Yashar Pourrahimian, Ph.D. - Publications

Affiliations: 
2013 Civil and Environmental Engineering University of Alberta, Edmonton, Alberta, Canada 
Area:
Mining Engineering

20 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Maremi A, Ben-Awuah E, Pourrahimian Y. An automated production targeting goal programming framework for oil sands mine planning considering organic rich solids Mining Technology. 129: 53-67. DOI: 10.1080/25726668.2020.1749431  0.682
2020 Zarate EU, Pourrahimian Y, Boisvert J. Optimizing block caving drawpoints over multiple geostatistical models International Journal of Mining, Reclamation and Environment. 34: 55-74. DOI: 10.1080/17480930.2018.1532866  0.378
2020 Noriega R, Pourrahimian Y, Ben-Awuah E. A two-step mathematical programming framework for undercut horizon optimization in block caving mines Resources Policy. 65: 101586. DOI: 10.1016/J.Resourpol.2020.101586  0.736
2020 Hosseini NS, Ben-Awuah E, Pourrahimian Y. A two-step approach to incorporate cut-off grade and stockpiling in oil sands mine planning optimization framework Computers & Operations Research. 115: 104659. DOI: 10.1016/J.Cor.2019.03.005  0.746
2020 Nikbin V, Ataee-Pour M, Shahriar K, Pourrahimian Y. A 3D approximate hybrid algorithm for stope boundary optimization Computers & Operations Research. 115: 104475. DOI: 10.1016/J.Cor.2018.05.012  0.35
2019 Pu Y, Apel DB, Pourrahimian Y, Chen J. Evaluation of Rockburst Potential in Kimberlite Using Fruit Fly Optimization Algorithm and Generalized Regression Neural Networks Archives of Mining Sciences. 64: 279-296. DOI: 10.24425/Ams.2019.128683  0.32
2019 Sotoudeh F, Ataei M, Kakaie R, Pourrahimian Y. Application of Sequential Gaussian Conditional Simulation into Underground Mine Design Under Grade Uncertainty Journal of Mining and Environment. DOI: 10.22044/Jme.2019.7333.1582  0.402
2019 Khodayari F, Pourrahimian Y, Liu WV. Production Scheduling with Horizontal Mixing Simulation in Block Cave Mining Journal of Mining Science. 55: 789-803. DOI: 10.1134/S1062739119056161  0.4
2019 Khodayari F, Pourrahimian Y. Long-term production scheduling optimization and 3D material mixing analysis for block caving mines Mining Technology. 128: 65-76. DOI: 10.1080/25726668.2018.1563742  0.448
2019 Nezhadshahmohammad F, Aghababaei H, Pourrahimian Y. Conditional draw control system in block-cave production scheduling using mathematical programming International Journal of Mining, Reclamation and Environment. 33: 223-246. DOI: 10.1080/17480930.2017.1385155  0.541
2019 Nikbin V, Ataee-pour M, Shahriar K, Pourrahimian Y, MirHassani SA. Stope boundary optimization: A mathematical model and efficient heuristics Resources Policy. 62: 515-526. DOI: 10.1016/J.Resourpol.2018.10.007  0.443
2018 Nezhadshahmohammad F, Aghababaei H, Pourrahimian Y. Draw rate management system using mathematical programming in extraction sequence optimisation of block cave mining International Journal of Mining and Mineral Engineering. 9: 32. DOI: 10.1504/Ijmme.2018.10012317  0.481
2017 Nezhadshahmohammad F, Pourrahimian Y, Aghababaei H. Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling International Journal of Mining Science and Technology. 28: 941-950. DOI: 10.1016/J.Ijmst.2017.11.005  0.552
2016 Ben-Awuah E, Richter O, Elkington T, Pourrahimian Y. Strategic mining options optimization: Open pit mining, underground mining or both International Journal of Mining Science and Technology. 26: 1065-1071. DOI: 10.1016/J.Ijmst.2016.09.015  0.702
2015 Khodayari F, Pourrahimian Y. Mathematical programming applications in block-caving scheduling: A review of models and algorithms International Journal of Mining and Mineral Engineering. 6: 234-257. DOI: 10.1504/IJMME.2015.071174  0.475
2014 Pourrahimian Y, Askari-Nasab H. An application of mathematical programming to determine the best height of draw in block-cave sequence optimisation Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 123: 162-172. DOI: 10.1179/1743286314Y.0000000061  0.746
2012 Pourrahimian Y, Askari-Nasab H, Tannant D. Mixed-Integer Linear Programming formulation for block-cave sequence optimisation International Journal of Mining and Mineral Engineering. 4: 26-49. DOI: 10.1504/Ijmme.2012.047998  0.751
2011 Askari-Nasab H, Pourrahimian Y, Ben-Awuah E, Kalantari S. Mixed integer linear programming formulations for open pit production scheduling Journal of Mining Science. 47: 338-359. DOI: 10.1134/S1062739147030117  0.698
2010 Eugene BA, Kalantari S, Pourrahimian Y, Hooman AN. Hierarchical mine production scheduling using discrete-event simulation International Journal of Mining and Mineral Engineering. 2: 137-158. DOI: 10.1504/Ijmme.2010.035314  0.422
2009 Gheibie S, Aghababaei H, Hoseinie SH, Pourrahimian Y. Modified Kuz-Ram fragmentation model and its use at the Sungun Copper Mine International Journal of Rock Mechanics and Mining Sciences. 46: 967-973. DOI: 10.1016/J.Ijrmms.2009.05.003  0.321
Show low-probability matches.