Maremi A, Ben-Awuah E, Pourrahimian Y. An automated production targeting goal programming framework for oil sands mine planning considering organic rich solids Mining Technology. 129: 53-67. DOI: 10.1080/25726668.2020.1749431 |
0.682 |
|
2020 |
Zarate EU, Pourrahimian Y, Boisvert J. Optimizing block caving drawpoints over multiple geostatistical models International Journal of Mining, Reclamation and Environment. 34: 55-74. DOI: 10.1080/17480930.2018.1532866 |
0.378 |
|
2020 |
Noriega R, Pourrahimian Y, Ben-Awuah E. A two-step mathematical programming framework for undercut horizon optimization in block caving mines Resources Policy. 65: 101586. DOI: 10.1016/J.Resourpol.2020.101586 |
0.736 |
|
2020 |
Hosseini NS, Ben-Awuah E, Pourrahimian Y. A two-step approach to incorporate cut-off grade and stockpiling in oil sands mine planning optimization framework Computers & Operations Research. 115: 104659. DOI: 10.1016/J.Cor.2019.03.005 |
0.746 |
|
2020 |
Nikbin V, Ataee-Pour M, Shahriar K, Pourrahimian Y. A 3D approximate hybrid algorithm for stope boundary optimization Computers & Operations Research. 115: 104475. DOI: 10.1016/J.Cor.2018.05.012 |
0.35 |
|
2019 |
Pu Y, Apel DB, Pourrahimian Y, Chen J. Evaluation of Rockburst Potential in Kimberlite Using Fruit Fly Optimization Algorithm and Generalized Regression Neural Networks Archives of Mining Sciences. 64: 279-296. DOI: 10.24425/Ams.2019.128683 |
0.32 |
|
2019 |
Sotoudeh F, Ataei M, Kakaie R, Pourrahimian Y. Application of Sequential Gaussian Conditional Simulation into Underground Mine Design Under Grade Uncertainty Journal of Mining and Environment. DOI: 10.22044/Jme.2019.7333.1582 |
0.402 |
|
2019 |
Khodayari F, Pourrahimian Y, Liu WV. Production Scheduling with Horizontal Mixing Simulation in Block Cave Mining Journal of Mining Science. 55: 789-803. DOI: 10.1134/S1062739119056161 |
0.4 |
|
2019 |
Khodayari F, Pourrahimian Y. Long-term production scheduling optimization and 3D material mixing analysis for block caving mines Mining Technology. 128: 65-76. DOI: 10.1080/25726668.2018.1563742 |
0.448 |
|
2019 |
Nezhadshahmohammad F, Aghababaei H, Pourrahimian Y. Conditional draw control system in block-cave production scheduling using mathematical programming International Journal of Mining, Reclamation and Environment. 33: 223-246. DOI: 10.1080/17480930.2017.1385155 |
0.541 |
|
2019 |
Nikbin V, Ataee-pour M, Shahriar K, Pourrahimian Y, MirHassani SA. Stope boundary optimization: A mathematical model and efficient heuristics Resources Policy. 62: 515-526. DOI: 10.1016/J.Resourpol.2018.10.007 |
0.443 |
|
2018 |
Nezhadshahmohammad F, Aghababaei H, Pourrahimian Y. Draw rate management system using mathematical programming in extraction sequence optimisation of block cave mining International Journal of Mining and Mineral Engineering. 9: 32. DOI: 10.1504/Ijmme.2018.10012317 |
0.481 |
|
2017 |
Nezhadshahmohammad F, Pourrahimian Y, Aghababaei H. Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling International Journal of Mining Science and Technology. 28: 941-950. DOI: 10.1016/J.Ijmst.2017.11.005 |
0.552 |
|
2016 |
Ben-Awuah E, Richter O, Elkington T, Pourrahimian Y. Strategic mining options optimization: Open pit mining, underground mining or both International Journal of Mining Science and Technology. 26: 1065-1071. DOI: 10.1016/J.Ijmst.2016.09.015 |
0.702 |
|
2015 |
Khodayari F, Pourrahimian Y. Mathematical programming applications in block-caving scheduling: A review of models and algorithms International Journal of Mining and Mineral Engineering. 6: 234-257. DOI: 10.1504/IJMME.2015.071174 |
0.475 |
|
2014 |
Pourrahimian Y, Askari-Nasab H. An application of mathematical programming to determine the best height of draw in block-cave sequence optimisation Transactions of the Institutions of Mining and Metallurgy, Section a: Mining Technology. 123: 162-172. DOI: 10.1179/1743286314Y.0000000061 |
0.746 |
|
2012 |
Pourrahimian Y, Askari-Nasab H, Tannant D. Mixed-Integer Linear Programming formulation for block-cave sequence optimisation International Journal of Mining and Mineral Engineering. 4: 26-49. DOI: 10.1504/Ijmme.2012.047998 |
0.751 |
|
2011 |
Askari-Nasab H, Pourrahimian Y, Ben-Awuah E, Kalantari S. Mixed integer linear programming formulations for open pit production scheduling Journal of Mining Science. 47: 338-359. DOI: 10.1134/S1062739147030117 |
0.698 |
|
2010 |
Eugene BA, Kalantari S, Pourrahimian Y, Hooman AN. Hierarchical mine production scheduling using discrete-event simulation International Journal of Mining and Mineral Engineering. 2: 137-158. DOI: 10.1504/Ijmme.2010.035314 |
0.422 |
|
2009 |
Gheibie S, Aghababaei H, Hoseinie SH, Pourrahimian Y. Modified Kuz-Ram fragmentation model and its use at the Sungun Copper Mine International Journal of Rock Mechanics and Mining Sciences. 46: 967-973. DOI: 10.1016/J.Ijrmms.2009.05.003 |
0.321 |
|