Year |
Citation |
Score |
2020 |
Beach B, Hildebrand R, Ellis K, Lebreton B. An approximate method for the optimization of long-Horizon tank blending and scheduling operations Computers & Chemical Engineering. 141: 106839. DOI: 10.1016/J.Compchemeng.2020.106839 |
0.499 |
|
2017 |
Farrokhvar L, Ellis KP, Arbogast JE. Allocation of bulk tanks to improve industrial gas distribution to customers with time varying demand Logistics Research. 10: 1-19. DOI: 10.23773/2017_2 |
0.319 |
|
2017 |
Purdy GT, Camelio JA, Ellis KP, Peccoud J. Opportunities to apply manufacturing systems analysis techniques in genetic manufacturing systems Manufacturing Letters. 13: 34-38. DOI: 10.1016/J.Mfglet.2017.06.003 |
0.373 |
|
2014 |
Feng Y, Ellis KP, Crawford CW. Trailer fleet planning for industrial gas distribution Iie Transactions (Institute of Industrial Engineers). 46: 1329-1342. DOI: 10.1080/0740817X.2014.905737 |
0.368 |
|
2014 |
Ellis KP, Sherali HD, Saunders L, Shao S, Crawford C. Bulk tank allocation to improve distribution planning for the industrial gas industry Iie Transactions (Institute of Industrial Engineers). 46: 557-566. DOI: 10.1080/0740817X.2013.849831 |
0.393 |
|
2010 |
Ellis KP, Meller RD, Wilck JH, Parikh PJ, Marchand F. Effective material flow at an assembly facility International Journal of Production Research. 48: 7195-7217. DOI: 10.1080/00207540903186266 |
0.334 |
|
2009 |
McDonald T, Ellis KP, Van Aken EM, Patrick Koelling C. Development and application of a worker assignment model to evaluate a lean manufacturing cell International Journal of Production Research. 47: 2427-2447. DOI: 10.1080/00207540701570174 |
0.321 |
|
2007 |
Farris JA, Van Aken EM, Letens G, Ellis KP, Boyland J. A structured approach for assessing the effectiveness of engineering design tools in new product development Emj - Engineering Management Journal. 19: 31-39. DOI: 10.1080/10429247.2007.11431729 |
0.33 |
|
2004 |
Ellis KP, Lu Y, Bish EK. Scheduling of wafer test processes in semiconductor manufacturing International Journal of Production Research. 42: 215-242. DOI: 10.1080/0020754031000118116 |
0.377 |
|
2002 |
Kobza JE, Ellis KP, Vittes FJ. Improving throughput for an electronic assembly line using a constraint analysis methodology Production Planning & Control. 13: 262-273. DOI: 10.1080/09537280110071745 |
0.433 |
|
2002 |
Ellis KP, Bhoja S. Optimization of the assignment of circuit cards to assembly lines in electronics assembly International Journal of Production Research. 40: 2609-2631. DOI: 10.1080/00207540210135604 |
0.568 |
|
2002 |
Ellis KP, Kobza JE, Vittes FJ. Development of a placement time estimator function for a turret style surface mount placement machine Robotics and Computer-Integrated Manufacturing. 18: 241-254. DOI: 10.1016/S0736-5845(02)00015-7 |
0.423 |
|
2000 |
Helo F, Ellis KP, Kobza JE. Methodology For Predicting Manufacturing Yield For Printed Circuit Board Assembly Lines Journal of Electronics Manufacturing. 10: 115-126. DOI: 10.1142/S0960313100000071 |
0.414 |
|
1997 |
Ammons JC, Carlyle M, Cranmer L, DePuy G, Ellis K, McGinnis LF, Tovey CA, Xu H. Component allocation to balance workload in printed circuit card assembly systems Iie Transactions (Institute of Industrial Engineers). 29: 265-275. DOI: 10.1023/A:1018579430790 |
0.343 |
|
Show low-probability matches. |