSC.2006.322990 |
0.587 |
|
2006 |
Ioannou PG, Srisuwanrat C. Sequence step algorithm for continuous resource utilization in probabilistic repetitive projects Proceedings - Winter Simulation Conference. 1731-1740. DOI: 10.1109/WSC.2006.322949 |
0.795 |
|
2005 |
Ioannou PG, Kamat VR. Intelligent preemption in construction of a manmade island for an airport Proceedings - Winter Simulation Conference. 2005: 1515-1523. DOI: 10.1109/WSC.2005.1574419 |
0.626 |
|
2005 |
Ioannou PG, Likhitruangsilp V. Simulation of multiple-drift tunnel construction with limited resources Proceedings - Winter Simulation Conference. 2005: 1483-1491. DOI: 10.1109/WSC.2005.1574415 |
0.773 |
|
2005 |
Likhitruangsilp V, Ioannou PG. Economic assessment of site exploration programs using stochastic dynamic programming Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress. 577-586. |
0.729 |
|
2004 |
Yang IT, Ioannou PG. Scheduling system with focus on practical concerns in repetitive projects Construction Management and Economics. 22: 619-630. DOI: 10.1080/01446190310001649065 |
0.697 |
|
2004 |
Likhitruangsilp V, Ioannou PG. Risk-sensitive decision support system for tunnel construction Geotechnical Special Publication. 1508-1515. DOI: 10.1061/40744(154)142 |
0.775 |
|
2003 |
Ioannou PG, Harris RB, Yang IT, Ammar MA, Elbeltagi E. Discussion of "algorithm for determining controlling path considering resource continuity" by Mohammed A. Ammar and Emad Elbeltagi Journal of Computing in Civil Engineering. 17: 68-73. DOI: 10.1061/(Asce)0887-3801(2003)17:1(68) |
0.55 |
|
2003 |
Likhitruangsilp V, Ioannou PG. Stochastic Evaluation of Tunneling Performance Using Discrete-Event Simulation Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress. 933-940. |
0.774 |
|
2001 |
Martinez JC, Trani AA, Ioannou PG. Modeling airside airport operations using general-purpose, activity-based, discrete-event simulation tools Transportation Research Record. 65-71. DOI: 10.3141/1744-08 |
0.697 |
|
1999 |
Martinez JC, Ioannou PG. General-purpose systems for effective construction simulation Journal of Construction Engineering and Management. 125: 265-276. DOI: 10.1061/(Asce)0733-9364(1999)125:4(265) |
0.703 |
|
1998 |
Harris RB, Ioannou PG. Scheduling projects with repeating activities Journal of Construction Engineering and Management. 124: 269-278. DOI: 10.1061/(Asce)0733-9364(1998)124:4(269) |
0.434 |
|
1996 |
Ioannou PG, Martinez JC. Comparison of construction alternatives using matched simulation experiments Journal of Construction Engineering and Management. 122: 231-241. DOI: 10.1061/(Asce)0733-9364(1996)122:3(231) |
0.73 |
|
1996 |
Dias A, Ioannou PG. Company and project evaluation model for privately promoted infrastructure projects Journal of Construction Engineering and Management. 122: 71-82. DOI: 10.1061/(Asce)0733-9364(1996)122:1(71) |
0.47 |
|
1996 |
Ioannou PG, Martinez JC. Simulation of complex construction processes Winter Simulation Conference Proceedings. 1321-1328. |
0.318 |
|
1995 |
Dias A, Ioannou PG. Debt capacity and optimal capital structure for privately financed infrastructure projects Journal of Construction Engineering and Management. 121: 404-414. DOI: 10.1061/(Asce)0733-9364(1995)121:4(404) |
0.461 |
|
1994 |
Ioannou PG. Average-bid method—competitive bidding strategy Journal of Construction Engineering and Management. 120: 460-463. DOI: 10.1061/(Asce)0733-9364(1993)119:1(131) |
0.36 |
|
1989 |
Ioannou PG. Evaluation of subsurface exploration programs Journal of Construction Engineering and Management. 115: 339-356. DOI: 10.1061/(Asce)0733-9364(1989)115:3(339) |
0.357 |
|
1989 |
Ioannou PG. Dynamic probabilistic decision processes Journal of Construction Engineering and Management. 115: 237-257. DOI: 10.1061/(Asce)0733-9364(1989)115:2(237) |
0.336 |
|
1988 |
Ioannou PG. Pilot tunnels: Contractor’s position Journal of Construction Engineering and Management. 114: 594-613. DOI: 10.1061/(Asce)0733-9364(1988)114:4(594) |
0.49 |
|
1988 |
Ioannou PG. Geologic exploration and risk reduction in underground construction Journal of Construction Engineering and Management. 114: 532-547. DOI: 10.1061/(Asce)0733-9364(1988)114:4(532) |
0.469 |
|
1988 |
Ioannou PG, Carr RI. Advanced building technology matrix system Journal of Construction Engineering and Management. 114: 517-531. DOI: 10.1061/(Asce)0733-9364(1988)114:4(517) |
0.321 |
|
1988 |
Ioannou PG. Bidding models—symmetry and state of information Journal of Construction Engineering and Management. 114: 214-232. DOI: 10.1061/(Asce)0733-9364(1988)114:2(214) |
0.301 |
|
1987 |
Ioannou PG. Geologic prediction model for tunneling Journal of Construction Engineering and Management. 113: 569-590. DOI: 10.1061/(Asce)0733-9364(1987)113:4(569) |
0.38 |
|
Show low-probability matches. |