Mehmet R. Taner, Ph.D. - Publications

Affiliations: 
2001 North Carolina State University, Raleigh, NC 
Area:
Industrial Engineering, Operations Research

9 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2015 Şahinyazan FG, Kara BY, Taner MR. Selective vehicle routing for a mobile blood donation system European Journal of Operational Research. 245: 22-34. DOI: 10.1016/J.Ejor.2015.03.007  0.335
2015 Taner MR, Kara BY. Endogenous Effects of Hubbing on Flow Intensities Networks and Spatial Economics. DOI: 10.1007/S11067-015-9314-6  0.34
2012 Taner MR, Karasan OE, Yavuzturk E. Scheduling beams with different priorities on a military surveillance radar Ieee Transactions On Aerospace and Electronic Systems. 48: 1725-1739. DOI: 10.1109/Taes.2012.6178092  0.407
2007 Taner MR, Hodgson TJ, King RE, Schultz SR. Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure Computers and Industrial Engineering. 52: 57-70. DOI: 10.1016/J.Cie.2006.10.008  0.738
2004 Schultz SR, Hodgson TJ, King RE, Taner MR. Minimizing Lmax for the single machine scheduling problem with family set-ups International Journal of Production Research. 42: 4315-4330. DOI: 10.1080/00207540410001716561  0.76
2004 Schultz SR, Taner MR. Parallel dedicated machine scheduling with A single server: Full precedence case Iie Annual Conference and Exhibition 2004. 841-846.  0.64
2003 Taner MR, Hodgson TJ, King RE, Thoney KA. Satisfying due-dates in a job shop with sequence-dependent family set-ups International Journal of Production Research. 41: 4153-4169. DOI: 10.1080/0020754031000149167  0.696
2002 Thoney KA, Hodgson TJ, King RE, Taner MR, Wilson AD. Satisfying due-dates in large multi-factory supply chains Iie Transactions. 34: 803-811. DOI: 10.1080/07408170208928913  0.719
2002 Thoney KA, Hodgson TJ, King RE, Taner MR, Wilson AD. Satisfying due-dates in large multi-factory supply chains Iie Transactions (Institute of Industrial Engineers). 34: 803-811. DOI: 10.1023/A:1015500822105  0.759
Show low-probability matches.