Hooman Askari-Nasab - Publications

Affiliations: 
Civil and Environmental Engineering University of Alberta, Edmonton, Alberta, Canada 
Area:
Mining Engineering, Petroleum Engineering

43 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Jélvez E, Morales N, Askari-Nasab H. A new model for automated pushback selection Computers & Operations Research. 115: 104456. DOI: 10.1016/J.Cor.2018.04.015  0.409
2019 Badiozamani MM, Ben-Awuah E, Askari-Nasab H. Mixed Integer Linear Programming for Oil Sands Production Planning and Tailings Management Journal of Environmental Informatics. 33: 96-104. DOI: 10.3808/Jei.201900405  0.817
2019 Tabesh M, Askari-Nasab H. Clustering mining blocks in presence of geological uncertainty Mining Technology. 128: 162-176. DOI: 10.1080/25726668.2019.1596425  0.467
2019 Afrapoli AM, Tabesh M, Askari-Nasab H. A stochastic hybrid simulation-optimization approach towards haul fleet sizing in surface mines Mining Technology. 128: 9-20. DOI: 10.1080/25726668.2018.1473314  0.354
2019 Afum BO, Ben-Awuah E, Askari-Nasab H. A mixed integer linear programming framework for optimising the extraction strategy of open pit – underground mining options and transitions International Journal of Mining, Reclamation and Environment. 1-25. DOI: 10.1080/17480930.2019.1701968  0.722
2019 Afrapoli AM, Askari-Nasab H. Mining fleet management systems: a review of models and algorithms International Journal of Mining, Reclamation and Environment. 33: 42-60. DOI: 10.1080/17480930.2017.1336607  0.381
2019 Upadhyay SP, Askari-Nasab H. Dynamic shovel allocation approach to short-term production planning in open-pit mines International Journal of Mining, Reclamation and Environment. 33: 1-20. DOI: 10.1080/17480930.2017.1315524  0.432
2019 Afrapoli AM, Tabesh M, Askari-Nasab H. A multiple objective transportation problem approach to dynamic truck dispatching in surface mines European Journal of Operational Research. 276: 331-342. DOI: 10.1016/J.Ejor.2019.01.008  0.513
2018 Ben-Awuah E, Askari-Nasab H, Maremi A, Hosseini NS. Implementation of a goal programming framework for production and dyke material planning International Journal of Mining, Reclamation and Environment. 32: 536-563. DOI: 10.1080/17480930.2017.1331082  0.812
2017 Upadhyay SP, Askari-Nasab H. Simulation and optimization approach for uncertainty-based short-term planning in open pit mines International Journal of Mining Science and Technology. 28: 153-166. DOI: 10.1016/J.Ijmst.2017.12.003  0.497
2016 Upadhyay SP, Askari-Nasab H. Truck-shovel allocation optimisation: A goal programming approach Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 125: 82-92. DOI: 10.1179/1743286315Y.0000000024  0.565
2016 Badiozamani MM, Askari-Nasab H. Integrated mine and tailings planning: a mixed integer linear programming model International Journal of Mining, Reclamation and Environment. 30: 319-346. DOI: 10.1080/17480930.2015.1092993  0.602
2015 Torkamani E, Askari-Nasab H. A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation International Journal of Mining and Mineral Engineering. 6: 97-118. DOI: 10.7939/R33K6X  0.536
2015 Ben-Awuah E, Elkington T, Askari-Nasab H, Blanchfield F. Simultaneous production scheduling and waste management optimization for an oil sands application Journal of Environmental Informatics. 26: 80-90. DOI: 10.3808/jei.201500305  0.813
2015 Tabesh M, Askari-Nasab H, Peroni R. A comprehensive approach to strategic open pit mine planning with stockpile consideration Application of Computers and Operations Research in the Mineral Industry - Proceedings of the 37th International Symposium, Apcom 2015. 326-332.  0.468
2014 Tabesh M, Mieth C, Askari-Nasab H. A multi-step approach to long-term open-pit production planning International Journal of Mining and Mineral Engineering. 5: 273-298. DOI: 10.1504/IJMME.2014.066577  0.488
2014 Pourrahimian Y, Askari-Nasab H. An application of mathematical programming to determine the best height of draw in block-cave sequence optimisation Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 123: 162-172. DOI: 10.1179/1743286314Y.0000000061  0.784
2014 Koushavand B, Askari-Nasab H, Deutsch CV. A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile International Journal of Mining Science and Technology. 24: 451-459. DOI: 10.1016/J.Ijmst.2014.05.006  0.597
2014 Badiozamani MM, Askari-Nasab H. Integration of reclamation and tailings management in oil sands surface mine planning Environmental Modelling and Software. 51: 45-58. DOI: 10.1016/J.Envsoft.2013.09.026  0.668
2013 Eivazy H, Askari-Nasab H. A hierarchical open-pit mine production scheduling optimisation model International Journal of Mining and Mineral Engineering. 4: 89-115. DOI: 10.1504/Ijmme.2012.052436  0.586
2013 Ben-Awuah E, Askari-Nasab H. Incorporating waste management into oil sandslong term production planning Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 122: 33-45. DOI: 10.1179/1743286312Y.0000000031  0.825
2013 Tabesh M, Askari-Nasab H. Automatic creation of mining polygons using hierarchical clustering techniques Journal of Mining Science. 49: 426-440. DOI: 10.1134/S1062739149030106  0.415
2013 Kalantari S, Ben-Awuah E, Askari-Nasab H. Towards an integrated oil sands mine plan and composite tailings plan International Journal of Mining, Reclamation and Environment. 27: 103-126. DOI: 10.1080/17480930.2012.661547  0.779
2012 Ben-Awuah E, Askari-Nasab H, Awuah-Offei K. Production scheduling and waste disposal planning for oil sands mining using goal programming Journal of Environmental Informatics. 20: 20-33. DOI: 10.3808/Jei.201200217  0.832
2012 Pourrahimian Y, Askari-Nasab H, Tannant D. Mixed-Integer Linear Programming formulation for block-cave sequence optimisation International Journal of Mining and Mineral Engineering. 4: 26-49. DOI: 10.1504/Ijmme.2012.047998  0.784
2012 Eivazy H, Askari-Nasab H. A mixed integer linear programming model for short-term open pit mine production scheduling Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 121: 97-108. DOI: 10.1179/1743286312Y.0000000006  0.509
2012 Brown OF, Awuah-Offei K, Frimpong S, Askari-Nasab H. High performing HMA design optimization 2012 Sme Annual Meeting and Exhibit 2012, Sme 2012, Meeting Preprints. 680-684.  0.315
2012 Askari-Nasab H, Torkamani E, Badiozamani MM, Tabesh M. Alignment of short-term and operational plans using discrete event simulation 2012 Sme Annual Meeting and Exhibit 2012, Sme 2012, Meeting Preprints. 304-311.  0.434
2011 Tabesh M, Askari-Nasab H. Two-stage clustering algorithm for block aggregation in open pit mines Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 120: 158-169. DOI: 10.1179/1743286311Y.0000000009  0.449
2011 Askari-Nasab H, Pourrahimian Y, Ben-Awuah E, Kalantari S. Mixed integer linear programming formulations for open pit production scheduling Journal of Mining Science. 47: 338-359. DOI: 10.1134/S1062739147030117  0.76
2011 Ben-Awuah E, Askari-Nasab H. Oil sands mine planning and waste management using mixed integer goal programming International Journal of Mining, Reclamation and Environment. 25: 226-247. DOI: 10.1080/17480930.2010.549656  0.819
2011 Awuah-Offei K, Askari-Nasab H. Aggregate cost minimization in hot-mix asphalt design Journal of Materials in Civil Engineering. 23: 554-561. DOI: 10.1061/(Asce)Mt.1943-5533.0000211  0.41
2011 Askari-Nasab H, Eivazy H, Tabesh M, Badiozamani MM. A mathematical programming model for open pit short-term production scheduling Sme Annual Meeting and Exhibit and Cma 113th National Western Mining Conference 2011. 213-220.  0.46
2011 Askari-Nasab H, Ben-Awuah E. Integration of oil sands mine planning and waste management using goal programming 35th Apcom Symposium - Application of Computers and Operations Research in the Minerals Industry, Proceedings. 329-350.  0.82
2010 Askari-Nasab H, Awuah-Offei K, Eivazy H. Large-scale open pit production scheduling using Mixed Integer Linear Programming International Journal of Mining and Mineral Engineering. 2: 185-214. DOI: 10.1504/Ijmme.2010.037624  0.583
2009 Awuah-Offei K, Askari-Nasab H. Asphalt mix design optimization for efficient plant management Transportation Research Record. 105-112. DOI: 10.3141/2098-11  0.411
2009 Askari-Nasab H, Awuah-Offei K. Open pit optimisation using discounted economic block values Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 118: 1-12. DOI: 10.1179/037178409X12450752943243  0.47
2009 Awuah-Offei K, Askari-Nasab H. Linear programming optimization of asphalt mix design Sme Annual Meeting and Exhibit and Cma's 111th National Western Mining Conference 2009. 1: 250-254.  0.315
2008 Askari-Nasab H, Frimpong S, Szymanski J. Investigating continuous time open pit dynamics Journal of the Southern African Institute of Mining and Metallurgy. 108: 61-71.  0.373
2007 Askari-Nasab H, Frimpong S, Szymanski J. Modelling open pit dynamics using discrete simulation International Journal of Mining, Reclamation and Environment. 21: 35-49. DOI: 10.1080/17480930600720206  0.48
2005 Awuah-Offei K, Frimpong S, Askari-Nasab H. Dynamic simulation of cable shovel specific energy in oil sands excavation Proceedings of the 14th International Symposium On Mine Planning and Equipment Selection, Mpes 2005 and the 5th International Conference On Computer Applications in the Minerals Industries, Cami 2005. 33-45.  0.338
2005 Askari-Nasab H, Frimpong S, Awuah-Offei K. Intelligent optimal production scheduling estimator Application of Computers and Operations Research in the Mineral Industry - Proc. of the 32nd Int. Symposium On the Application of Computers and Operations Research in the Mineral Industry, Apcom 2005. 279-285.  0.4
2005 Askari-Nasab H, Szymanski J. Modelling open pit dynamics using monte carlo simulation Proceedings of the 14th International Symposium On Mine Planning and Equipment Selection, Mpes 2005 and the 5th International Conference On Computer Applications in the Minerals Industries, Cami 2005. 21-32.  0.311
Show low-probability matches.