Parents

Sign in to add mentor
Andrew S. Schultz grad student 1958 Cornell (Business Management Tree)
Lionel Weiss grad student 1958 Cornell (Computer Science Tree)
 (Programming under uncertainty)

Children

Sign in to add trainee
Fuad Akil Rihani grad student 1974 NCSU
Leon F. McGinnis grad student 1975 NCSU
Subhash C. Sarin grad student 1978 NCSU
Razek E. Karnoub grad student 2002 NCSU
Girish A. Ramachandra grad student 2006 NCSU
BETA: Related publications

Publications

You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect.

Elmaghraby SE, Ramachandra G. (2014) Optimal resource allocation in activity networks - stochastic environment International Journal of Project Organisation and Management. 6: 67-95
Zhang J, Elmaghraby SE. (2014) The relevance of the “alphorn of uncertainty” to the financial management of projects under uncertainty European Journal of Operational Research. 238: 65-76
Matta ME, Elmaghraby SE. (2010) Polynomial time algorithms for two special classes of the proportionate multiprocessor open shop European Journal of Operational Research. 201: 720-728
Jin ZH, Ohno K, Ito T, et al. (2009) Scheduling Hybrid Flowshops In Printed Circuit Board Assembly Lines Production and Operations Management. 11: 216-230
Allaoui H, Artiba A, Goncalves G, et al. (2008) Scheduling n jobs and preventive maintenance in a single machine subject to breakdowns to minimize the expected total earliness and tardiness costs Ifac Proceedings Volumes. 41: 15843-15848
Allaoui H, Artiba A, Elmaghraby SE, et al. (2006) Scheduling of a two-machine flowshop with availability constraints on the first machine International Journal of Production Economics. 99: 16-27
Ramachandra G, Elmaghraby SE. (2006) Sequencing precedence-related jobs on two machines to minimize the weighted completion time International Journal of Production Economics. 100: 44-58
Artiba A, Elmaghraby SE. (2005) IEPM: Focus on scheduling European Journal of Operational Research. 161: 1-2
Elmaghraby S. (2005) Mathematical Programming and Financial Objectives for Scheduling Projects Journal of Scheduling. 8: 543-546
Tereso AP, Araújo MMTd, Elmaghraby S. (2004) Adaptive resource allocation in multimodal activity networks International Journal of Production Economics. 92: 1-10
See more...