Adel Francis, Ph.D.

Affiliations: 
2004 Ecole de Technologie Superieure (Canada) 
Area:
Civil Engineering
Google:
"Adel Francis"

Parents

Sign in to add mentor
Edmond T. Miresco grad student 2004 Ecole de Technologie Superieure (Canada)
 (La modelisation chronographique de la planification des projets de construction.)
BETA: Related publications

Publications

You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect.

Ardila F, Francis A. (2020) Spatiotemporal Planning of Construction Projects: A Literature Review and Assessment of the State of the Art Frontiers in Built Environment. 6
Francis A. (2020) Chronographical Site-Spatial-Temporal Modeling of Construction Operations Frontiers in Built Environment. 6
Mazars T, Francis A. (2020) Chronographical spatiotemporal dynamic 4D planning Automation in Construction. 112: 103076
Francis A. (2019) Chronographical spatiotemporal scheduling optimization for building projects Frontiers in Built Environment. 5
Francis A. (2017) Simulating Uncertainties in Construction Projects with Chronographical Scheduling Logic Journal of Construction Engineering and Management-Asce. 143: 4016085
Francis A, Morin-Pepin S. (2017) The concept of float calculation based on the site occupation using the chronographical logic Procedia Engineering. 196: 690-697
Francis A. (2016) Comparing Time and Quantity Scales for Relationship and Float Calculations Procedia Engineering. 164: 49-56
Francis A. (2015) Graphical Modelling Classification for Construction Project Scheduling Procedia Engineering. 123: 162-168
Francis A. (2013) The chronographical approach for construction project modelling Proceedings of Institution of Civil Engineers: Management, Procurement and Law. 166: 188-204
Francis A, Miresco E. (2012) Discussion of “Critical Path Segments Scheduling Technique” by Tarek Hegazy and Wail Menesi Journal of Construction Engineering and Management-Asce. 138: 786-787
See more...