Year |
Citation |
Score |
2016 |
Faghihi V, Reinschmidt KF, Kang JH. Objective-driven and Pareto Front analysis: Optimizing time, cost, and job-site movements Automation in Construction. 69: 79-88. DOI: 10.1016/J.Autcon.2016.06.003 |
0.358 |
|
2015 |
Hosseinian S, Reinschmidt KF. Finding Best Model to Forecast Construction Duration of Road Tunnels with New Austrian Tunneling Method Using Bayesian Inference: Case Study of Niayesh Highway Tunnel in Iran Transportation Research Record. 2522: 113-120. DOI: 10.3141/2522-11 |
0.421 |
|
2015 |
Faghihi V, Nejat A, Reinschmidt KF, Kang JH. Automation in construction scheduling: a review of the literature The International Journal of Advanced Manufacturing Technology. 81: 1845-1856. DOI: 10.1007/S00170-015-7339-0 |
0.348 |
|
2014 |
Pillai RG, Trejo D, Gardoni P, Mary MB, Reinschmidt K. Time-variant flexural reliability of posttensioned, segmental concrete bridges exposed to corrosive environments Journal of Structural Engineering (United States). 140. DOI: 10.1061/(Asce)St.1943-541X.0000991 |
0.323 |
|
2014 |
Faghihi V, Reinschmidt KF, Kang JH. Construction scheduling using Genetic Algorithm based on Building Information Model Expert Systems With Applications. 41: 7565-7578. DOI: 10.1016/J.Eswa.2014.05.047 |
0.402 |
|
2013 |
Kim BC, Shim E, Reinschmidt KF. Probability distribution of the project payback period using the equivalent cash flow decomposition Engineering Economist. 58: 112-136. DOI: 10.1080/0013791X.2012.760696 |
0.459 |
|
2012 |
Kim BC, Reinschmidt KF. A second moment approach to probabilistic IRR using taylor series Engineering Economist. 57: 1-19. DOI: 10.1080/0013791X.2011.624677 |
0.318 |
|
2012 |
Kim H, Reinschmidt KF. Market Structure and Organizational Performance of Construction Organizations Journal of Management in Engineering. 28: 212-220. DOI: 10.1061/(Asce)Me.1943-5479.0000082 |
0.303 |
|
2011 |
Kim BC, Reinschmidt KF. Combination of project cost forecasts in earned value management Journal of Construction Engineering and Management. 137: 958-966. DOI: 10.1061/(Asce)Co.1943-7862.0000352 |
0.407 |
|
2010 |
Pillai RG, Gardoni P, Trejo D, Hueste MBD, Reinschmidt KF. Probabilistic models for the tensile strength of corroding strands in posttensioned segmental concrete bridges Journal of Materials in Civil Engineering. 22: 967-977. DOI: 10.1061/(Asce)Mt.1943-5533.0000096 |
0.315 |
|
2010 |
Kim BC, Reinschmidt KF. Probabilistic forecasting of project duration using Kalman filter and the earned value method Journal of Construction Engineering and Management. 136: 834-843. DOI: 10.1061/(Asce)Co.1943-7862.0000192 |
0.395 |
|
2009 |
Gardoni P, Pillai RG, Hueste MBD, Reinschmidt K, Trejo D. Probabilistic capacity models for corroding posttensioning strands calibrate using laboratory results Journal of Engineering Mechanics. 135: 906-916. DOI: 10.1061/(Asce)Em.1943-7889.0000021 |
0.317 |
|
2009 |
Kim BC, Reinschmidt KF. Probabilistic forecasting of project duration using bayesian inference and the beta distribution Journal of Construction Engineering and Management. 135: 178-186. DOI: 10.1061/(Asce)0733-9364(2009)135:3(178) |
0.414 |
|
2007 |
Gardoni P, Reinschmidt KF, Kumar R. A probabilistic framework for Bayesian adaptive forecasting of project progress Computer-Aided Civil and Infrastructure Engineering. 22: 182-196. DOI: 10.1111/J.1467-8667.2007.00478.X |
0.397 |
|
2007 |
Trejo D, Reinschmidt K. Justifying Materials Selection for Reinforced Concrete Structures. II: Economic Analysis Journal of Bridge Engineering. 12: 38-44. DOI: 10.1061/(Asce)1084-0702(2007)12:1(38) |
0.322 |
|
2007 |
Trejo D, Reinschmidt K. Justifying Materials Selection for Reinforced Concrete Structures. I: Sensitivity Analysis Journal of Bridge Engineering. 12: 31-37. DOI: 10.1061/(Asce)1084-0702(2007)12:1(31) |
0.355 |
|
2006 |
Reinschmidt K, Trejo D. Economic Value of Building Faster Journal of Construction Engineering and Management-Asce. 132: 759-766. DOI: 10.1061/(Asce)0733-9364(2006)132:7(759) |
0.4 |
|
1991 |
Reinschmidt KF, Griffis FH(, Bronner PL. Integration of Engineering, Design, and Construction Journal of Construction Engineering and Management-Asce. 117: 756-772. DOI: 10.1061/(Asce)0733-9364(1991)117:4(756) |
0.364 |
|
Show low-probability matches. |