Scott R. Schultz, Ph.D. - Publications
Affiliations: | 2001 | North Carolina State University, Raleigh, NC |
Area:
Industrial EngineeringYear | Citation | Score | |||
---|---|---|---|---|---|
2015 | Schultz SR, Atzmon J. A simulation based heuristic approach to a resource investment problem (RIP) Proceedings - Winter Simulation Conference. 2015: 3411-3422. DOI: 10.1109/WSC.2014.7020174 | 0.351 | |||
2011 | Schultz SR, Fithian P. A practical approach for modeling large scale resource investment problems 61st Annual Iie Conference and Expo Proceedings. | 0.307 | |||
2007 | Taner MR, Hodgson TJ, King RE, Schultz SR. Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure Computers and Industrial Engineering. 52: 57-70. DOI: 10.1016/J.Cie.2006.10.008 | 0.635 | |||
2007 | Joines JA, Culbreth CT, Schultz SR. The lumber procurement and kiln scheduling problem: A hybrid-GA approach Wood and Fiber Science. 39: 628-638. | 0.328 | |||
2006 | Schultz SR. Simulation case study: Some issues when dealing with multiple resources and machine stoppages 2006 Iie Annual Conference and Exhibition. | 0.318 | |||
2005 | Calar G, Lachman A, Rogers G, Schultz SR. A scheduling/routing solution for a service routing problem Iie Annual Conference and Exposition 2005. | 0.364 | |||
2004 | Schultz SR, Hodgson TJ, King RE, Thoney KA. Minimizing Lmax for large-scale, job-shop scheduling problems International Journal of Production Research. 42: 4893-4907. DOI: 10.1080/00207540410001721754 | 0.695 | |||
2004 | Schultz SR, Hodgson TJ, King RE, Taner MR. Minimizing Lmax for the single machine scheduling problem with family set-ups International Journal of Production Research. 42: 4315-4330. DOI: 10.1080/00207540410001716561 | 0.647 | |||
2004 | Schultz SR, Taner MR. Parallel dedicated machine scheduling with A single server: Full precedence case Iie Annual Conference and Exhibition 2004. 841-846. | 0.682 | |||
Show low-probability matches. |