Year |
Citation |
Score |
2013 |
Wang W, Plante RD, Tang J. Minimum cost allocation of quality improvement targets under supplier process disruption European Journal of Operational Research. 228: 388-396. DOI: 10.1016/J.Ejor.2013.01.048 |
0.551 |
|
2013 |
Hu CH, Plante RD, Tang J. Statistical equivalency and optimality of simple step‐stress accelerated test plans for the exponential distribution Naval Research Logistics. 60: 19-30. DOI: 10.1002/Nav.21516 |
0.329 |
|
2012 |
Hu CH, Plante RD, Tang J. Step-stress accelerated life tests: A proportional hazards-based non-parametric model Iie Transactions. 44: 754-764. DOI: 10.1080/0740817X.2011.596508 |
0.339 |
|
2009 |
Moskowitz H, Plante RD. Dynamic Graphical Assessment Of Interaction Effects In Design Of Experiments Production and Operations Management. 6: 357-372. DOI: 10.1111/J.1937-5956.1997.Tb00480.X |
0.311 |
|
2009 |
Moskowitz H, Plante RD, Wardell DG. Using Run‐Length Distributions Of Control Charts To Detect False Alarms Production and Operations Management. 3: 217-239. DOI: 10.1111/J.1937-5956.1994.Tb00121.X |
0.326 |
|
2006 |
Tarakci H, Tang K, Moskowitz H, Plante R. Incentive maintenance outsourcing contracts for channel coordination and improvement Iie Transactions (Institute of Industrial Engineers). 38: 671-684. DOI: 10.1080/07408170600692259 |
0.381 |
|
2006 |
Tarakci H, Tang K, Moskowitz H, Plante R. Maintenance outsourcing of a multi-process manufacturing system with multiple contractors Iie Transactions (Institute of Industrial Engineers). 38: 81-92. DOI: 10.1080/07408170500243328 |
0.37 |
|
2006 |
Zantek PF, Wright GP, Plante RD. A self-starting procedure for monitoring process quality in multistage manufacturing systems Iie Transactions. 38: 293-308. DOI: 10.1080/07408170500208354 |
0.348 |
|
2003 |
Köksalan M, Plante RD. Interactive Multicriteria Optimization for Multiple-Response Product and Process Design Manufacturing & Service Operations Management. 5: 334-347. DOI: 10.1287/Msom.5.4.334.24886 |
0.419 |
|
2003 |
Serel DA, Dada M, Moskowitz H, Plante RD. Investing in quality under autonomous and induced learning Iie Transactions. 35: 545-555. DOI: 10.1080/07408170304415 |
0.404 |
|
2002 |
Zantek PF, Wright GP, Plante RD. Process and Product Improvement in Manufacturing Systems with Correlated Stages Management Science. 48: 591-606. DOI: 10.1287/Mnsc.48.5.591.7804 |
0.348 |
|
2002 |
Plante R. Multivariate tolerance design for a quadratic design parameter model Iie Transactions. 34: 565-571. DOI: 10.1023/A:1013926727053 |
0.361 |
|
2002 |
Liu S, Moskowitz H, Plante R, Preckel PV. Product and process yield estimation with Gaussian quadrature (GQ) reduction: Improvements over the GQ full factorial approach European Journal of Operational Research. 140: 655-669. DOI: 10.1016/S0377-2217(01)00217-X |
0.362 |
|
2001 |
Plante RD. Process capability: a criterion for optimizing multiple response product and process design Iie Transactions. 33: 497-509. DOI: 10.1023/A:1007694030052 |
0.4 |
|
2001 |
Moskowitz H, Plante R, Duffy J. Multivariate tolerance design using quality loss Iie Transactions. 33: 437-448. DOI: 10.1023/A:1007677510487 |
0.434 |
|
2001 |
Johanns P, Lowe T, Plante RD. Selection and sequencing heuristics to reduce variance in gas turbine engine nozzle assemblies European Journal of Operational Research. 132: 490-504. DOI: 10.1016/S0377-2217(00)00139-9 |
0.322 |
|
2001 |
Moskowitz H, Plante R, Tang J. Allocation of quality improvement targets based on investments in learning Naval Research Logistics. 48: 684-709. DOI: 10.1002/Nav.1042 |
0.397 |
|
2000 |
Plante R. Allocation of variance reduction targets under the influence of supplier interaction International Journal of Production Research. 38: 2815-2827. DOI: 10.1080/002075400411493 |
0.423 |
|
1999 |
Plante R, Moskowitz H, Tang J, Duffy J, Whitt W, Li H. Incorporation Competence Sets of Decision Makers by Deduction Graphs Operations Research. 47: 209-220. DOI: 10.1287/Opre.47.2.209 |
0.314 |
|
1999 |
Plante R, Moskowitz H, Tang J, Duffy J. Improving Quality Via Matching: a Case Study Integrating Supplier and Manufacturer Quality Performance Manufacturing & Service Operations Management. 1: 36-49. DOI: 10.1287/Msom.1.1.36 |
0.396 |
|
1999 |
Plante RD. Multicriteria models for the allocation of design parameter targets European Journal of Operational Research. 115: 98-112. DOI: 10.1016/S0377-2217(98)00119-2 |
0.396 |
|
1997 |
Chun YH, Moskowitz H, Plante RD. Single Threshold Selection Strategy In The Group Interview Problem Infor. 35: 157-169. DOI: 10.1080/03155986.1997.11732326 |
0.333 |
|
1995 |
Seppala T, Moskowitz H, Plante R, Tang J. Statistical Process Control via the Subgroup Bootstrap Journal of Quality Technology. 27: 139-153. DOI: 10.1080/00224065.1995.11979577 |
0.318 |
|
1995 |
Chun YH, Moskowitz H, Plante R. Sequencing a Set of Alternatives Under Time Constraints Journal of the Operational Research Society. 46: 1133-1144. DOI: 10.1057/Jors.1995.157 |
0.352 |
|
1994 |
Moskowitz H, Plante R, Chun YH. Effect Of Process Failure Mechanisms On Economic X¯ Control Charts Iie Transactions. 26: 12-21. DOI: 10.1080/07408179408966633 |
0.37 |
|
1994 |
Wardell DG, Moskowitz H, Plante RD. Run-Length Distributions of Special-Cause Control Charts for Correlated Processes Technometrics. 36: 3-17. DOI: 10.1080/00401706.1994.10485393 |
0.344 |
|
1994 |
Wardell DG, Moskowitz H, Plante RD. Run Length Distributions of Residual Control Charts for Autocorrelated Processes Journal of Quality Technology. 26: 308-317. DOI: 10.1080/00224065.1994.11979542 |
0.335 |
|
1994 |
Moskowitz H, Plante R, Chun YH. Effect of quality loss functions on the economic design of process control charts European Journal of Operational Research. 72: 333-349. DOI: 10.1016/0377-2217(94)90314-X |
0.4 |
|
1994 |
Chun YH, Moskowitz H, Plante RD. Dynamic programming formulation of the group interview problem with a general utility function European Journal of Operational Research. 78: 81-92. DOI: 10.1016/0377-2217(94)90123-6 |
0.327 |
|
1993 |
Chun YH, Moskowitz H, Plante RD. Optimal Selection Strategy for the Group Interview Problem Decision Sciences. 24: 295-314. DOI: 10.1111/J.1540-5915.1993.Tb00476.X |
0.363 |
|
1993 |
Rogers DF, Plante RD. Estimating equilibrium probabilities for band diagonal Markov chains using aggregation and disaggregation techniques Computers & Operations Research. 20: 857-877. DOI: 10.1016/0305-0548(93)90107-T |
0.301 |
|
1992 |
Wardell DG, Moskowitz H, Plante RD. Control Charts in the Presence of Data Correlation Management Science. 38: 1084-1105. DOI: 10.1287/Mnsc.38.8.1084 |
0.37 |
|
1991 |
Rogers DF, Plante RD, Wong RT, Evans JR. Aggregation and Disaggregation Techniques and Methodology in Optimization Operations Research. 39: 553-582. DOI: 10.1287/Opre.39.4.553 |
0.341 |
|
1991 |
Matsumura EM, Plante R, Tsui K, Kannan P. Comparative Performance of Two Muitinomial-Based Methods for Obtaining Lower Bounds on the Total Overstatement Error in Accounting Populations Journal of Business & Economic Statistics. 9: 423-429. DOI: 10.1080/07350015.1991.10509869 |
0.31 |
|
1991 |
Moskowitz H, Plante R, Tsai H. Single-sided economic screening models incorporating individual unit misclassification error and risk preference European Journal of Operational Research. 53: 228-243. DOI: 10.1016/0377-2217(91)90137-K |
0.378 |
|
1988 |
Plante RD. The nozzle guide vane problem Operations Research. 36: 18-33. DOI: 10.1287/Opre.36.1.18 |
0.317 |
|
1988 |
Balakrishnan A, Plante R, Wong R. The nozzle guide vane problem: Partitioning a heterogeneous inventory European Journal of Operational Research. 35: 328-338. DOI: 10.1016/0377-2217(88)90223-8 |
0.3 |
|
1987 |
Plante RD, Lowe TJ, Chandrasekaran R. The Product Matrix Traveling Salesman Problem: An Application and Solution Heuristic Operations Research. 35: 772-783. DOI: 10.1287/Opre.35.5.772 |
0.33 |
|
1987 |
Crosby M, Plante R, Tang K. An Economic Modeling Approach For The Determination Of Materiality In Auditing Decision Sciences. 18: 108-115. DOI: 10.1111/J.1540-5915.1987.Tb01506.X |
0.338 |
|
1986 |
Tang K, Plante R, Moskowitz H. Multiattribute Bayesian Acceptance Sampling Plans Under Nondestructive Inspection Management Science. 32: 739-750. DOI: 10.1287/Mnsc.32.6.739 |
0.339 |
|
1986 |
Moskowitz H, Plante R, Tang K. Multistage Multiattribute Acceptance Sampling in Serial Production Systems Iie Transactions. 18: 130-137. DOI: 10.1080/07408178608975340 |
0.369 |
|
1984 |
Moskowitz H, Plante R. Effect of Risk Aversion on Single Sample Attribute Inspection Plans Management Science. 30: 1226-1237. DOI: 10.1287/Mnsc.30.10.1226 |
0.38 |
|
1984 |
Moskowitz H, Plante R, Tang K, Ravindran A. Multiattribute Bayesian Acceptance Sampling Plans for Screening and Scrapping Rejected Lots Iie Transactions. 16: 185-192. DOI: 10.1080/07408178408974684 |
0.388 |
|
Show low-probability matches. |