Year |
Citation |
Score |
2020 |
Jélvez E, Morales N, Askari-Nasab H. A new model for automated pushback selection Computers & Operations Research. 115: 104456. DOI: 10.1016/J.Cor.2018.04.015 |
0.409 |
|
2019 |
Badiozamani MM, Ben-Awuah E, Askari-Nasab H. Mixed Integer Linear Programming for Oil Sands Production Planning and Tailings Management Journal of Environmental Informatics. 33: 96-104. DOI: 10.3808/Jei.201900405 |
0.817 |
|
2019 |
Tabesh M, Askari-Nasab H. Clustering mining blocks in presence of geological uncertainty Mining Technology. 128: 162-176. DOI: 10.1080/25726668.2019.1596425 |
0.467 |
|
2019 |
Afrapoli AM, Tabesh M, Askari-Nasab H. A stochastic hybrid simulation-optimization approach towards haul fleet sizing in surface mines Mining Technology. 128: 9-20. DOI: 10.1080/25726668.2018.1473314 |
0.354 |
|
2019 |
Afum BO, Ben-Awuah E, Askari-Nasab H. A mixed integer linear programming framework for optimising the extraction strategy of open pit – underground mining options and transitions International Journal of Mining, Reclamation and Environment. 1-25. DOI: 10.1080/17480930.2019.1701968 |
0.722 |
|
2019 |
Afrapoli AM, Askari-Nasab H. Mining fleet management systems: a review of models and algorithms International Journal of Mining, Reclamation and Environment. 33: 42-60. DOI: 10.1080/17480930.2017.1336607 |
0.381 |
|
2019 |
Upadhyay SP, Askari-Nasab H. Dynamic shovel allocation approach to short-term production planning in open-pit mines International Journal of Mining, Reclamation and Environment. 33: 1-20. DOI: 10.1080/17480930.2017.1315524 |
0.432 |
|
2019 |
Afrapoli AM, Tabesh M, Askari-Nasab H. A multiple objective transportation problem approach to dynamic truck dispatching in surface mines European Journal of Operational Research. 276: 331-342. DOI: 10.1016/J.Ejor.2019.01.008 |
0.513 |
|
2018 |
Ben-Awuah E, Askari-Nasab H, Maremi A, Hosseini NS. Implementation of a goal programming framework for production and dyke material planning International Journal of Mining, Reclamation and Environment. 32: 536-563. DOI: 10.1080/17480930.2017.1331082 |
0.812 |
|
2017 |
Upadhyay SP, Askari-Nasab H. Simulation and optimization approach for uncertainty-based short-term planning in open pit mines International Journal of Mining Science and Technology. 28: 153-166. DOI: 10.1016/J.Ijmst.2017.12.003 |
0.497 |
|
2016 |
Upadhyay SP, Askari-Nasab H. Truck-shovel allocation optimisation: A goal programming approach Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 125: 82-92. DOI: 10.1179/1743286315Y.0000000024 |
0.565 |
|
2016 |
Badiozamani MM, Askari-Nasab H. Integrated mine and tailings planning: a mixed integer linear programming model International Journal of Mining, Reclamation and Environment. 30: 319-346. DOI: 10.1080/17480930.2015.1092993 |
0.602 |
|
2015 |
Torkamani E, Askari-Nasab H. A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation International Journal of Mining and Mineral Engineering. 6: 97-118. DOI: 10.7939/R33K6X |
0.536 |
|
2015 |
Ben-Awuah E, Elkington T, Askari-Nasab H, Blanchfield F. Simultaneous production scheduling and waste management optimization for an oil sands application Journal of Environmental Informatics. 26: 80-90. DOI: 10.3808/jei.201500305 |
0.813 |
|
2015 |
Tabesh M, Askari-Nasab H, Peroni R. A comprehensive approach to strategic open pit mine planning with stockpile consideration Application of Computers and Operations Research in the Mineral Industry - Proceedings of the 37th International Symposium, Apcom 2015. 326-332. |
0.468 |
|
2014 |
Tabesh M, Mieth C, Askari-Nasab H. A multi-step approach to long-term open-pit production planning International Journal of Mining and Mineral Engineering. 5: 273-298. DOI: 10.1504/IJMME.2014.066577 |
0.488 |
|
2014 |
Pourrahimian Y, Askari-Nasab H. An application of mathematical programming to determine the best height of draw in block-cave sequence optimisation Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 123: 162-172. DOI: 10.1179/1743286314Y.0000000061 |
0.784 |
|
2014 |
Koushavand B, Askari-Nasab H, Deutsch CV. A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile International Journal of Mining Science and Technology. 24: 451-459. DOI: 10.1016/J.Ijmst.2014.05.006 |
0.597 |
|
2014 |
Badiozamani MM, Askari-Nasab H. Integration of reclamation and tailings management in oil sands surface mine planning Environmental Modelling and Software. 51: 45-58. DOI: 10.1016/J.Envsoft.2013.09.026 |
0.668 |
|
2013 |
Eivazy H, Askari-Nasab H. A hierarchical open-pit mine production scheduling optimisation model International Journal of Mining and Mineral Engineering. 4: 89-115. DOI: 10.1504/Ijmme.2012.052436 |
0.586 |
|
2013 |
Ben-Awuah E, Askari-Nasab H. Incorporating waste management into oil sandslong term production planning Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 122: 33-45. DOI: 10.1179/1743286312Y.0000000031 |
0.825 |
|
2013 |
Tabesh M, Askari-Nasab H. Automatic creation of mining polygons using hierarchical clustering techniques Journal of Mining Science. 49: 426-440. DOI: 10.1134/S1062739149030106 |
0.415 |
|
2013 |
Kalantari S, Ben-Awuah E, Askari-Nasab H. Towards an integrated oil sands mine plan and composite tailings plan International Journal of Mining, Reclamation and Environment. 27: 103-126. DOI: 10.1080/17480930.2012.661547 |
0.779 |
|
2012 |
Ben-Awuah E, Askari-Nasab H, Awuah-Offei K. Production scheduling and waste disposal planning for oil sands mining using goal programming Journal of Environmental Informatics. 20: 20-33. DOI: 10.3808/Jei.201200217 |
0.832 |
|
2012 |
Pourrahimian Y, Askari-Nasab H, Tannant D. Mixed-Integer Linear Programming formulation for block-cave sequence optimisation International Journal of Mining and Mineral Engineering. 4: 26-49. DOI: 10.1504/Ijmme.2012.047998 |
0.784 |
|
2012 |
Eivazy H, Askari-Nasab H. A mixed integer linear programming model for short-term open pit mine production scheduling Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 121: 97-108. DOI: 10.1179/1743286312Y.0000000006 |
0.509 |
|
2012 |
Brown OF, Awuah-Offei K, Frimpong S, Askari-Nasab H. High performing HMA design optimization 2012 Sme Annual Meeting and Exhibit 2012, Sme 2012, Meeting Preprints. 680-684. |
0.315 |
|
2012 |
Askari-Nasab H, Torkamani E, Badiozamani MM, Tabesh M. Alignment of short-term and operational plans using discrete event simulation 2012 Sme Annual Meeting and Exhibit 2012, Sme 2012, Meeting Preprints. 304-311. |
0.434 |
|
2011 |
Tabesh M, Askari-Nasab H. Two-stage clustering algorithm for block aggregation in open pit mines Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 120: 158-169. DOI: 10.1179/1743286311Y.0000000009 |
0.449 |
|
2011 |
Askari-Nasab H, Pourrahimian Y, Ben-Awuah E, Kalantari S. Mixed integer linear programming formulations for open pit production scheduling Journal of Mining Science. 47: 338-359. DOI: 10.1134/S1062739147030117 |
0.76 |
|
2011 |
Ben-Awuah E, Askari-Nasab H. Oil sands mine planning and waste management using mixed integer goal programming International Journal of Mining, Reclamation and Environment. 25: 226-247. DOI: 10.1080/17480930.2010.549656 |
0.819 |
|
2011 |
Awuah-Offei K, Askari-Nasab H. Aggregate cost minimization in hot-mix asphalt design Journal of Materials in Civil Engineering. 23: 554-561. DOI: 10.1061/(Asce)Mt.1943-5533.0000211 |
0.41 |
|
2011 |
Askari-Nasab H, Eivazy H, Tabesh M, Badiozamani MM. A mathematical programming model for open pit short-term production scheduling Sme Annual Meeting and Exhibit and Cma 113th National Western Mining Conference 2011. 213-220. |
0.46 |
|
2011 |
Askari-Nasab H, Ben-Awuah E. Integration of oil sands mine planning and waste management using goal programming 35th Apcom Symposium - Application of Computers and Operations Research in the Minerals Industry, Proceedings. 329-350. |
0.82 |
|
2010 |
Askari-Nasab H, Awuah-Offei K, Eivazy H. Large-scale open pit production scheduling using Mixed Integer Linear Programming International Journal of Mining and Mineral Engineering. 2: 185-214. DOI: 10.1504/Ijmme.2010.037624 |
0.583 |
|
2009 |
Awuah-Offei K, Askari-Nasab H. Asphalt mix design optimization for efficient plant management Transportation Research Record. 105-112. DOI: 10.3141/2098-11 |
0.411 |
|
2009 |
Askari-Nasab H, Awuah-Offei K. Open pit optimisation using discounted economic block values Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 118: 1-12. DOI: 10.1179/037178409X12450752943243 |
0.47 |
|
2009 |
Awuah-Offei K, Askari-Nasab H. Linear programming optimization of asphalt mix design Sme Annual Meeting and Exhibit and Cma's 111th National Western Mining Conference 2009. 1: 250-254. |
0.315 |
|
2008 |
Askari-Nasab H, Frimpong S, Szymanski J. Investigating continuous time open pit dynamics Journal of the Southern African Institute of Mining and Metallurgy. 108: 61-71. |
0.373 |
|
2007 |
Askari-Nasab H, Frimpong S, Szymanski J. Modelling open pit dynamics using discrete simulation International Journal of Mining, Reclamation and Environment. 21: 35-49. DOI: 10.1080/17480930600720206 |
0.48 |
|
2005 |
Awuah-Offei K, Frimpong S, Askari-Nasab H. Dynamic simulation of cable shovel specific energy in oil sands excavation Proceedings of the 14th International Symposium On Mine Planning and Equipment Selection, Mpes 2005 and the 5th International Conference On Computer Applications in the Minerals Industries, Cami 2005. 33-45. |
0.338 |
|
2005 |
Askari-Nasab H, Frimpong S, Awuah-Offei K. Intelligent optimal production scheduling estimator Application of Computers and Operations Research in the Mineral Industry - Proc. of the 32nd Int. Symposium On the Application of Computers and Operations Research in the Mineral Industry, Apcom 2005. 279-285. |
0.4 |
|
2005 |
Askari-Nasab H, Szymanski J. Modelling open pit dynamics using monte carlo simulation Proceedings of the 14th International Symposium On Mine Planning and Equipment Selection, Mpes 2005 and the 5th International Conference On Computer Applications in the Minerals Industries, Cami 2005. 21-32. |
0.311 |
|
Show low-probability matches. |