Year |
Citation |
Score |
2021 |
AlOmani A, El-Rayes K, Altuwaim A. Optimizing the use of acoustic materials in office buildings. Scientific Reports. 11: 20652. PMID 34667182 DOI: 10.1038/s41598-021-00082-3 |
0.36 |
|
2020 |
AlOmani A, El-Rayes K. Automated generation of optimal thematic architectural layouts using image processing Automation in Construction. 117: 103255. DOI: 10.1016/J.Autcon.2020.103255 |
0.394 |
|
2019 |
Perez-Perez Y, Golparvar-Fard M, El-Rayes K. Artificial Neural Network for Semantic Segmentation of Built Environments for Automated Scan2BIM Computing in Civil Engineering. 97-104. DOI: 10.1061/9780784482438.013 |
0.599 |
|
2018 |
Abdallah M, Akyeampong B, El-Rayes K. Maximizing sustainability of existing buildings within limited upgrade budgets Canadian Journal of Civil Engineering. 45: 705-716. DOI: 10.1139/Cjce-2017-0346 |
0.479 |
|
2018 |
Halabya A, El-Rayes K. Automated Compliance Analysis of Pedestrian Facilities with Accessibility Requirements Canadian Journal of Civil Engineering. 45: 366-376. DOI: 10.1139/Cjce-2016-0598 |
0.431 |
|
2018 |
Abdelmohsen AZ, El-Rayes K. Optimizing the Planning of Highway Work Zones to Maximize Safety and Mobility Journal of Management in Engineering. 34: 4017048. DOI: 10.1061/(Asce)Me.1943-5479.0000570 |
0.439 |
|
2018 |
Schuldt S, El-Rayes K. Optimizing the Planning of Remote Construction Sites to Minimize Facility Destruction from Explosive Attacks Journal of Construction Engineering and Management-Asce. 144: 4018020. DOI: 10.1061/(Asce)Co.1943-7862.0001446 |
0.447 |
|
2018 |
Altuwaim A, El-Rayes K. Minimizing duration and crew work interruptions of repetitive construction projects Automation in Construction. 88: 59-72. DOI: 10.1016/J.Autcon.2017.12.024 |
0.424 |
|
2017 |
Schuldt S, El-Rayes K. Quantifying Blast Effects on Constructed Facilities behind Blast Walls Journal of Performance of Constructed Facilities. 31: 4017027. DOI: 10.1061/(Asce)Cf.1943-5509.0001015 |
0.322 |
|
2016 |
Abdallah MA, El-Rayes K, Liu LY. Optimizing the selection of sustainability measures to minimize life-cycle cost of existing buildings Canadian Journal of Civil Engineering. 43: 151-163. DOI: 10.1139/Cjce-2015-0179 |
0.485 |
|
2016 |
Abdallah M, El-Rayes K. Multiobjective Optimization Model for Maximizing Sustainability of Existing Buildings Journal of Management in Engineering. 32: 4016003. DOI: 10.1061/(Asce)Me.1943-5479.0000425 |
0.425 |
|
2016 |
Abdallah M, El-Rayes K, Liu L. Minimizing upgrade cost to achieve LEED certification for existing buildings Journal of Construction Engineering and Management-Asce. 142: 4015073. DOI: 10.1061/(Asce)Co.1943-7862.0001053 |
0.473 |
|
2016 |
Grussing MN, Liu LY, Uzarski DR, El-Rayes K, El-Gohary N. Discrete Markov Approach for Building Component Condition, Reliability, and Service-Life Prediction Modeling Journal of Performance of Constructed Facilities. 30: 4016015-4016015. DOI: 10.1061/(Asce)Cf.1943-5509.0000865 |
0.322 |
|
2016 |
Karatas A, El-Rayes K. Optimal Trade-Offs between Housing Cost and Environmental Performance Journal of Architectural Engineering. 22: 4015018. DOI: 10.1061/(Asce)Ae.1943-5568.0000199 |
0.477 |
|
2015 |
Karatas A, El-Rayes K. Evaluating the performance of sustainable development in urban neighborhoods based on the feedback of multiple stakeholders Sustainable Cities and Society. 14: 374-382. DOI: 10.1016/J.Scs.2014.05.011 |
0.402 |
|
2015 |
Abdallah M, El-Rayes K. Optimizing the selection of building upgrade measures to minimize the operational negative environmental impacts of existing buildings Building and Environment. 84: 32-43. DOI: 10.1016/J.Buildenv.2014.10.010 |
0.497 |
|
2013 |
Abdallah M, El-Rayes K, Liu L. Operational Performance of Sustainable Measures in Public Buildings Journal of Construction Engineering and Management-Asce. 139. DOI: 10.1061/(Asce)Co.1943-7862.0000770 |
0.343 |
|
2013 |
Said H, El-Rayes K. Optimal utilization of interior building spaces for material procurement and storage in congested construction sites Automation in Construction. 31: 292-306. DOI: 10.1016/J.Autcon.2012.12.010 |
0.493 |
|
2011 |
Jun DH, El-Rayes K. Multiobjective optimization of resource leveling and allocation during construction scheduling Journal of Construction Engineering and Management-Asce. 137: 1080-1088. DOI: 10.1061/(Asce)Co.1943-7862.0000368 |
0.76 |
|
2010 |
El-Anwar O, El-Rayes K, Elnashai A. Minimization of socioeconomic disruption for displaced populations following disasters. Disasters. 34: 865-83. PMID 20345460 DOI: 10.1111/J.1467-7717.2010.01173.X |
0.633 |
|
2010 |
Pea-Mora F, Chen AY, Aziz Z, Soibelman L, Liu LY, El-Rayes K, Arboleda CA, Lantz TS, Plans AP, Lakhera S, Mathur S. Mobile ad hoc network-enabled collaboration framework supporting civil engineering emergency response operations Journal of Computing in Civil Engineering. 24: 302-312. DOI: 10.1061/(Asce)Cp.1943-5487.0000033 |
0.608 |
|
2010 |
Said H, El-Rayes K. Optimizing the planning of construction site security for critical infrastructure projects Automation in Construction. 19: 221-234. DOI: 10.1016/J.Autcon.2009.10.005 |
0.485 |
|
2009 |
Orabi W, El-Rayes K, Senouci AB, Al-Derham H. Optimizing Postdisaster Reconstruction Planning for Damaged Transportation Networks Journal of Construction Engineering and Management-Asce. 135: 1039-1048. DOI: 10.1061/(Asce)Co.1943-7862.0000070 |
0.728 |
|
2009 |
Senouci A, El-Rayes K. Time-Profit Trade-Off Analysis for Construction Projects Journal of Construction Engineering and Management-Asce. 135: 718-725. DOI: 10.1061/(Asce)Co.1943-7862.0000031 |
0.526 |
|
2009 |
El-Anwar O, El-Rayes K, Elnashai A. An automated system for optimizing post-disaster temporary housing allocation Automation in Construction. 18: 983-993. DOI: 10.1016/J.Autcon.2009.05.003 |
0.661 |
|
2008 |
EL-Anwar O, EL-Rayes K, Elnashai A. Multi-Objective Optimization of Temporary Housing for the 1994 Northridge Earthquake Journal of Earthquake Engineering. 12: 81-91. DOI: 10.1080/13632460802013602 |
0.624 |
|
2006 |
Khalafallah A, El-Rayes K. Optimizing airport construction site layouts to minimize wildlife hazards Journal of Management in Engineering. 22: 176-185. DOI: 10.1061/(Asce)0742-597X(2006)22:4(176) |
0.761 |
|
2006 |
Kandil A, El-Rayes K. MACROS: Multiobjective automated construction resource optimization system Journal of Management in Engineering. 22: 126-134. DOI: 10.1061/(Asce)0742-597X(2006)22:3(126) |
0.709 |
|
2006 |
Kandil A, El-Rayes K. Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects Journal of Construction Engineering and Management. 132: 491-498. DOI: 10.1061/(Asce)0733-9364(2006)132:5(491) |
0.628 |
|
2005 |
El-Rayes K, Kandil A. Time-cost-quality trade-off analysis for highway construction Journal of Construction Engineering and Management. 131: 477-486. DOI: 10.1061/(Asce)0733-9364(2005)131:4(477) |
0.688 |
|
2005 |
El-Rayes K, Hyari K. CONLIGHT: Lighting Design Model for Nighttime Highway Construction Journal of Construction Engineering and Management-Asce. 131: 467-476. DOI: 10.1061/(Asce)0733-9364(2005)131:4(467) |
0.432 |
|
2005 |
El-Rayes K, Hyari K. Optimal Lighting Arrangements for Nighttime Highway Construction Projects Journal of Construction Engineering and Management-Asce. 131: 1292-1300. DOI: 10.1061/(Asce)0733-9364(2005)131:12(1292) |
0.458 |
|
2005 |
El-Rayes K, Khalafallah A. Trade-off between Safety and Cost in Planning Construction Site Layouts Journal of Construction Engineering and Management-Asce. 131: 1186-1195. DOI: 10.1061/(Asce)0733-9364(2005)131:11(1186) |
0.765 |
|
2001 |
El-Rayes K. Object-Oriented Model for Repetitive Construction Scheduling Journal of Construction Engineering and Management-Asce. 127: 199-205. DOI: 10.1061/(Asce)0733-9364(2001)127:3(199) |
0.529 |
|
2001 |
El-Rayes K, Moselhi O. Impact of Rainfall on the Productivity of Highway Construction Journal of Construction Engineering and Management-Asce. 127: 125-131. DOI: 10.1061/(Asce)0733-9364(2001)127:2(125) |
0.413 |
|
2001 |
El-Rayes K, Moselhi O. Optimizing Resource Utilization for Repetitive Construction Projects Journal of Construction Engineering and Management-Asce. 127: 18-27. DOI: 10.1061/(Asce)0733-9364(2001)127:1(18) |
0.71 |
|
1997 |
Moselhi O, Gong D, El-Rayes K. Estimating weather impact on the duration of construction activities Canadian Journal of Civil Engineering. 24: 359-366. DOI: 10.1139/L96-122 |
0.371 |
|
Show low-probability matches. |