Salah E. Elmaghraby
Affiliations: | North Carolina State University, Raleigh, NC |
Area:
Industrial EngineeringWebsite:
https://www.ise.ncsu.edu/blog/2016/07/11/dr-salah-elmaghraby-1927-2016/Google:
"Salah Eldin Abdel-Fattah Elmaghraby" OR "Salah E Elmaghraby"Bio:
(1927 - 2016)
https://www.informs.org/Explore/History-of-O.R.-Excellence/Biographical-Profiles/Elmaghraby-Salah-E
https://d.lib.ncsu.edu/collections/names/1807-elmaghraby-salah-eldin-1927
https://books.google.com/books?id=d01UAAAAYAAJ
https://books.google.com/books?id=rPMOAAAAIAAJ
Parents
Sign in to add mentorAndrew S. Schultz | grad student | 1958 | Cornell (Business Management Tree) | |
Lionel Weiss | grad student | 1958 | Cornell (Computer Science Tree) | |
(Programming under uncertainty) |
Children
Sign in to add traineeFuad Akil Rihani | grad student | 1974 | NCSU |
Leon F. McGinnis | grad student | 1975 | NCSU |
Subhash C. Sarin | grad student | 1978 | NCSU |
Razek E. Karnoub | grad student | 2002 | NCSU |
Girish A. Ramachandra | grad student | 2006 | NCSU |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Elmaghraby SE, Ramachandra G. (2014) Optimal resource allocation in activity networks - stochastic environment International Journal of Project Organisation and Management. 6: 67-95 |
Zhang J, Elmaghraby SE. (2014) The relevance of the “alphorn of uncertainty” to the financial management of projects under uncertainty European Journal of Operational Research. 238: 65-76 |
Matta ME, Elmaghraby SE. (2010) Polynomial time algorithms for two special classes of the proportionate multiprocessor open shop European Journal of Operational Research. 201: 720-728 |
Jin ZH, Ohno K, Ito T, et al. (2009) Scheduling Hybrid Flowshops In Printed Circuit Board Assembly Lines Production and Operations Management. 11: 216-230 |
Allaoui H, Artiba A, Goncalves G, et al. (2008) Scheduling n jobs and preventive maintenance in a single machine subject to breakdowns to minimize the expected total earliness and tardiness costs Ifac Proceedings Volumes. 41: 15843-15848 |
Allaoui H, Artiba A, Elmaghraby SE, et al. (2006) Scheduling of a two-machine flowshop with availability constraints on the first machine International Journal of Production Economics. 99: 16-27 |
Ramachandra G, Elmaghraby SE. (2006) Sequencing precedence-related jobs on two machines to minimize the weighted completion time International Journal of Production Economics. 100: 44-58 |
Artiba A, Elmaghraby SE. (2005) IEPM: Focus on scheduling European Journal of Operational Research. 161: 1-2 |
Elmaghraby S. (2005) Mathematical Programming and Financial Objectives for Scheduling Projects Journal of Scheduling. 8: 543-546 |
Tereso AP, Araújo MMTd, Elmaghraby S. (2004) Adaptive resource allocation in multimodal activity networks International Journal of Production Economics. 92: 1-10 |