Junfang Yu
Affiliations: | Engineering Management, Information and Systems | Southern Methodist University, Dallas, TX, United States |
Area:
General EngineeringGoogle:
"Junfang Yu"
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Volkert R, Stracener J, Yu J. (2014) Incorporating a Measure of Uncertainty into Systems of Systems Development Performance Measures Systems Engineering. 17: 297-312 |
Yu J, Hoff R. (2013) Optimal Routing and Assignment of Consultants for Energy Education, Inc. Interfaces. 43: 142-151 |
Yu J, Dong Y. (2013) Maximizing profit for vehicle routing under time and weight constraints International Journal of Production Economics. 145: 573-583 |
Bijan Y, Yu J, Stracener J, et al. (2013) Systems requirements engineering - State of the methodology Systems Engineering. 16: 267-276 |
Mungan D, Yu J, Sarker BR, et al. (2012) A Pareto-Optimal Solution for a Multi-Objective Scheduling Problem with Periodic Maintenance Requirement International Journal of Operations Research and Information Systems. 3: 24-45 |
Volkert R, Stracener JT, Yu J. (2012) A framework for performance prediction during development of systems of systems International Journal of System of Systems Engineering. 3: 76-95 |
Yu J, Sarker BR, Duan Q, et al. (2012) Single-manufacturer, multi-retailer consignment policy for retailers generalized demand distributions Journal of the Operational Research Society. 63: 1708-1719 |
Sarker BR, Egbelu PJ, Liao TW, et al. (2012) Planning and design models for construction industry: A critical survey Automation in Construction. 22: 123-134 |
Yu J, Mungan D, Sarker BR. (2011) An integrated multi-stage supply chain inventory model under an infinite planning horizon and continuous price decrease Computers and Industrial Engineering. 61: 118-130 |
Mungan D, Yu J, Sarker BR. (2010) Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon International Journal of Production Research. 48: 3619-3636 |